| Plan Review Stops For Permit 21051502 |
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
1 |
Status |
N |
Date |
2021-05-26 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-05-26 |
Time |
20:04 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-05-26 |
Time |
20:04 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2021-11-29 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2021-11-29 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2021-11-29 |
Time |
11:34 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2021-10-15 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2021-10-15 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2021-10-15 |
Time |
10:06 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2021-07-16 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2021-07-16 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2021-07-16 |
Time |
15:40 |
Sent To |
|
|
| Notes |
| 2021-07-16 16:02:14 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | | | | 1) THERE ARE INDICATIONS OF THE VENTS TERMINATING AT | | | THE 2ND FLOOR LEVEL OF THE PARKING GARAGE. | | | | | | ADDITIONALLY, PLEASE PROVIDE DETAILS OR SPECS THAT THE | | | 3" PIPE SIZE IS SUFFIENCT FOR THIS TANK. | | | | | | PER NFPA 110 | | | | | | 7.10.2 EXHAUST SYSTEM INSTALLATION SHALL BE GASTIGHT TO | | | PREVENT | | | EXHAUST GAS FUMES FROM ENTERING INHABITED ROOMS OR | | | BUILDINGS | | | AND TERMINATE IN SUCH A MANNER THAT TOXIC FUMES CANNOT | | | REENTER A BUILDING OR STRUCTURE, PARTICULARLY THROUGH | | | WINDOWS, | | | AIR VENTILATION INLETS, OR THE ENGINE AIR-INTAKE | | | SYSTEM. | | | | | | PER NFPA 30 | | | | | | 22.6 VENT PIPING FOR ABOVEGROUND TANKS. PIPING FOR | | | NORMAL | | | AND EMERGENCY RELIEF VENTING SHALL BE CONSTRUCTED IN | | | ACCORDANCE | | | WITH CHAPTER 27. | | | | | | 27.8.1 VENT PIPING FOR ABOVEGROUND STORAGE TANKS. | | | 27.8.1.1 WHERE THE OUTLETS OF VENT PIPES FOR TANKS | | | STORING | | | CLASS I LIQUIDS ARE ADJACENT TO BUILDINGS OR PUBLIC | | | WAYS, THEY | | | SHALL BE LOCATED SO THAT VAPORS ARE RELEASED AT A SAFE | | | POINT | | | OUTSIDE OF BUILDINGS AND NOT LESS THAN 12 FT (3.6 M) | | | ABOVE THE | | | ADJACENT GROUND LEVEL. | | | 27.8.1.2 VAPORS SHALL BE DISCHARGED UPWARD OR | | | HORIZONTALLY | | | AWAY FROM ADJACENT WALLS. | | | 27.8.1.3 VENT OUTLETS SHALL BE LOCATED SO THAT VAPORS | | | WILL NOT BE | | | TRAPPED BY EAVES OR OTHER OBSTRUCTIONS AND SHALL BE AT | | | LEAST 5 FT | | | (1.5 M) FROM BUILDING OPENINGS AND AT LEAST 15 FT (4.5 | | | M) FROM | | | POWERED VENTILATION AIR INTAKE DEVICES. | | | | | | PLEASE REVIEW AND PROVIDE DETAILS FOR COMPLIANCE OR | | | CORRECT. | | | | | | | | | 2) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET | | | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE | | | ABOVE. | | | | | | | | | 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | | RE-SUBMITTAL OF THE ABOVE. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | | | | | | | | | | 7.10.2 EXHAUST SYSTEM INSTALLATION SHALL BE GASTIGHT TO | | | PREVENT | | | EXHAUST GAS FUMES FROM ENTERING INHABITED ROOMS OR | | | BUILDINGS | | | AND TERMINATE IN SUCH A MANNER THAT TOXIC FUMES CANNOT | | | REENTER A BUILDING OR STRUCTURE, PARTICULARLY THROUGH | | | WINDOWS, | | | AIR VENTILATION INLETS, OR THE ENGINE AIR-INTAKE | | | SYSTEM. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2021-11-29 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2021-11-29 |
Time |
11:39 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2021-11-24 |
Time |
11:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2021-11-22 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-11-22 |
Time |
13:00 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-11-22 |
Time |
13:00 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2021-10-28 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-10-28 |
Time |
12:34 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-10-25 |
Time |
09:30 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2021-10-19 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-10-19 |
Time |
09:57 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-10-13 |
Time |
07:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2021-07-30 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-07-30 |
Time |
13:06 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-07-15 |
Time |
10:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
5 |
Status |
P |
Date |
2021-11-29 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-11-29 |
Time |
08:02 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-11-29 |
Time |
08:02 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
4 |
Status |
P |
Date |
2021-11-22 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-11-22 |
Time |
12:57 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-11-22 |
Time |
12:57 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
F |
Date |
2021-10-28 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-10-28 |
Time |
12:27 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-10-28 |
Time |
12:27 |
Sent To |
|
|
| Notes |
| 2021-10-28 12:32:12 | PLEASE SEE PREVIOUS COMMENTS 1 AND 3 BELOW. I DO NOT | | | SEE ANYTHING ON SHEET M1-01A ABOUT THE FUEL PIPING | | | SYSTEM. PLEASE SHOW A DRAWING INDICATING THE PIPING | | | MATERIAL, SIZE AND ROUTE FROM THE FILL LOCATION TO THE | | | TANK INCLUDING ALL SHUT-OFF VALVES. FBC M 1305 | | | | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) SHEET M1.01A: PLEASE SHOW THE FUEL PIPING ON THE | | | DRAWING. FBC M 1305 | | | | | | 3) THE FUEL OIL SUPPLY LINE SHALL HAVE A BUILDING SHUT | | | OFF. FBC M 1307.1 | | | | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM. | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
F |
Date |
2021-10-19 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-10-19 |
Time |
09:36 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-10-19 |
Time |
09:36 |
Sent To |
|
|
| Notes |
| 2021-10-19 09:53:18 | PLEASE RESPOND TO THE 1ST CYCLE REVIEW COMMENTS LISTED | | | BELOW: | | | | | | | | | 1ST REVIEW FBC-2020 MECHANICAL | | | PERMIT-21051502 | | | | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) SHEET M1.01A: PLEASE SHOW THE FUEL PIPING ON THE | | | DRAWING. FBC M 1305 | | | | | | 3) THE FUEL OIL SUPPLY LINE SHALL HAVE A BUILDING SHUT | | | OFF. FBC M 1307.1 | | | | | | 4) PLEASE PROVIDE INFORMATION ON THE EXHAUST SILENCER. | | | FBC 107.2.1 | | | | | | 6) PLEASE PROVIDE INFORMATION ON THE FUEL TANK. FBC M | | | 1301.4 | | | | | | 7) PLEASE CONTACT DERM TO DETERMINE IF APPROVAL BY THEM | | | IS REQUIRED. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM. | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2021-07-30 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-07-30 |
Time |
13:01 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-07-30 |
Time |
13:01 |
Sent To |
|
|
| Notes |
| 2021-07-30 13:01:28 | 1ST REVIEW FBC-2020 MECHANICAL | | | PERMIT-21051502 | | | | | | CODES IN EFFECT: | | | | | | FBC B- FLORIDA BUILDING CODE | | | FBC M- FLORIDA MECHANICAL CODE | | | FBC EC- FLORIDA ENERGY CONSERVATION | | | FBC FG- FLORIDA FUEL GAS | | | FBC EX- FLORIDA EXISTING BUILDING CODE | | | FBC RES- FLORIDA RESIDENTIAL BUILDING CODE | | | FS- FLORIDA STATUTES | | | FAC- FLORIDA ADMINISTRATIVE CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) SHEET M1.01A: PLEASE SHOW THE FUEL PIPING ON THE | | | DRAWING. FBC M 1305 | | | | | | 2) VENT PIPING MUST MEET TERMINATION PROTECTION OF FBC | | | M 1305.7 | | | | | | 3) THE FUEL OIL SUPPLY LINE SHALL HAVE A BUILDING SHUT | | | OFF. FBC M 1307.1 | | | | | | 4) PLEASE PROVIDE INFORMATION ON THE EXHAUST SILENCER. | | | FBC 107.2.1 | | | | | | 5) PLEASE PROVIDE INSTALLATION INSTRUCTIONS FOR THE | | | VENTING OF THE FIRE PUMP. FBC 107.2.1 | | | | | | 6) PLEASE PROVIDE INFORMATION ON THE FUEL TANK. FBC M | | | 1301.4 | | | | | | 7) PLEASE CONTACT DERM TO DETERMINE IF APPROVAL BY THEM | | | IS REQUIRED. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM. | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
1 |
Status |
P |
Date |
2021-05-26 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-05-26 |
Time |
20:04 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-05-26 |
Time |
20:04 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
5 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2021-11-24 |
Time |
|
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2021-11-24 |
Time |
11:32 |
Sent To |
|
|
| Notes |
| 2021-11-24 11:32:30 | SHEETS M1-01A AND SHEET M1-02A PASSED DIGNATURE REVIEW | | | WITH DIGITAL SIGNATURE AND SEAL | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
F |
Date |
2021-11-22 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-11-22 |
Time |
12:57 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-11-22 |
Time |
12:57 |
Sent To |
|
|
| Notes |
| 2021-11-22 12:59:54 | SHEETS M1-01A AND SHEET M1-02A STILL NEED TO BEAR THE | | | DIGITAL SIGNATURE OF THE DESIGNER. | | | | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
F |
Date |
2021-10-28 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-10-28 |
Time |
12:33 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-10-28 |
Time |
12:33 |
Sent To |
|
|
| Notes |
| 2021-10-28 12:34:08 | PLEASE SEE THE FIRST 2 CYCLE SIGNATURE REVIEW COMMENTS | | | BELOW. | | | | | | PLEASE SEE 1ST REVIEW CYCLE COMMENTS BELOW: | | | | | | PLANS SUBMITTED DIGITALLY REQUIRE A DIGITAL SIGNATURE | | | FROM THE DESIGNER. | | | | | | PER THE WPB AMENDMENTS TO THE FBC, EACH SHEET OF PLAN | | | (INCLUDING THE SUPPORTING DOCUMENTS) IS REQUIRED TO BE | | | SIGNED AND SEALED BY THE PERSON RESPONSIBLE FOR THE | | | DESIGN. A DIGITAL PLAN REQUIRES A DIGITAL SIGNATURE | | | WITH THE PROPER THIRD PARTY VERIFICATION. PROVIDE | | | CORRECTION. ALTERNATIVELY, A SIGNED/SEALED PAPER SET | | | MAY BE SUPPLIED TO THE BUILDING DEPARTMENT WHEN ALL | | | TRADES ARE APPROVED. WPB FBC 107.1; FS 471/481 | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2021-10-19 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-10-19 |
Time |
09:56 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-10-19 |
Time |
09:56 |
Sent To |
|
|
| Notes |
| 2021-10-19 09:57:04 | PLEASE SEE 1ST REVIEW CYCLE COMMENTS BELOW: | | | | | | PLANS SUBMITTED DIGITALLY REQUIRE A DIGITAL SIGNATURE | | | FROM THE DESIGNER. | | | | | | PER THE WPB AMENDMENTS TO THE FBC, EACH SHEET OF PLAN | | | (INCLUDING THE SUPPORTING DOCUMENTS) IS REQUIRED TO BE | | | SIGNED AND SEALED BY THE PERSON RESPONSIBLE FOR THE | | | DESIGN. A DIGITAL PLAN REQUIRES A DIGITAL SIGNATURE | | | WITH THE PROPER THIRD PARTY VERIFICATION. PROVIDE | | | CORRECTION. ALTERNATIVELY, A SIGNED/SEALED PAPER SET | | | MAY BE SUPPLIED TO THE BUILDING DEPARTMENT WHEN ALL | | | TRADES ARE APPROVED. WPB FBC 107.1; FS 471/481 | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2021-07-30 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-07-30 |
Time |
13:05 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-07-30 |
Time |
13:05 |
Sent To |
|
|
| Notes |
| 2021-07-30 13:06:30 | PLANS SUBMITTED DIGITALLY REQUIRE A DIGITAL SIGNATURE | | | FROM THE DESIGNER. | | | | | | PER THE WPB AMENDMENTS TO THE FBC, EACH SHEET OF PLAN | | | (INCLUDING THE SUPPORTING DOCUMENTS) IS REQUIRED TO BE | | | SIGNED AND SEALED BY THE PERSON RESPONSIBLE FOR THE | | | DESIGN. A DIGITAL PLAN REQUIRES A DIGITAL SIGNATURE | | | WITH THE PROPER THIRD PARTY VERIFICATION. PROVIDE | | | CORRECTION. ALTERNATIVELY, A SIGNED/SEALED PAPER SET | | | MAY BE SUPPLIED TO THE BUILDING DEPARTMENT WHEN ALL | | | TRADES ARE APPROVED. WPB FBC 107.1; FS 471/481 | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | |
|
|