|
 |
 |
 |
 |
 |
Plan Review Details - Permit 21060982
| Plan Review Stops For Permit 21060982 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2022-08-24 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-08-24 |
Time |
09:43 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-08-24 |
Time |
09:16 |
Sent To |
|
|
| Notes |
| 2022-08-24 09:46:02 | PETER E VALENTI | | | BUILDING PLANS EXAMINER II | | | [email protected] | | | 561 805 6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC R = FBC RESIDENTIAL | | | FBC EB = EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC M = FBC MECHANICAL | | | FBC FG = FBC FUEL GAS | | | | | | BUILDING REVIEW APPROVED WITH PROVISO: | | | | | | ALL WORK IS SUBJECT TO FIELD INSPECTOR'S APPROVAL. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2022-04-18 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-04-18 |
Time |
09:32 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-04-18 |
Time |
09:22 |
Sent To |
|
|
| Notes |
| 2022-04-18 09:57:59 | PETER E VALENTI | | | BUILDING PLANS EXAMINER II | | | [email protected] | | | 561 805 6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC R = FBC RESIDENTIAL | | | FBC EB = EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC M = FBC MECHANICAL | | | FBC FG = FBC FUEL GAS | | | | | | BUILDING REVIEW DENIED: | | | | | | FBC B 107.2.1 & FBC R507, PLEASE PROVIDE MORE | | | INFORMATION. PROVIDE SPECIFIC DETAILS AS TO MATERIAL, | | | CONNECTIONS, & MEASUREMENTS (ELEVATIONS/HEIGHTS) | | | INCLUDING: | | | DECK POSTS TO FOOTINGS, DECK LEDGER/BEAMS/JOISTS TO | | | POSTS, AND DECKING TO SUPPORTING LEDGERS/BEAMS/JOISTS. | | | FBC R 301.1.3, PLEASE PROVIDE SIGNED/SEALED APPROVAL | | | WITH CALCULATIONS FOR STRUCTURE INCLUDING | | | FOOTINGS/PILES. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-08-24 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-08-24 |
Time |
09:46 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-08-06 |
Time |
07:03 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-04-18 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-04-18 |
Time |
10:02 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-03-10 |
Time |
06:02 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2022-08-05 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2022-08-05 |
Time |
18:46 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2022-08-05 |
Time |
18:43 |
Sent To |
|
|
| Notes |
| 2022-08-05 18:47:55 | HARD COPY SHEET 01 WITH ENGINEER'S ORIGINAL | | | SEAL/SIGNATURE. JG. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2022-04-18 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-04-18 |
Time |
10:00 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-04-18 |
Time |
09:22 |
Sent To |
|
|
| Notes |
| 2022-04-18 10:02:36 | SIGNATURE REVIEW DENIED: | | | | | | FBC B 107.2.1, PROVIDE ENGINEERS SIGNED/SEALED APPROVED | | | DOCUMENTS STRUCTURE. ALL REQUIRED DOCUMENTS NEED TO BE | | | SIGNED/SEALED AS PER NOTES BELOW: | | | | | | FS 471/FS 481 DOCUMENTS PREPARED BY AN | | | ENGINEER/ARCHITECT AND SUBMITTED FOR PUBLIC RECORD ARE | | | TO BE SIGNED, SEALED & DATED ORIGINALS. A SCAN OF A | | | SIGNED/SEALED PLAN IS NOT CONSIDERED AN ORIGINAL. | | | UPLOAD OR EMAIL A DIGITALLY SIGNED (THIRD PARTY | | | VERIFIED) PLAN OR YOU CAN DELIVER AN ORIGINAL | | | SIGNED/SEALED PAPER ORIGINAL TO: | | | | | | PETER E VALENTI | | | BUILDING PLANS EXAMINER II | | | BUILDING DIVISION | | | CITY OF WEST PALM BEACH | | | 401 CLEMATIS STREET, 1ST FLOOR | | | WEST PALM BEACH, FL 33401 | | | FEEL FREE TO CONTACT ME AT 561 805 6673. | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2022-08-11 |
|
|
Cont ID |
|
| Sent By |
vbroglia |
Date |
2022-08-11 |
Time |
13:19 |
Rev Time |
0.00 |
| Received By |
vbroglia |
Date |
2022-08-11 |
Time |
13:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2022-03-23 |
|
|
Cont ID |
|
| Sent By |
vbroglia |
Date |
2022-03-23 |
Time |
10:07 |
Rev Time |
0.00 |
| Received By |
vbroglia |
Date |
2022-03-23 |
Time |
10:07 |
Sent To |
|
|
| Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |