Plan Review Details - Permit 21060688
Plan Review Stops For Permit 21060688
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status N Date 2021-09-20 Cont ID  
Sent By pvalenti Date 2021-09-20 Time 13:56 Rev Time 0.00
Received By pvalenti Date 2021-09-20 Time 13:56 Sent To  
Notes
2021-09-20 13:59:15ASBESTOS NOTIFICATION DOES NOT APPLY IN THIS CASE AS
 PER THE ASBESTOS NOTIFICATION GUIDE.

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2021-06-30 Cont ID  
Sent By pvalenti Date 2021-06-30 Time 07:24 Rev Time 0.00
Received By pvalenti Date 2021-06-30 Time 06:31 Sent To  
Notes
2021-06-30 07:25:25****CORRECTIONS****
  
 PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 ASBESTOS REQUIREMENTS:
  
 PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  
 THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO
 [email protected]. THE INFORMATION SHOULD BE IN PDF
 FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE INCLUDE
 THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT LINE.

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2021-10-29 Cont ID  
Sent By pvalenti Date 2021-10-29 Time 07:24 Rev Time 0.00
Received By pvalenti Date 2021-10-29 Time 07:24 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2021-10-20 Cont ID  
Sent By pvalenti Date 2021-10-20 Time 16:28 Rev Time 0.00
Received By pvalenti Date 2021-10-20 Time 16:02 Sent To  
Notes
2021-10-20 16:30:57PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561?805?6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 BUILDING REVIEW DENIED:
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING
 CODE, BUILDING 3303:
  
  
 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR PARTIAL, ON
 THEIR FORM "DEMOLITION APPLICATION"
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT?SERVICES/FORMS/B
 UILDING?PERMIT?FORMS
 UTILITIES DEPT, 561-822-2244.
 FAX THE COMPLETED "DEMOLITION APPLICATION" FORM TO
 561-822-2183.
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2021-09-20 Cont ID  
Sent By pvalenti Date 2021-09-20 Time 13:59 Rev Time 0.00
Received By pvalenti Date 2021-09-20 Time 13:59 Sent To  
Notes
2021-09-20 14:56:15PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 BUILDING REVIEW DENIED:
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING
 CODE, BUILDING 3303:
  
 1. UTILITY RELEASE ? FLORIDA POWER & LIGHT (ELECTRIC)
 RELEASE OF SERVICE CONFIRMATION
 PLEASE PROVIDE A NOTARIZED LETTER FROM A STATE LICENSED
 ELECTRICIAN STATING THAT THERE IS NO ELECTRICITY COMING
 FROM METER OR PANEL BREAKER BOX.
  
 3. UTILITY RELEASE ? CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR PARTIAL, ON
 THEIR FORM "DEMOLITION APPLICATION"
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT?SERVICES/FORMS/B
 UILDING?PERMIT?FORMS
 UTILITIES DEPT, 561?822?2244.
 FAX THE COMPLETED "DEMOLITION APPLICATION" FORM TO
 561?822?2183.
  
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION);
 SCHEDULE A FINAL PLUMBING #703 OR PROVIDE A NOTARIZED
 LETTER FROM A STATE LICENSED PLUMBING CONTRACTOR
 STATING THAT THERE IS NO SANITARY LINE COMING FROM
 DEMOLISHED STRUCTURE.
  
2021-09-20 14:38:18PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 BUILDING REVIEW DENIED:
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-06-30 Cont ID  
Sent By pvalenti Date 2021-06-30 Time 07:26 Rev Time 0.00
Received By pvalenti Date 2021-06-30 Time 06:31 Sent To  
Notes
2021-06-30 07:40:29****CORRECTIONS****
  
 PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 BUILDING REVIEW DENIED:
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING
 CODE, BUILDING 3303:
  
 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC)
 RELEASE OF SERVICE CONFIRMATION
  
 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS)
 RELEASE OF SERVICE CONFIRMATION
  
 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON
 THEIR FORM "DEMOLITION APPLICATION"
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
 WATER DOWN METHOD:
 IF A WATER TRUCK IS DESIRED, PROVIDE A LETTER STATING
 THE TANK SIZE AND THAT THE WATER TRUCK WILL BE ON-SITE
 AT ALL TIMES DURING DEMOLITION USING POTABLE WATER FROM
 AN OFF-SITE LOCATION ONLY.
 IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE
 NOTED ON THEIR FORM.
 IF SELECTING THE BACKFLOW - BEFORE SCHEDULING THE 703,
 THE BACKFLOW DEVICE NEEDS TO BE TESTED AND CERTIFIED BY
 THE CITY?S
 UTILITIES DEPT, 561-822-2244.
 FAX THE COMPLETED "DEMOLITION APPLICATION" FORM TO
 561-822-2183.
  
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION);
 SCHEDULE A FINAL PLUMBING #703.
  
 5. EXTERMINATION LETTER - LETTER FROM A LICENSED PEST
 CONTROL COMPANY STATING THAT
 DEMOLITION ADDRESS HAS BEEN INSPECTED AND/OR TREATED
 FOR RODENTS.
  
 6. COMPLETE THE DEMO DEBRIS FORM:
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
 IF THE FORM IS NOT AVAILABLE ONLINE, SEND A REQUEST FOR
 THE FORM TO [email protected].
  
 7. PROVIDE A SITE PLAN OR SURVEY SHOWING LOCATION OF
 THE STRUCTURE(S) TO BE DEMOLISHED,
 FBC 107.
  
 8. PROVIDE A STORMWATER POLLUTION PREVENTION PLAN.
  
 9. PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING
 ASBESTOS REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  
  
  
  
  

Review Stop E ELECTRICAL
Rev No 2 Status N Date 2021-09-27 Cont ID  
Sent By jleahy Date 2021-09-27 Time 13:55 Rev Time 0.00
Received By jleahy Date 2021-09-27 Time 13:53 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2021-07-01 Cont ID  
Sent By jleahy Date 2021-07-01 Time 18:33 Rev Time 0.00
Received By jleahy Date 2021-06-30 Time 13:14 Sent To  
Notes
2021-07-01 18:34:04NEEDS AN ELECTRICAL PERMIT JLEAHY

Review Stop ENG ENGINEERING CSD
Rev No 4 Status P Date 2021-10-29 Cont ID  
Sent By rrossano Date 2021-10-29 Time   Rev Time 0.00
Received By rrossano Date 2021-10-29 Time   Sent To I
Notes
2021-10-29 07:52:57PASSED WITH PROVISOS:
  
 MAINTAIN SILT FENCE ONSITE AROUND PERIMETER TO PROTECT
 NEIGHBORING PROPERTIES AND TO PREVENT ROADWAY FROM
 TRACKING OF DIRT FROM TRUCKS HAULING DEBRIS. PROTECT
 ANY STORM DRAIN INLETS IN VICINITY USING BEST
 MANAGEMENT PRACTICES (FILTER FABRIC, ETC.)
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES,
 YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL
 BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR
 DEMOLITION WORK. INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO, SENIOR PROJECT COORDINATOR,
 CITY OF WPB ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected]
 HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING-
 STANDARDS-DETAILS
  

Review Stop ENG ENGINEERING CSD
Rev No 3 Status F Date 2021-10-21 Cont ID  
Sent By rrossano Date 2021-10-21 Time   Rev Time 0.00
Received By rrossano Date 2021-10-21 Time   Sent To I
Notes
2021-10-21 12:23:02PLEASE ADDRESS BUILDING COMMENTS.

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2021-09-08 Cont ID  
Sent By rrossano Date 2021-09-08 Time   Rev Time 0.00
Received By rrossano Date 2021-09-08 Time   Sent To  
Notes
2021-09-08 10:57:28PLEASE ADDRESS PREVIOUS BUILDING DEPT. COMMENTS.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2021-08-04 Cont ID  
Sent By rrossano Date 2021-08-04 Time   Rev Time 0.00
Received By rrossano Date 2021-08-04 Time   Sent To  
Notes
2021-08-04 08:50:49PLEASE ADDRESS BUILDING COMMENTS.
  
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2021-08-17 Cont ID  
Sent By fmittner Date 2021-08-17 Time 09:55 Rev Time 0.00
Received By fmittner Date 2021-08-17 Time 09:55 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2021-10-22 Cont ID  
Sent By lmarchan Date 2021-10-22 Time 10:57 Rev Time 0.00
Received By lmarchan Date 2021-10-01 Time 07:12 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-09-27 Cont ID  
Sent By jleahy Date 2021-09-27 Time 13:55 Rev Time 0.00
Received By jleahy Date 2021-09-03 Time 16:16 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-08-19 Cont ID  
Sent By cthroop Date 2021-08-19 Time 11:31 Rev Time 0.00
Received By cthroop Date 2021-06-10 Time 10:39 Sent To  
Notes
2021-06-29 10:40:3506/29/21 TALKED TO MRS. MAYELIN. REMOVING REAR ONE
 STORY BUILDING NOT STORAGE BUILDING. CHANGED PERMIT
 TYPE TO DEMO PERMIT. JG.
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2021-06-30 Cont ID  
Sent By pvalenti Date 2021-06-30 Time 07:26 Rev Time 0.00
Received By pvalenti Date 2021-06-30 Time 06:31 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2021-08-17 Cont ID  
Sent By fmittner Date 2021-08-17 Time 09:55 Rev Time 0.00
Received By fmittner Date 2021-08-17 Time 09:55 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved