|
 |
 |
 |
 |
 |
Plan Review Details - Permit 21061362
| Plan Review Stops For Permit 21061362 |
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
P |
Date |
2021-06-29 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2021-06-29 |
Time |
|
Rev Time |
|
| Received By |
rrossano |
Date |
2021-06-29 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-06-29 08:32:11 | REVIEWED UNDER FORMAL ENGINEERING SUBMITTAL E20060022. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2021-07-08 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-07-08 |
Time |
18:02 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-06-23 |
Time |
12:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2021-07-08 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-07-08 |
Time |
18:02 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-07-08 |
Time |
18:02 |
Sent To |
|
|
| Notes |
| 2021-07-08 18:03:13 | 07/08/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING) | | | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | | PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES | | | FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, | | | STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT | | | THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK | | | OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | | AVOID VOIDING OF THE PERMIT. | | | | | | LUIS A. CRESPO | | | PLUMBING PLAN EXAMINER / INSPECTOR | | | EMAIL: [email protected] OFFICE: 561 805-6720 | | | | | | A SLAB REPAIR DETAIL WILL BE REQUIRED. SHOW THE WIDTH | | | OF THE | | | REPAIR, THE MINIMUM THICKNESS OF THE CONCRETE O BE | | | REPLACED, | | | AND THE PSI OF THE CONCRETE. SHOW THE SIZE AND LENGTH | | | OF THE | | | DOWELS, THE MINIMUM EMBEDMENT DEPTH INTO THE EXISTING | | | SLAB, | | | AND THE SPACING OF THE DOWELS IN THE CENTER. THE REPAIR | | | SHALL | | | ALSO INCLUDE TERMITE TREATMENT OF THE SOIL AND THE | | | REQUIRED | | | VAPOR BARRIER OVER THE SOIL. A COPY OF THE TERMITE | | | CERTIFICATE | | | SHALL BE ONSITE FOR A FINAL INSPECTION. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2021-07-08 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-07-08 |
Time |
18:02 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-07-08 |
Time |
18:02 |
Sent To |
|
|
| Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |