Plan Review Details - Permit 21070053
Plan Review Stops For Permit 21070053
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status N Date 2021-07-16 Cont ID  
Sent By cthroop Date 2021-07-16 Time 07:45 Rev Time 0.00
Received By cthroop Date 2021-07-16 Time 06:27 Sent To  
Notes
2021-07-16 07:45:43POOL DEMO

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2021-09-16 Cont ID  
Sent By cthroop Date 2021-09-16 Time 16:39 Rev Time 0.00
Received By cthroop Date 2021-09-16 Time 15:04 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2021-07-28 Cont ID  
Sent By cthroop Date 2021-07-28 Time 09:38 Rev Time 0.00
Received By cthroop Date 2021-07-28 Time 09:34 Sent To  
Notes
2021-07-28 09:39:23PLAN REVIEW BUILDING
  
 CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II PX3169/SFP306
 INSPECTOR BN4338
 BUILDING OFFICIAL BU1635
 ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935
 DEVELOPMENT SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 2017 NEC
  
 2ND REVIEW
  
 RESULTS: DENIED
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 NOTICE: COMMENTS FROM 1ST REVIEW HAVE NOT BEEN
 ADDRESSED. SEE BELOW.
  
 NOTICE: SOW-POOL TO BE FILLED, SHELL TO REMAIN IN
 GROUND
 NOTICE: POOL REMOVAL REQUIREMENTS UPLOADED TO
 SUPPORTING DOCS
 NOTICE: DEBRIS DISPOSAL FORM UPLOADED TO SUPPORTING
 DOCS
  
 THE FOLLOWING ITEMS ARE REQUIRED PER THE POOL REMOVAL
 REQUIREMENTS:
  
 1.PROVIDE A SITE PLAN. SHOW THE LOCATION AND SIZE OF
 EXISTING POOL. YOU MAY USE A COPY OF THE MOST RECENT
 BOUNDRY LINE SURVEY.
 1A). IDENTIFY ALL EXISTING STRUCTURES.
 1B). IDENTIFY PROPERTY LINES.
  
 2.SUBMIT A REPORT FROM A GEOTECHNICAL ENGINEER.
 SEE NOTE; PG 2 OF 2.
  
 3.PROVIDE A COMPLETED DEMOLITION DEBRIS DISPOSAL FORM.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-07-16 Cont ID  
Sent By cthroop Date 2021-07-16 Time 08:30 Rev Time 0.00
Received By cthroop Date 2021-07-16 Time 06:27 Sent To  
Notes
2021-07-16 08:30:48PLAN REVIEW BUILDING
  
 CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II PX3169/SFP306
 INSPECTOR BN4338
 BUILDING OFFICIAL BU1635
 ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935
 DEVELOPMENT SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 2017 NEC
  
 1ST REVIEW
  
 RESULTS: DENIED
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 NOTICE: SOW-POOL TO BE FILLED, SHELL TO REMAIN IN
 GROUND
 NOTICE: POOL REMOVAL REQUIREMENTS UPLOADED TO
 SUPPORTING DOCS
 NOTICE: DEBRIS DISPOSAL FORM UPLOADED TO SUPPORTING
 DOCS
  
 THE FOLLOWING ITEMS ARE REQUIRED PER THE POOL REMOVAL
 REQUIREMENTS:
  
 1.PROVIDE A SITE PLAN. SHOW THE LOCATION AND SIZE OF
 EXISTING POOL. YOU MAY USE A COPY OF THE MOST RECENT
 BOUNDRY LINE SURVEY.
 1A). IDENTIFY ALL EXISTING STRUCTURES.
 1B). IDENTIFY PROPERTY LINES.
  
 2.SUBMIT A REPORT FROM A GEOTECHNICAL ENGINEER.
 SEE NOTE; PG 2 OF 2.
  
 3.PROVIDE A COMPLETED DEMOLITION DEBRIS DISPOSAL FORM.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-09-17 Cont ID  
Sent By cthroop Date 2021-09-17 Time 13:08 Rev Time 0.00
Received By cthroop Date 2021-09-17 Time 12:56 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 3 Status P Date 2021-08-31 Cont ID  
Sent By rrossano Date 2021-08-31 Time   Rev Time 0.00
Received By rrossano Date 2021-08-31 Time   Sent To  
Notes
2021-08-31 13:54:30PASSED WITH PROVISOS:
  
 PLEASE MAINTAIN POLLUTION CONTROL PLAN ONSITE SHOWING:
  
 A) WHERE SILT SCREENS WILL BE INSTALLED, INCLUDING A
 DETAIL SHOWING THE SILT FENCE INSTALLATION. THESE BMPS
 ARE TO BE USED AS PER THE FDEP EROSION AND SEDIMENT
 CONTROL MANUAL.
 B) SHOW THE PROTECTION OF ALL ON-SITE CATCH BASINS, IF
 ANY.
 C) SHOW PROTECTION OF ALL OFF-SITE CATCH BASINS, IF
 ANY.
 D) INCLUDE DETAILS AS TO THE TYPE OF PROTECTION USED ON
 THE CATCH BASINS, IF ANY.
 E) SHOW HOW SITE DIRT WILL NOT BE TRACKED INTO THE
 ROADS.
 F) SHOW HOW DUST CONTROL WILL BE PROVIDED.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected], WWW.WPB.ORG/ENGINEERING
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2021-08-04 Cont ID  
Sent By rrossano Date 2021-08-04 Time   Rev Time 0.00
Received By rrossano Date 2021-08-04 Time   Sent To I
Notes
2021-08-04 11:38:29PLEASE ADDRESS BUILDING COMMENTS.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2021-07-19 Cont ID  
Sent By rrossano Date 2021-07-19 Time   Rev Time  
Received By rrossano Date 2021-07-19 Time   Sent To  
Notes
2021-07-19 12:34:45PLEASE PROVIDE POLLUTION CONTROL PLAN ONSITE SHOWING:
  
 A) WHERE SILT SCREENS WILL BE INSTALLED, INCLUDING A
 DETAIL SHOWING THE SILT FENCE INSTALLATION. THESE BMPS
 ARE TO BE USED AS PER THE FDEP EROSION AND SEDIMENT
 CONTROL MANUAL.
 B) SHOW THE PROTECTION OF ALL ON-SITE CATCH BASINS, IF
 ANY.
 C) SHOW PROTECTION OF ALL OFF-SITE CATCH BASINS, IF
 ANY.
 D) INCLUDE DETAILS AS TO THE TYPE OF PROTECTION USED ON
 THE CATCH BASINS, IF ANY.
 E) SHOW HOW SITE DIRT WILL NOT BE TRACKED INTO THE
 ROADS.
 F) SHOW HOW DUST CONTROL WILL BE PROVIDED.
  
 HTTP://WWW.DEP.STATE.FL.US/WATER/STORMWATER/NPDES/DOCS/
 CONST_ACTIVITY.PDF
  
 HTTP://WWW.PBCO-NPDES.ORG/CONSTRUN.ASP?MENU=SWMPMENU
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO
 PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1098
 FAX: (561) 494-1116
 MOBILE: (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 MANNY GONZALEZ
 SENIOR ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2021-07-23 Cont ID  
Sent By fmittner Date 2021-07-23 Time 09:54 Rev Time 0.00
Received By fmittner Date 2021-07-23 Time 09:54 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2021-09-17 Cont ID  
Sent By cthroop Date 2021-09-17 Time 13:08 Rev Time 0.00
Received By cthroop Date 2021-08-30 Time 17:59 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-08-04 Cont ID  
Sent By lmarchan Date 2021-08-04 Time 14:49 Rev Time 0.00
Received By lmarchan Date 2021-07-27 Time 16:30 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-07-23 Cont ID  
Sent By lmarchan Date 2021-07-23 Time 12:00 Rev Time 0.00
Received By lmarchan Date 2021-07-15 Time 14:27 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2021-07-16 Cont ID  
Sent By cthroop Date 2021-07-16 Time 07:45 Rev Time 0.00
Received By cthroop Date 2021-07-16 Time 06:27 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2021-07-23 Cont ID  
Sent By fmittner Date 2021-07-23 Time 09:54 Rev Time 0.00
Received By fmittner Date 2021-07-23 Time 09:54 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved