Plan Review Details - Permit 21060666
Plan Review Stops For Permit 21060666
Review Stop G GAS REVIEW
Rev No 2 Status P Date 2021-08-05 Cont ID  
Sent By lcrespo Date 2021-08-05 Time 15:57 Rev Time 0.00
Received By lcrespo Date 2021-08-05 Time 15:57 Sent To  
Notes
2021-08-05 15:58:4308/05/21 REVIEWED FOR CODE COMPLIANCE (GAS)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2021-06-22 Cont ID  
Sent By lcrespo Date 2021-06-22 Time 13:20 Rev Time 0.00
Received By lcrespo Date 2021-06-22 Time 12:32 Sent To  
Notes
2021-06-22 13:20:3805/12/21 1ST LP GAS REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. PLEASE PROVIDE A RISER DIAGRAM REQUIRED PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.3.5.3 (12) RESIDENTIAL
 GAS. SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED,
 ALL PIPE SIZES, AND). IN ADDITION, SHOW ON THE
 ISOMETRIC DRAWING THE LENGTH OF ALL CUT SECTIONS OF
 PIPE PER 2020 FBC RES. SECS. G2413.4.1, G2413.4.2.
 PLEASE SHOW AND LABEL ALL UNIONS IN FRONT OF REGULATOR
 1? OF EITHER SIDE, DRIP LEG, AND SHUTOFF VALVE PER THE
 2020 FBC RES. SEC G2421.2. PROVIDE THE TYPE OF GAS AND
 PRESSURE PER THE WPB AMENDMENTS TO FBC SEC.107.2.1.
  
 2. PLEASE SUBMIT MANUFACTURER?S SPECIFICATION
 SHEETS/INSTALLATION MANUAL FOR THE GENERATORS TO VERIFY
 COMPLIANCE WITH 2017 FBC FG SEC.305.1 OR 2017 FBC RES.
 SEC. G2408.1.
  
 3. THE GENERATOR EXHAUST IS REQUIRED TO BE 10 FEET FROM
 OPENINGS INTO A BUILDING. FBC-R303.5.1 INTAKE OPENINGS.
 MECHANICAL AND GRAVITY OUTDOOR AIR INTAKE OPENINGS
 SHALL BE LOCATED NOT LESS THAN 10 FEET (3048 MM) FROM
 ANY HAZARDOUS OR NOXIOUS CONTAMINANTS, SUCH AS VENTS,
 CHIMNEYS, PLUMBING VENTS, STREETS, ALLEYS, PARKING
 LOTS, AND LOADING DOCKS. PLEASE SHOW ON PLANS PERT THE
 WPB AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
 4. CLEARLY SHOW THE LOCATION AND CAPACITY OF LP
 TANK(S), TYPE OF TANK (DOT OR ASME), THE DISTANCE OF
 THE TANK FROM THE EXTERIOR BUILDING WALL AND ADJACENT
 PROPERTY LINES, THE DISTANCE OF THE TANK FROM ALL
 SOURCES OF IGNITION, OTHER CONTAINERS, BUILDINGS, AND
 THE LOCATION OF ANY BUILDING OPENINGS BELOW THE RELIEF
 VALVE OF THE TANK PER THE NFPA 58, TABLE 3-2.2.2.
  
 5. THE SUBMIT DETAILS FOR CATHODIC PROTECTION HAS SIZE
 (LBS.) BUT HOW MANY IN NUMBERS OF MAGNESIUM BAG(S),
 WIRE SIZE OF ANODE CABLE AMOUNT AND AMOUNT OF WATER TO
 ACTIVATE IT.
  
 6. THE LP TANK ANCHORING DETAIL IS SIGNED AND SEAL BUT
 THE CITY REQUIRES THE ORIGINAL OR A
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER TO BE
 USED IN ELECTRONIC PLAN REVIEW - OR - IF YOUR ENGINEER
 DOES NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE -
 PLEASE DROP OFF THE ORIGINAL SIGNED AND SEALED DOCUMENT
 ALONG WITH A "PLAN REVIEW REQUEST FORM" EXPLAINING THE
 REASON FOR SUBMITTING THE DOCUMENT OR DRAWINGS. THE
 PLAN REVIEW REQUEST FORM CAN BE OBTAINED BY EMAILING
 [email protected] AND ASKING FOR THE FORM.
  
 WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES.
 A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND WILL HELP EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-08-05 Cont ID  
Sent By lcrespo Date 2021-08-05 Time 15:57 Rev Time 0.00
Received By lcrespo Date 2021-08-04 Time 06:46 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-06-22 Cont ID  
Sent By lcrespo Date 2021-06-22 Time 13:21 Rev Time 0.00
Received By lcrespo Date 2021-06-11 Time 09:24 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status N Date 2021-08-05 Cont ID  
Sent By lcrespo Date 2021-08-05 Time 15:57 Rev Time 0.00
Received By lcrespo Date 2021-08-05 Time 15:57 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2021-06-22 Cont ID  
Sent By lcrespo Date 2021-06-22 Time 13:21 Rev Time 0.00
Received By lcrespo Date 2021-06-22 Time 12:32 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2021-07-01 Cont ID  
Sent By kalexand Date 2021-07-01 Time 12:26 Rev Time 0.00
Received By kalexand Date 2021-07-01 Time 12:25 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved