Plan Review Details - Permit 21060398
Plan Review Stops For Permit 21060398
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2021-06-25 Cont ID  
Sent By rmcphers Date 2021-06-25 Time 12:46 Rev Time 0.00
Received By rmcphers Date 2021-06-25 Time 12:46 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-06-18 Cont ID  
Sent By jleahy Date 2021-06-18 Time 12:49 Rev Time 0.00
Received By jleahy Date 2021-06-18 Time 12:44 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status P Date 2021-06-25 Cont ID  
Sent By lcrespo Date 2021-06-25 Time 12:44 Rev Time 0.00
Received By lcrespo Date 2021-06-25 Time 12:44 Sent To  
Notes
2021-06-25 12:45:0906/25/21 REVIEWED FOR CODE COMPLIANCE (GAS)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date   Cont ID  
Sent By   Date 2021-07-01 Time   Rev Time 0.00
Received By aoliver Date 2021-06-29 Time 07:06 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-06-28 Cont ID  
Sent By lcrespo Date 2021-06-28 Time 08:51 Rev Time 0.00
Received By ccarvaja Date 2021-06-10 Time 12:27 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2021-06-25 Cont ID  
Sent By lcrespo Date 2021-06-25 Time 12:44 Rev Time 0.00
Received By lcrespo Date 2021-06-25 Time 12:44 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-07-01 Cont ID  
Sent By ccole Date 2021-07-01 Time 14:29 Rev Time 0.00
Received By ccole Date 2021-07-01 Time 14:28 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2021-06-25 Cont ID  
Sent By rmcphers Date 2021-06-25 Time 12:46 Rev Time 0.00
Received By rmcphers Date 2021-06-25 Time 12:46 Sent To  
Notes
2021-06-25 12:52:42SIGNATURE REVIEW
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB 107.1
 1) GENERATOR PAD DRAWING (FROM ENGINEERING EXPRESS)
 NEEDS TO BE SIGNED AND SEALED BY THE ENGINEER - IT DOES
 NOT SHOW AS ELECTRONICALLY SIGNED IN ADOBE READER -
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. - OR -
 IF YOUR ARCHITECT OR ENGINEER DOES NOT HAVE AN
 ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN DROP OFF THE
 ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS TO THE
 FRONT DESK IN THE BUILDING DIVISION AT THE CITY HALL.
  

Review Stop Z ZONING
Rev No 1 Status P Date 2021-06-25 Cont ID  
Sent By rthermid Date 2021-06-25 Time 13:34 Rev Time 0.00
Received By kalexand Date 2021-06-25 Time 13:34 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved