| 2021-07-13 16:36:17 | 1ST REVIEW FBC-2017 PLUMBING |
| | PERMIT- 21061171 |
| | 7/12/21 |
| | |
| | CODES IN EFFECT: |
| | FBC P- FLORIDA PLUMBING CODE 6TH EDITION 2017 |
| | FBC ACC- FLORIDA ACCESSIBILITY CODE 6TH EDITION 2017 |
| | FBC B- FLORIDA BUILDING CODE 6TH EDITION 2017 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE 6TH EDITION |
| | 2017 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC |
| | |
| | PLAN REVIEW RESULTS FOR THE MAIN POOL- DENIED. |
| | |
| | 1) THE DOH RECEIPT OF APPLICATION AND THE PLANS DO NOT |
| | BEAR THE 200 ARKONA COURT ADDRESS- SECTION 107.2.1 WPB. |
| | |
| | 2) DESIGN CRITERIA: PROVIDE A LIST OF CODES AND |
| | STANDARDS USED IN THE DESIGN OF THE POOLS- SECTION |
| | 107.2.1 WPB. PLEASE INCLUDE THE EDITION DATES OF EACH |
| | CODE OR STANDARD. THE LA CLARA CONDOMINIUM PROJECT WAS |
| | DESIGNED IN ACCORDANCE WITH THE FBC- 2017 CODES, SO FOR |
| | PURPOSE OF THIS REVIEW, IT IS ASSUMED THE POOL WAS ALSO |
| | DESIGNED UNDER THE 2017 CODE. BECAUSE THE POOL IS BEING |
| | LOCATED IN A MULTI-FAMILY BUILDING, COMPLIANCE WITH THE |
| | FAIR HOUSING ACT DESIGN MANUAL IS REQUIRED AND SHALL BE |
| | NOTED IN THE DESIGN CRITERIA. THE PLANS SHALL ALSO |
| | REFLECT COMPLIANCE WITH THE SPECIFICATIONS IN THE |
| | MANUAL INCLUDING ACCESSIBLE ROUTES. |
| | |
| | 3) REFER TO SECTION 454.1 FBC B AND SECTION 106.5 FBC |
| | ACC- PLEASE PROVIDE NOTES INDICATING WHICH GROUP OF |
| | PEOPLE WILL HAVE ACCESS TO THE POOL- THE GENERAL PUBLIC |
| | OR EXCLUSIVELY BY THE RESIDENTS OF LA CLARA. PLEASE |
| | NOTE THAT THE DOH RECEIPT INDICATES A PUBLIC POOL WHICH |
| | WOULD IMPLY COMPLIANCE WITH THE FBC ACC IS REQUIRED- |
| | SECTION 101.1.2. PLEASE REFER TO SECTION 242.2 FBC ACC- |
| | A MINIMUM OF TWO ACCESSIBLE ENTRIES INTO THE POOL |
| | INCLUDING A LIFT ARE REQUIRED FOR PUBLIC POOLS. FURTHER |
| | REVIEW OF ACCESSIBILITY COMPLIANCES FOR THE POOL ARE |
| | STOPPED AT THIS POINT PENDING SUBMITTAL OF MORE |
| | INFORMATION. |
| | |
| | 4) SP-102 & SP-108: THE LOCATION OF THE COLLECTOR TANK |
| | AT THE PLANTER, AND ACCESS TO THE TANK DO NOT APPEAR TO |
| | BE IN COMPLIANCE WITH SECTION 454.1.5.1 FBC B. PLEASE |
| | CLARIFY OF THE TANK IS IN AN ENCLOSURE AS REQUIRED AND |
| | PROVIDE DETAILS TO SHOW COMPLIANCE WITH ITEMS BELOW: |
| | A) 454.1.5.2: ENCLOSURE DETAILS. B) 451.5.3: ENCLOSURE |
| | MATERIALS. C) 454.1.5.4: VENTILATION. D) 454.1.5.5: |
| | ACCESS. E) 454.1.5.6: SIZE. F) 454.1.5.7: LIGHTING. G) |
| | 454.1.5.8: STORAGE. H) 454.1.5.9: HOSE BIBS- PLEASE |
| | SHOW THE LOCATION AND PROVIDE PLUMBING DETAILS AND |
| | SPECIFICATIONS. I) PLEASE NOTE THAT THE COLLECTOR TANK |
| | DETAIL ON SP-108 SHOWS A HINGED LOCKABLE COVER AS |
| | OPTIONAL. |
| | |
| | 5) SP-102: DECK DRAINS ARE CALLED OUT BUT NOT SHOWN- |
| | SECTION 454.1.3.1.2 FBC B. |
| | |
| | 6) SP-102: PROVIDE COMPLETE PLANS AND SPECIFICATIONS |
| | FOR INSTALLATION OF THE RINSE SHOWER (MDF MODEL 500)- |
| | SECTION 107.2.1 WPB & 606.2 FBC P. |
| | |
| | A) SUBMIT MANUFACTURER'S SPECIFICATIONS AND |
| | INSTALLATION GUIDELINES FOR THE SHOWER UNIT AND SHOWER |
| | VALVE- SECTIONS 417.1, 424.1, & 424.3 FBC P. |
| | |
| | B) SHOW THE MAIN HOT AND COLD WATER LINES TO THE RINSE |
| | SHOWER TOWER AND INDICATE HOW WATER WILL BE DRAINED |
| | FROM THE AREA TO AN APPROVED PLACE OF DISPOSAL- |
| | SECTIONS 454.1.6.2 & 454.1.3.1.2 FBC B. CLARIFY IF THE |
| | UNIT IS PRE-PIPED AND HOW WATER CONNECTIONS ARE BEING |
| | MADE, SHUT OFF VALVE AND WATER HAMMER ARRESTOR |
| | LOCATIONS ETC. A WATER RISER DRAWING MAY BE HELPFUL IN |
| | EXPEDITING THE REVIEW- SECTION 107.3.5.1.3 WPB. |
| | |
| | C) FAIR HOUSING ACT MANUAL COMPLIANCE: SHOW THE |
| | ACCESSIBLE ROUTE TO THE RINSE SHOWER AND PROVIDE |
| | ENLARGED DRAWINGS AND CUTS SHOWING THE LOCATIONS AND |
| | HEIGHTS OF SHOWER HEADS AND CONTROLS, AND COMPLIANCE |
| | DETAILS FOR SPACE ALLOWANCE, REACH RANGES, AND CONTROLS |
| | AND OPERATING MECHANISMS- REFER TO PAGES 2.10- 2.12 OF |
| | THE MANUAL. |
| | |
| | 7) SP-102, 108: SHOW THE LOCATION OF THE REQUIRED |
| | POTABLE WATER BACKFLOW PREVENTER FOR THE MAKEUP WATER |
| | LINE TO THE COLLECTOR TANK- SECTION 454.1.6.3 FBC P & |
| | SECTION 608.3 FBC P. THE DETAIL ON SP-108 SHOWS WHAT |
| | APPEARS TO BE THE REQUIRED MAKEUP WATER CONTROLLER |
| | (AUTO FILL) AT THE COLLECTOR TANK HOWEVER IT IS NOT |
| | CALLED OUT- SECTION 454.1.6.5.11 FBC B. PLEASE NOTE |
| | THAT SEPARATE PERMITS ARE REQUIRED FOR INSTALLATION OF |
| | THE DEVICES- SECTION 105.1 WPB. |
| | |
| | 8) SP-105: SHOW LOCATIONS OF ALL ITEMS IN THE PIPING |
| | LEGEND- E, F, G, H, I, J, K, & L- SECTION 107.2.1 WPB. |
| | |
| | 9) SP-105: IT APPEARS THE LOCATIONS OF THE GUTTER DRAIN |
| | OUTLETS ARE EXCEEDING THE MAXIMUM 15 FT. SPACING PER |
| | SECTION 454.1.6.5.3.1 FBC B. |
| | |
| | 10) SP-105 & 107: PLEASE INDICATE THE SLOPE OF THE |
| | GUTTERS- SECTION 454.1.6.5.3.1 FBC B. |
| | |
| | 11) SP-104,105,108, & 301: PLEASE CLARIFY THE ELEVATION |
| | HEIGHT OF THE COLLECTOR TANK. ALTHOUGH IT IS SHOWN ON |
| | THE SAME FLOOR LEVEL OF THE POOL, IT APPEARS THAT THE |
| | DRAIN INLETS OF THE COLLECTOR TANK WOULD HAVE TO BE AT |
| | A LOWER ELEVATION THAN THE DRAIN PIPING FROM THE |
| | GUTTER, FLOOR AND WALL DRAINS IN ORDER FOR THE SYSTEM |
| | TO GRAVITY DRAIN INTO THE TANK. PLEASE INDICATE THE |
| | SLOPES OF THE GRAVITY DRAIN PIPING SHOWN ON THE PLAN |
| | USING ELEVATION HEIGHT MEASUREMENTS- SECTION 704.1 FBC |
| | P. THE COLLECTOR TANK DETAIL ON SP-108 INDICATES THE |
| | STRUCTURAL DESIGN OF THE TANK SUPPORTING SLAB TO BE |
| | DESIGNED BY OTHERS. PLEASE PROVIDE MORE INFORMATION |
| | ABOUT THE STRUCTURAL DESIGN IN ORDER TO CLARIFY THE |
| | LOCATION OF THE TANK AND HOW IT IS BEING SUPPORTED- |
| | SECTION 107.2.1 WPB. PLEASE SUBMIT MANUFACTURER'S SPECS |
| | FOR THE TANK- SECTION 454.1.5.1 FBC B. |
| | |
| | 12) SP-108: THE BACKWASH LINE SHALL NOT DRAIN INTO THE |
| | CITY SANITARY SYSTEM- SECTION 454.1.6.5.15 & SEC. |
| | 90-126(5) WPB CODE OF ORDINANCES. |
| | |
| | 13) SP-105, 108: SHOW THE LOCATION OF THE RAINWATER |
| | OVERFLOW LINE TO THE STORM DRAIN. CONCERNING F AND J |
| | (POOL MAINTENANCE LINE DRAIN), PLEASE VERIFY THAT ANY |
| | WASTE WATER DRAINING FROM THE POOL SYSTEM INTO THE |
| | STORM DRAINAGE SYSTEM HAS BEEN DECHLORINATED OR IT IS |
| | PROHIBITED- SEC. 90-203 & 90-205- WPB CODE OF |
| | ORDINANCES. |
| | |
| | 14) SP-105 & 107: PROVIDE A WALL INLET DETAIL- SECTION |
| | 454.1.6.5.9 FBC B. |
| | |
| | 15) SP-108 & 301: PROVIDE THE PUMP CURVE FOR THE |
| | SELECTED PUMP AND SUBMIT MANUFACTURER'S SPECIFICATIONS- |
| | SECTION 454.1.6.5.4 FBC B. |
| | |
| | 16) SP-108, 301: SUBMIT MANUFACTURER'S SPECIFICATIONS |
| | FOR RECIRCULATION AND TREATMENT EQUIPMENT INCLUDING THE |
| | SAND FILTER, CHEMICAL STORAGE TANKS, CHEMICAL |
| | CONTROLLER, AND FEEDERS SHOWING THE EQUIPMENT CONFORMS |
| | WITH REQUIRED STANDARDS NSF/ANSI STANDARD 50, |
| | CIRCULATION SYSTEM COMPONENTS AND RELATED MATERIALS FOR |
| | SWIMMING POOL, SPAS/HOT TUBS, DATED APRIL 2007- SECTION |
| | 454.1.6.5.1 FBC B. |
| | |
| | 17) SP-107 & 301: SUBMIT MANUFACTURER'S SPECIFICATIONS |
| | FOR THE MAIN DRAINS AND COVERS SHOWING CONFORMANCE WITH |
| | THE ANSI/APSP 16 STANDARD- 454.1.6.5.10.2 FBC P. |
| | |
| | 18) SP-301: INCLUDE THE HOSE BIB IN THE EQUIPMENT |
| | SCHEDULE- SECTION 608.15.4.2 FBC P. |
| | |
| | 19) SP-108, 301: THE GAS WATER HEATER INSTALLATIONS |
| | INCLUDING THE GAS PIPING, COMBUSTION AND VENTING PLANS, |
| | AND EQUIPMENT ROOM VENTILATION SYSTEM SHALL BE REVIEWED |
| | UNDER SEPARATE PERMITS AND PLAN SUBMITTALS- SECTION |
| | 105.1, 107.2.1 AND 107.3.5.3.1 WPB. PLEASE NOTE THAT |
| | THE EQUIPMENT ROOM VENTILATION SHALL BE IN COMPLIANCE |
| | WITH THE FBC BUILDING AND MECHANICAL CODES. |
| | |
| | 20) PLEASE SHOW COMPLIANCE WITH THE FOLLOWING SECTIONS |
| | FROM THE FBC EC: |
| | C404.9.1 HEATERS. THE ELECTRIC POWER TO ALL HEATERS |
| | SHALL BE CONTROLLED BY A READILY ACCESSIBLE ON-OFF |
| | SWITCH THAT IS AN INTEGRAL PART OF THE HEATER, MOUNTED |
| | ON THE EXTERIOR OF THE HEATER, OR EXTERNAL TO AND |
| | WITHIN 3 FEET (914 MM) OF THE HEATER. OPERATION OF SUCH |
| | SWITCH SHALL NOT CHANGE THE SETTING OF THE HEATER |
| | THERMOSTAT. SUCH SWITCHES SHALL BE IN ADDITION TO A |
| | CIRCUIT BREAKER FOR THE POWER TO THE HEATER. GAS-FIRED |
| | HEATERS SHALL NOT BE EQUIPPED WITH CONTINUOUSLY BURNING |
| | IGNITION PILOTS. |
| | C404.9.2 TIME SWITCHES. TIME SWITCHES OR OTHER CONTROL |
| | METHODS THAT CAN AUTOMATICALLY TURN OFF AND ON HEATERS |
| | AND PUMP MOTORS ACCORDING TO A PRESET SCHEDULE SHALL BE |
| | INSTALLED FOR HEATERS AND PUMP MOTORS. HEATERS AND PUMP |
| | MOTORS THAT HAVE BUILT-IN TIME SWITCHES SHALL BE IN |
| | COMPLIANCE WITH THIS SECTION. |
| | EXCEPTIONS: |
| | 1. WHERE PUBLIC HEALTH STANDARDS REQUIRE 24-HOUR PUMP |
| | OPERATION. |
| | 2. PUMPS THAT OPERATE SOLAR- AND WASTE-HEAT-RECOVERY |
| | POOL HEATING SYSTEMS. |
| | C404.9.3 COVERS. OUTDOOR HEATED SWIMMING POOLS AND |
| | OUTDOOR PERMANENT SPAS SHALL BE EQUIPPED WITH A |
| | VAPOR-RETARDANT COVER ON OR AT THE WATER SURFACE OR A |
| | LIQUID COVER OR OTHER MEANS PROVEN TO REDUCE HEAT LOSS. |
| | |
| | 21) PLEASE NOTE THAT SEPARATE PERMITS AND PLANS ARE |
| | REQUIRED FOR INSTALLATION OF THE POOL HEATER AND GAS |
| | PIPING, THE MAKEUP WATER LINE, AUTOFILL AND BACKFLOW |
| | PREVENTER, AND THE HOSE BIB AND POOL RINSE SHOWER- |
| | SECTION 105.1 & 107.2.1 WPB. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. |
| | CHRISTOPHER L. COLE |
| | MECHANICAL/PLUMBING PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |