| 2021-07-08 18:50:53 | 1ST REVIEW FBC-2020 PLUMBING |
| | PERMIT- 21060845 |
| | 7/8/21 |
| | |
| | CODES IN EFFECT: |
| | FBC P- FLORIDA PLUMBING CODE 7TH EDITION 2020 |
| | FBC ACC- FLORIDA ACCESSIBILITY CODE 7TH EDITION 2020 |
| | FBC B- FLORIDA BUILDING CODE 7TH EDITION 2020 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE 7TH EDITION |
| | 2020 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) SHEET P1.0: REVISE THE 2020 FBC 7TH EDITION CODE |
| | SECTION TEXT TO MATCH THE TEXT LISTED UNDER SECTIONS |
| | 454.1.3.1.2, 454.1.3.1.6, AND 454.1.3.1.9. RED LINE |
| | TEXT HAS BEEN ADDED TO THESE SECTIONS IN THE NEW 2020 |
| | 7TH EDITION CODE WHICH IS PERTINENT TO THE DESIGN OF |
| | THE POOL- SECTION 107.2.1 WPB. |
| | |
| | 2) P1.2: IDENTIFY THE LOCATIONS OF THE DAY SPA POOL AND |
| | THE SALT SPA- SECTION 107.2.1 WPB. |
| | |
| | 3) P1.1 & P1.2: A COMPLETE REVIEW OF THE REQUIRED |
| | PLUMBING FIXTURE COUNTS FOR THE ADULT POOL, DAY SPA |
| | POOL, AND SALT SPA CANNOT BE COMPLETED AT THIS TIME DUE |
| | TO A LACK OF INFORMATION ON THE PLANS- THE NUMBER OF |
| | PLUMBING FIXTURES HAS NOT BEEN CALCULATED USING THE |
| | INDIVDUAL AND TOTAL SQUARE FOOTAGE AREAS OF THE POOLS |
| | AND SPA AS REQUIRED BYTABLE 454.16.1 FBC B.. PLEASE |
| | NOTE THAT THE ADULT POOL CALCULATION AND FLOOR PLAN ARE |
| | MISLABELED AS MAIN POOL AND SPA ON P1.1- PLEASE |
| | CORRECT. BECAUSE RESTROOM FACILITIES FOR THE ADULT |
| | POOL, DAY POOL AND SALT SPA ARE BEING PROVIDED BY THE |
| | HOTEL BUILDING, PLEASE REVIEW THE EXCEPTION UNDER |
| | SECTION 454.1.6.1.1 FBC B AND PROVIDE: A) THE FIXTURE |
| | REQUIREMENT FOR THE BUILDING. IF IT EXCEEDS THE |
| | REQUIREMENT IN TABLE 454.1.6.1 THEN THE BUILDING |
| | REQUIREMENT SHALL REGULATE THE FIXTURE COUNT, OTHERWISE |
| | THE FIXTURE COUNT SHALL BE BASED ON THE REQUIREMENT FOR |
| | THE POOL. UNDER NO CIRCUMSTANCES SHALL THE FIXTURE |
| | COUNTS BE CUMULATIVE. B) WOMEN'S RESTROOMS SHALL HAVE A |
| | RATIO OF THREE TO TWO WATER CLOSETS PROVIDED FOR WOMEN |
| | AS THE COMBINED TOTAL OF WATER CLOSETS AND URINALS |
| | PROVIDED FOR MEN. LAVATORY COUNTS SHALL BE EQUAL. |
| | PLEASE NOTE THE CURRENT PLAN FOR THE EXISTING RESTROOMS |
| | APPEARS TO BE NON-COMPLIANT. THE PLAN ALSO INDICATES |
| | OBSTRUCTED CLEAR FLOOR SPACE AT THE DIAPER CHANGING |
| | STATION IN THE UNISEX TOILET ROOM.. |
| | |
| | 4) P1.1 & P1.2: PLEASE VERIFY THE HOTEL LOCKER ROOM |
| | BATHROOMS ARE IN COMPLIANCE WITH SECTION 454.1.6.1.3 |
| | FBC B AND ARE CONSTRUCTED OF CONCRETE OR OTHER |
| | NONABSORBENT MATERIALS, WHICH HAVE A SMOOTH, |
| | SLIP-RESISTANT FINISH, AND SLOPE TO FLOOR DRAINS. IT |
| | APPEARS A FLOOR DRAIN MAY BE MISSING IN THE MEN'S |
| | LOCKER ROOM AT THE ACCESSIBLE TOILET ROOM OR STALL. |
| | |
| | 5) P1.2: IT APPEARS DECK DRAINS ARE MISSING ON THREE |
| | SIDES OF THE POOL DECK- SECTION 454.13.1.2. PLEASE |
| | PROVIDE A SITE DRAINAGE PLAN SHOWING WHERE THE DECK |
| | WATER WILL BE CONVEYED TO AN APPROVED PLACE OF |
| | DISPOSAL- SECTION 107.2.1 WPB. PLEASE INCLUDE A |
| | DRAINAGE PIPING LAYOUT PLAN. |
| | |
| | 6) P1.1 & AP2.0: LABEL THE LOCATION OF THE POOL LIFT |
| | AND SHOW THE REQUIRED CLEAR DECK SPACE- SECTIONS 242.2, |
| | 1009.2.1, & 1009.2.3 FBC ACC, AND SECTION 454.1.2.5.6 |
| | FBC B. |
| | |
| | 7) P1.0: THE POOL LIFT INFORMATION UNDER SPLASH SERIES |
| | INDICATES THE LIFTS ARE THIRD PARTY TESTED & VERIFIED |
| | ADA COMPLIANT AND STATE OF CALIFORNIA COMPLIANT. PLEASE |
| | SUBMIT CERTIFICATION DOCUMENTATION THE LIFTS ARE TESTED |
| | AND VERIFIED ADA COMPLIANT FOR USE IN THE STATE OF |
| | FLORIDA. PLEASE MARK OR HIGHLIGHT WHICH MODEL IN THE |
| | SCHEDULE IS PROPOSED TO BE INSTALLED- SECTION 107.2.1 |
| | WPB. |
| | |
| | 8) P1.0: SUBMIT MANUFACTURER'S SPECIFICATIONS AND |
| | INSTALLATION GUIDELINES FOR THE PROPOSED LIFT WITH |
| | APPROVAL STAMPS BY THE ENGINEER OF RECORD- SECTION |
| | 107.3.4 WPB. |
| | |
| | 9) P1.0: PLEASE PROVIDE ON THE PLAN OR ON A |
| | SUPPLEMENTAL PLAN ADDITIONAL ENLARGED IINSTALLATION |
| | DETAILS FOR THE LIFT THAT INDICATE COMPLIANCE WITH |
| | SECTIONS 1009.2.2 SEAT LOCATION, 1009.2.3 CLEAR DECK |
| | SPACE, 1009.2.4 SEAT HEIGHT, 1009.2.5 SEAT WIDTH, |
| | 1009.2.6 FOOTRESTS AND ARMRESTS, 1009.2.7 OPERATION. A) |
| | VERIFY COMPLIANCE WITH SECTION 1009.2.9 LIFTING |
| | CAPACITY. SINGLE PERSON POOL LIFTS SHALL HAVE A WEIGHT |
| | CAPACITY OF 300 POUNDS MINIMUM AND BE CAPABLE OF |
| | SUSTAINING A STATIC LOAD OF AT LEAST ONE AND A HALF |
| | TIMES THE RATED LOAD. |
| | |
| | 10) AP2.0, AP2.2, AP2.3 & AP2.4: PROVIDE A CIVIL PLAN |
| | OR SITE UTILITY PLAN SHOWING HOW WATER IS BEING |
| | SUPPLIED TO THE POOL AND THE LOCATION OF THE REQUIRED |
| | BACKFLOW PREVENTER- SECTIONS 454.1.6.3 FBC B AND |
| | SECTION 608.7 FBC P. PLEASE CLARIFY IF THE WATER SUPPLY |
| | LINE (AP7) TO THE COLLECTOR TANK IS ALSO THE MAIN WATER |
| | SUPPLY LINE TO THE POOL- SECTION 454.1.6.5.11 FBC B. |
| | PLEASE NOTE THAT A FL. LICENSED PLUMBING CONTRACTOR |
| | SHALL OBTAIN SEPARATE PERMITS FOR INSTALLATION OF THE |
| | WATER LINE AND AUTO FILL DEVICE, AND FOR THE REQUIRED |
| | BACKFLOW PREVENTER IN ACCORDANCE WITH FL. STATUTE |
| | 489.105, SECTION 105.1 WPB AND SEC. 90-33 WPB CODE OF |
| | ORDINANCES. PLERASE INCLUDE PLUMBING PIPING |
| | INSTALLATION DETAILS AND SPECIFICATIONS IN COMPLIANCE |
| | WITH SECTION 606 FBC P. |
| | |
| | 11) AP2.0, AP2.2, AP2.3 & AP2.4: PROVIDE A CIVIL PLAN |
| | OR SITE UTILITY PLAN SHOWING HOW WASTE WATER FROM THE |
| | POOL WILL BE DRAINED TO AN APPROVED PLACE OF DISPOSAL- |
| | SECTION 454.1.6.5.15 FBC B, AND SECS. 90-126 & 203 WPB |
| | CODE OF ORDINANCES. PLEASE INCLUDE PLUMBING PIPING |
| | DETAILS AND SPECIFICATIONS IN COMPLIANCE WITH SECTION |
| | 704 FBC P. |
| | |
| | 12) AP2.0, AP2.3 & AP2.4: SUBMIT MANUFACTURER'S |
| | SPECIFICATIONS FOR RECIRCULATION AND TREATMENT |
| | EQUIPMENT INCLUDING THE FILTERS, CHEMICAL CONTROLLER, |
| | SALT CHLORINE GENERATOR, AND TREATMENT FEEDERS SHOWING |
| | THE EQUIPMENT CONFORMS WITH REQUIRED STANDARDS NSF/ANSI |
| | STANDARD 50, CIRCULATION SYSTEM COMPONENTS AND RELATED |
| | MATERIALS FOR SWIMMING POOL, SPAS/HOT TUBS, DATED APRIL |
| | 2007- SECTION 454.1.6.5.1 FBC B. |
| | |
| | 13) AP2.0: SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE |
| | MAIN DRAIN AND COVER SHOWING CONFORMANCE WITH THE |
| | ANSI/APSP 16 STANDARD- 454.1.6.5.10.2 FBC P. PROVIDE AN |
| | ENLARGED MAIN DRAIN DETAIL IN COMPLIANCE WITH SECTION |
| | 454.1.6.5.10.2 FBC B. |
| | |
| | 14) AP2.0 & AP2.2: THE EQUIPMENT LIST CALLS OUT A |
| | PENTAIR MODE GUTTER BUT THE DETAIL CALLS OUT HAYWARD. |
| | PLEASE PROVIDE ADDITIONAL NOTES AT THE GUTTER DETAIL |
| | INDICATION COMPLIANCE WITH SECTION 454.1.6.5.3.1 |
| | PERIMETER OVERFLOW GUTTERS: THE LIP OF THE GUTTER SHALL |
| | BE UNIFORMLY LEVEL WITH A MAXIMUM TOLERANCE OF 1/4 INCH |
| | (6 MM) BETWEEN THE HIGH AND LOW AREAS. THE BOTTOM OF |
| | THE GUTTER SHALL BE LEVEL OR SLOPE TO THE DRAINS. |
| | |
| | 15) AP2.0 &AP2.2: PLEASE MODIFY THE EQUALIZER LINE |
| | INLET DETAIL TO SHOW A SPRING-LOADED CHECK VALVE WILL |
| | BE INSTALLED THAT WILL NOT ALLOW DIRECT SUCTION ON THE |
| | LINE, AND A PROTECTIVE COVER WILL BE INSTALLED THAT |
| | CONFORMS TO ASME/ANSI A112.19.8- SECTION |
| | 454.1.6.5.3.2.3 FBC B. |
| | |
| | 16) AP2.3 & AP2.4: SUBMIT MANUFACTURER'S SPECIFICATIONS |
| | FOR THE RECIRCULATION PUMP, CARTRIDGE FILTER, AND |
| | COLLECTOR TANK- SECTIONS 454.1.6.5.4, 454.1.6.5.5 & |
| | 454.1.6.510.5 FBC P. PLEAS LABEL ALL EQUIPMENT IN THE |
| | INDOOR EQUIPMENT ROOM AND OUTDOOR EQUIPMENT AREA THAT |
| | RELATIVE TO THEW SCHEDULE ON THE PLAN- SECTION 107.2.1 |
| | WPB. |
| | |
| | 17) AP2.0, AP2.3 & AP2.4: PROVIDE TOTAL DYNAMIC HEAD |
| | CALCULATIONS TO VERIFY PUMP SIZING AND PUMP SELECTION |
| | SHOWN IN THE PUMP CURVE- SECTION 454.1.6.5.4 FBC B. THE |
| | CALCULATIONS SHALL INCLUDE THE CALCULATED HEAD FOR |
| | PIPING AND EQUIPMENT. |
| | |
| | 18) AP2.0 & AP2.4: SHOW THE FLOW VELOCITIES OF THE |
| | PRESSURE PIPING AND THE SUCTION PIPE FROM THE PUMP TO |
| | THE COLLECTOR TANK IN THE PIPING DIAGRAM- SECTION |
| | 454.1.6.5.8 FBC B. |
| | |
| | 19) AP2.4: SHOW THE FLOW VELOCITIES OF THE MAIN DRAIN, |
| | GUTTER LINE, AND EQUALIZER LINE PIPING IN THE PIPING |
| | DIAGRAM- SECTION 454.1.6.5.8 FBC B. |
| | |
| | 20) P1.0, AP2.0: BASED ON THE PLAN NOTE ON P1.0, PLEASE |
| | INDICATE IF A TIME CLOCK WILL BE INSTALLED, AND THAT IF |
| | IT IS INSTALLED, THE RECIRCULATION SYSTEM SHUT DOWN |
| | TIME WILL NOT REDUCE THE POOL TURNOVER RATE TO LESS |
| | THAN A MINIMUM OF FOUR TURNOVERS OF THE POOL VOLUME PER |
| | DAY. CONSIDERING THE POOL IS DESIGNED AT A 150 GPM FLOW |
| | AT A 5.4-HOUR TURNOVER TIME- FOUR TURNOVERS PER DAY AT |
| | 5.4 HOURS EA. = 21.6 HOURS OF RECIRCULATION OPERATION |
| | TIME. THE NOTE INDICATES THE TIMER MAYL LIMIT OPERATION |
| | TO 3 HOURS BEFORE OPENING AND 3 HOURS AFTER CLOSING, |
| | HOWEVER THE POOL RULES INDICATE THE POOL IS ONLY OPEN |
| | FROM DAWN TO DUSK SECTION 454.1.6.5.2 FBC B. PLEASE |
| | REVISE THE NOTE TO INDICATE THE ACTUAL NUMBER OF HOURS |
| | PER DAY THAT THE RECIRCULATION SYSTEM SHALL RUN. |
| | |
| | 21) AP2.0: SHOW THE SPACING MEASUREMENTS OF THE FLOOR |
| | INLET BETWEEN INLETS AND BETWEEN INLETS AND ADJACENT |
| | WALLS- SECTION 454.1.6.5.9.4 FBC P. SUBMIT |
| | MANUFACTURER'S SPECIFICATIONS FOR THE INLETS- SECTION |
| | 454.1.6.5.9 FBC B. |
| | |
| | 22) AP2.0 & AP2.4: VERIFY FLOW RATE INDICATORS WILL BE |
| | INSTALLED ON THE RETURN PIPING AND SUBMIT |
| | MANUFACTURER'S SPECIFICATIONS- SECTION 454.1.6.5.13 FBC |
| | B. |
| | |
| | 23) P2.0, AP2.0: PLEASE INDICATE WHAT METHOD WILL BE |
| | USED TO CLEAN THE POOL- SECTION 454.1.6.5.12 FBC P. |
| | |
| | 24) P1.1: PROVIDE A WATER SUPPLY PIPING LAYOUT AND |
| | RISER DRAWING FOR INSTALLATION OF THE HOSE BIB AND POOL |
| | SHOWER- SECTION 602.2 FBC P AND 107.3.5.1.3 WPB. PLEASE |
| | PROVIDE EQUIPMENT SCHEDULES FOR THE FIXTURES ON THE |
| | PLAN- SECTIONS 412.3 & 608.16.4.2 FBC P. A) INDICATE |
| | HOW WATER FROM THE SHOWER WILL BE DRAINED TO AN |
| | APPROVED PLACE OF DISPOSAL- SECS. 90-126 & 203 WPB CODE |
| | OF ORDINANCES. PLEASE NOTE THE SHOWER DETAIL DOES NOT |
| | SHOW A DRAIN OR FLOOR SLOPE. |
| | |
| | 25) PLEASE SHOW COMPLIANCE WITH THE FOLLOWING SECTIONS |
| | FROM THE FBC EC: |
| | C404.9.1 HEATERS. THE ELECTRIC POWER TO ALL HEATERS |
| | SHALL BE CONTROLLED BY A READILY ACCESSIBLE ON-OFF |
| | SWITCH THAT IS AN INTEGRAL PART OF THE HEATER, MOUNTED |
| | ON THE EXTERIOR OF THE HEATER, OR EXTERNAL TO AND |
| | WITHIN 3 FEET (914 MM) OF THE HEATER. OPERATION OF SUCH |
| | SWITCH SHALL NOT CHANGE THE SETTING OF THE HEATER |
| | THERMOSTAT. SUCH SWITCHES SHALL BE IN ADDITION TO A |
| | CIRCUIT BREAKER FOR THE POWER TO THE HEATER. GAS-FIRED |
| | HEATERS SHALL NOT BE EQUIPPED WITH CONTINUOUSLY BURNING |
| | IGNITION PILOTS. |
| | C404.9.2 TIME SWITCHES. TIME SWITCHES OR OTHER CONTROL |
| | METHODS THAT CAN AUTOMATICALLY TURN OFF AND ON HEATERS |
| | AND PUMP MOTORS ACCORDING TO A PRESET SCHEDULE SHALL BE |
| | INSTALLED FOR HEATERS AND PUMP MOTORS. HEATERS AND PUMP |
| | MOTORS THAT HAVE BUILT-IN TIME SWITCHES SHALL BE IN |
| | COMPLIANCE WITH THIS SECTION. |
| | EXCEPTIONS: |
| | 1. 1.WHERE PUBLIC HEALTH STANDARDS REQUIRE 24-HOUR PUMP |
| | OPERATION. |
| | 2. 2.PUMPS THAT OPERATE SOLAR- AND WASTE-HEAT-RECOVERY |
| | POOL HEATING SYSTEMS. |
| | C404.9.3 COVERS. OUTDOOR HEATED SWIMMING POOLS AND |
| | OUTDOOR PERMANENT SPAS SHALL BE EQUIPPED WITH A |
| | VAPOR-RETARDANT COVER ON OR AT THE WATER SURFACE OR A |
| | LIQUID COVER OR OTHER MEANS PROVEN TO REDUCE HEAT LOSS. |
| | |
| | 26) P2.0, AP2.0: PLEASE NOTE THAT SEPARATE PERMITS ARE |
| | REQUIRED FOR INSTALLATION OF THE POOL HEATER AND GAS |
| | PIPING, THE POOL RESTROOM/EQUIPMENT ROOM BUILDING, THE |
| | POOL FENCE, AUTO FILL WATER LINE AND BACKFLOW |
| | PREVENTER, SITE DRAINAGE PIPING, AND THE INSTALLATIONS |
| | OF THE HOSE BIBS AND POOL SHOWER- SECTION 105.1 & |
| | 107.2.1 WPB. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL/PLUMBING PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |