| Plan Review Stops For Permit 21070015 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
P |
Date |
2022-02-07 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2022-02-07 |
Time |
14:58 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2022-02-07 |
Time |
14:58 |
Sent To |
|
|
| Notes |
| 2022-02-07 14:58:33 | ADDRESS APPROPRIATE FOR PROJECT. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
4 |
Status |
P |
Date |
2023-01-23 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2023-01-23 |
Time |
09:35 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2023-01-23 |
Time |
09:35 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2022-05-20 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2022-05-20 |
Time |
08:07 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2022-05-20 |
Time |
08:07 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2022-04-18 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2022-04-18 |
Time |
11:36 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2022-04-18 |
Time |
11:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2022-02-25 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2022-02-25 |
Time |
14:56 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2022-02-25 |
Time |
14:56 |
Sent To |
|
|
| Notes |
| 2022-02-25 15:00:26 | ELECTRIC REVIEW FAILED | | | 1) NO CONDUIT, CONDUCTORS, OR OVERCURRENT PROTECTION | | | DETAILED. FBC 107.2 | | | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RESUBMITTAL FORM. | | | | | | CODES IN EFFECT: | | | FBC = FLORIDA BUILDING CODE 2020 7TH EDITION | | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA | | | BUILDING CODE 2020 7TH ED. | | | FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2020 | | | 7TH EDITION | | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 | | | 7TH EDITION | | | FBC RE = FLORIDA RESIDENTIAL CODE 2020 7TH EDITION | | | NEC = NFPA 70 2017 EDITION, NATIONAL ELECTRICAL CODE | | | FS = FLORIDA STATUTES | | | | | | V/R, | | | | | | MICHAEL PETERSON | | | ELECTRICAL PLANS EXAMINER | | | [email protected] | | | 561-805-6746 | | | |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
N |
Date |
2022-03-22 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-03-22 |
Time |
07:05 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-03-22 |
Time |
07:05 |
Sent To |
|
|
| Notes |
| 2022-03-22 07:05:51 | PER ES/AA, IMPROVEMENT IS ENTIRELY ON PRIVATE PROPERTY. | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2023-02-01 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2023-02-01 |
Time |
13:26 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2023-01-23 |
Time |
07:09 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2022-05-20 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2022-05-20 |
Time |
09:27 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2022-05-12 |
Time |
06:55 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2022-04-21 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2022-04-21 |
Time |
15:31 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2022-03-28 |
Time |
06:32 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-03-22 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-03-22 |
Time |
07:05 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-02-06 |
Time |
08:46 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
F |
Date |
2021-07-13 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-07-13 |
Time |
11:56 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-07-13 |
Time |
11:04 |
Sent To |
|
|
| Notes |
| 2021-07-13 11:56:13 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | SCOPE OF WORK IS NOT CLEAR. | | | | | | THREE APPLICATIONS WERE SUBMITTED, STATING THE WORK IS | | | IN THE ROW. 21070174, 21070015, 21070017. IT IS NOT | | | CLEAR WHERE THE WORK IS TO BE DONE. THE WORK IS SHOWN | | | IN THE RIGHT OF WAY (ONE PERMIT REQUIRED FOR ROW WORK), | | | AT 303 BANYAN (BUT THAT APPLICATION GIVES THE PARCEL ID | | | FOR 345 BANYAN, SO NOT CLEAR WHERE YOU ARE WORKING). | | | THERE IS AN ISSUED BUILDING PERMIT FOR 345 BANYAN, BUT | | | WORK IS SHOWN AT THAT LOCATION. IS THAT WORK SHOWN ON | | | THE BUILDING PERMIT PLANS? IF NOT, THAT SHOULD BE A | | | REVISION TO THE BUILDING PERMIT. WORK IS SHOWN AT 303 | | | BANYAN, AS WELL AS THE ROW. HAS A PERMIT BEEN APPLIED | | | FOR AT THAT LOCATION? | | | | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2023-01-23 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2023-01-23 |
Time |
09:35 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2023-01-23 |
Time |
09:35 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2022-05-20 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2022-05-20 |
Time |
09:21 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2022-05-20 |
Time |
09:12 |
Sent To |
|
|
| Notes |
| 2022-05-20 09:27:23 | SIGNATURE REVIEW FAILED | | | 1) PLAN LABELED E1.0.1 WITH TITLE BLOCKS OF MCVEGH & | | | MAN GUM ENGINEERS AND KEITH SPINA ACHITECT HAVE TITLE | | | BLOCKS WITH NO DIGITAL SIGNATURE | | | 2) REPORT LABLED STRUCTURAL REVIEW LETTER HAS A SEAL | | | AND DIGITAL SIGNATURE BY CHELSEA MARAJH ENGINEER WITH A | | | DIGITAL SIGNATURE THAT IS CORRUPTED AND CANNOT BE | | | CERTIFIED | | | | | | PLEASE FOLLOW THE DIRECTIONS OUTLINED BELOW TO CORRECT | | | THIS ISSUE. | | | | | | FS471/FS481 DOCUMENTS PREPARED BY AN ARCHITECT OR | | | ENGINEER AND SUBMITTED FOR PUBLIC RECORD ARE TO BE | | | SIGNED, SEALED, DATED ORIGINALS OR DIGITALLY SEALED AND | | | SIGNED. | | | | | | EITHER UPLOAD A DIGITALLY OR ELECTRONICALLY SIGNED PLAN | | | TO THE SIGNATURE FOLDER WITH YOUR RESUBMITTAL (IF | | | APPLICABLE) AND COMPLETE THE UPLOAD TASK IN PROJECTDOX, | | | OR YOU CAN SUBMIT ONE ORIGINAL SIGNED AND SEALED PAPER | | | ORIGINAL WITH A WET SIGNATURE TO THE BUILDING | | | DEPARTMENT. | | | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RESUBMITTAL FORM. | | | | | | SIGNATURE DOCUMENTS ARE TYPICALLY REVIEWED WITHIN TWO | | | BUSINESS DAYS AFTER SUBMITTAL; DIGITALLY SIGNED | | | DOCUMENTS ARE PREFERRED. | | | PLEASE EMAIL [email protected] AND CC TO | | | [email protected] WITH ANY QUESTIONS | | | | | | MICHAEL PETERSON | | | ELECTRICAL PLANS EXAMINER | | | [email protected] | | | 561-805-6746 | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2022-04-21 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2022-04-21 |
Time |
15:21 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2022-04-21 |
Time |
15:08 |
Sent To |
|
|
| Notes |
| 2022-04-21 15:31:06 | SIGNATURE REVIEW | | | | | | 1- DRAWINGS WERE NOT SIGNED AND SEALED BY THE ENGINEER | | | OF RECORD SHOWN ON THETTITLE BLOCK. DRAWINGS NEED TO BE | | | SIGNED AND SEALED AS REQUIRED BY CHAPTER 471 F.S. WHEN | | | SUBMITTING DRAWINGS/DOCUMENTS FOR PUBLIC RECORDS. | | | | | | NOTE: SUBMIT DRAWINGS ELECTRONICALLY WITH DIGITAL | | | SIGNATURE OR PROVIDE HARD COPY WITH ORIGINAL SEAL AND | | | SIGNATURE. | | | | | | 2- WIND LOADING CALCULATIONS HAVE A COPY OF A DIGITAL | | | SIGNATURE. DIGITAL SIGNATURES ARE NOT ALLOWED TO BE | | | PRINTED. ALL DOCUMENTS PREPARED BY A LICENSED ENGINEER | | | NEED TO HAVE THE ORIGINAL SEAL AND SIGNATURE OF THE | | | ENGINEER OF RECORD AS REQUIRED BY SEC. 61G15-23.003 FAC | | | AND CHAPTER 471 F.S. WHEN SUBMITTING PLANS/DOCUMENTS | | | FOR PUBLIC RECORDS. | | | | | | NOTE: SUBMIT DRAWINGS ELECTRONICALLY WITH DIGITAL | | | SIGNATURE OR PROVIDE HARD COPY WITH ORIGINAL SEAL AND | | | SIGNATURE. | | | | | | ENGINEERS | | | 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND | | | SEALING ELECTRONICALLY TRANSMITTED PLANS, | | | SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS. | | | | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2023-02-01 |
|
|
Cont ID |
|
| Sent By |
ckimmerl |
Date |
2023-02-01 |
Time |
09:30 |
Rev Time |
0.00 |
| Received By |
ckimmerl |
Date |
2023-02-01 |
Time |
09:30 |
Sent To |
|
|
| Notes |
| 2023-02-01 09:30:30 | PROVISO: SLIPFITTER SHALL BE SFX AND FIXTURE AND POLE | | | SHALL BE BLACK. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2022-04-20 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
2022-04-20 |
Time |
11:14 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
2022-04-20 |
Time |
11:14 |
Sent To |
|
|
| Notes |
| 2022-04-20 11:15:19 | PROVISO: SLIPFITTER SHALL BE SFX AND FIXTURE AND POLE | | | SHALL BE BLACK. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2022-03-04 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
2022-03-04 |
Time |
10:42 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
2022-03-04 |
Time |
10:41 |
Sent To |
|
|
| Notes |
| 2022-03-04 10:50:37 | 1. SPEC FOR POLE AND FIXTURE SHALL MATCH DOWNTOWN CITY | | | STANDARD AS FOLLOWS: (S55-007) | | | -35W32LED4K-T-GL-LE3-UNIV-DMG-SFX-RCD7-TN3-COLTX. | | | 2. POLE SHALL BE A MINIMUM OF 18 INCHES AWAY FROM THE | | | FACE OF CURB. | | | 3. PLEASE CALL FOR FULL SPEC SHEET. | | | FOR ADDITIONAL QUESTIONS PLEASE CONTACT ANA MARIA | | | APONTE AT 561-822-1439 | | | |
|
|