| Plan Review Stops For Permit 21051408 |
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
5 |
Status |
P |
Date |
2021-09-10 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2021-09-10 |
Time |
12:52 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2021-09-10 |
Time |
12:52 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
4 |
Status |
F |
Date |
2021-09-07 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2021-09-07 |
Time |
10:59 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2021-09-07 |
Time |
10:59 |
Sent To |
|
|
| Notes |
| 2021-09-07 10:59:50 | PROVIDE A SIGNED ACKNOWLEDGMENT FROM THE CONTRACTOR | | | STATING THAT THE INSTRUCTIONS ON THE WEBSITE OF THE | | | ASBESTOS PROGRAM COORDINATOR, FLORIDA DEPARTMENT OF | | | HEALTH PALM BEACH COUNTY WILL BE FOLLOWED, AND THAT | | | NOTIFICATION WILL BE GIVEN TIMELY. | | | | | | |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
3 |
Status |
F |
Date |
2021-08-23 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2021-08-23 |
Time |
16:27 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-08-23 16:27:34 | TO THE BUILDING CONTRACTOR: | | | PALM BEACH COUNTY HEALTH DEPARTMENT NEEDS VERIFICATION | | | THE CONTRACTORS ARE AWARE OF THIS FL. STATE STATUTE. | | | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | | COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE | | | GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS | | | REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE: | | | | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | | RENOVATION.HTML | | | | | | THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO | | | [email protected]. THE INFORMATION SHOULD BE IN | | | PDF FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE | | | INCLUDE THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT | | | LINE. | | | JAMES A. WITMER BN, PX, SFP, CBO | | | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER | | | CONSTRUCTION SERVICES DIVISION / DEVELOPMENT SERVICES | | | DEPARTMENT | | | 401 CLEMATIS ST. WEST PALM BEACH. FL 33402 | | | TEL: 561-805-6717 | | | FAX: 561-805-6676 | | | E-MAIL: [email protected] | | | |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
2 |
Status |
F |
Date |
2021-07-21 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2021-07-21 |
Time |
10:36 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-07-21 10:36:43 | TO THE BUILDING CONTRACTOR: | | | PALM BEACH COUNTY HEALTH DEPARTMENT NEEDS VERIFICATION | | | THE CONTRACTORS ARE AWARE OF THIS FL. STATE STATUTE. | | | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | | COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE | | | GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS | | | REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE: | | | | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | | RENOVATION.HTML | | | | | | THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO | | | [email protected]. THE INFORMATION SHOULD BE IN | | | PDF FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE | | | INCLUDE THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT | | | LINE. | | | | | | |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
1 |
Status |
F |
Date |
2021-06-29 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2021-06-29 |
Time |
11:04 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2021-06-29 |
Time |
10:15 |
Sent To |
|
|
| Notes |
| 2021-06-29 11:04:37 | TO THE BUILDING CONTRACTOR: | | | PALM BEACH COUNTY HEALTH DEPARTMENT NEEDS VERIFICATION | | | THE CONTRACTORS ARE AWARE OF THIS FL. STATE STATUTE. | | | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | | COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE | | | GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS | | | REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE: | | | | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | | RENOVATION.HTML | | | | | | THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO | | | [email protected]. THE INFORMATION SHOULD BE IN PDF | | | FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE INCLUDE | | | THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT LINE. | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2021-08-23 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2021-08-23 |
Time |
16:28 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2021-07-21 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2021-07-21 |
Time |
10:32 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2021-07-21 |
Time |
10:14 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2021-06-29 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2021-06-29 |
Time |
11:03 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2021-06-29 |
Time |
10:14 |
Sent To |
|
|
| Notes |
| 2021-06-29 11:03:27 | WEST PALM BEACH DEVELOPMENT SERVICES-CONSTRUCTION | | | SERVICES/ BUILDING DIVISION | | | 2020 FBC- BUILDING PLAN REVIEW | | | W. P. B. PERMIT: 21051408 | | | ADD: 1855 PALM BEACH LAKES BLVD. # B05 | | | CONT: TBD/ TO BE DETERMINED | | | TEL: ? | | | E-MAIL: [email protected] | | | | | | 2020 FLORIDA BUILDING CODE W 2020 WEST PALM BEACH | | | AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1, | | | ADMINISTRATION | | | | | | 2020 EXISTING BUILDING CODE. 801.3 COMPLIANCE. ALL NEW | | | CONSTRUCTION ELEMENTS, COMPONENTS, SYSTEMS, AND SPACES | | | SHALL COMPLY WITH THE REQUIREMENTS OF THE FLORIDA | | | BUILDING CODE, BUILDING. | | | | | | 1ST REVIEW | | | DATE: TUES. JUNE 29TH/ 2021 | | | ACTION: DENIED | | | 1) THE SHEET S110 THE STRUCTURAL ROOF SHEET SHOWS ALL | | | 10 ROOF TOP AIR HANDLERS AS EXISTING. THE MECHANICAL | | | ROOF PLAN M201 SHOWS SOME OF THE ROOF HANDLERS IN | | | DIFFERENT LOCATIONS AND ONLY 9. DISCREPANCY IN PLANS. | | | 107.2.1.2. ADDITIONAL INFORMATION IS REQUIRED. | | | | | | 2) SHEET S110 THE STRUCTURAL ROOF PLAN HAS A NOTE TO | | | PROVIDE PANEL POINT REINFORCING ON EXISTING BAR JOIST | | | WHERE RTU SUPPORT CURB FRAMING OVERLAPS. REFER TO | | | TYPICAL STEEL DETAILS. | | | BUILDING PROVISO: WELDED OR BOLTED CONNECTIONS. THIS | | | BUILDING CONTAINS EITHER BOLTED AND OR WELDED | | | CONNECTIONS. THE CONTRACTOR IS REQUIRED TO PROVIDE WELD | | | PROCEDURE SPECIFICATIONS & WELDER OPERATOR PERFORMANCE | | | QUALIFICATION RECORDS IN ACCORDANCE WITH THE REFERENCED | | | STANDARDS AT TIME OF INSPECTION FOR FIELD WIELDING, ON | | | THE JOB-SITE WIELDING. THIRD PARTY CERTIFICATION WILL | | | BE REQUIRED. | | | THE OWNER MAY JUST HIRE A 3RD PARTY ENGINEERING FIRM TO | | | COMPLETE AND APPROVE THE FORMER INSPECTIONS. REPORTS | | | SUBMITTED TO BUILDING INSPECTOR AT TIME OF FRAMING | | | INSPECTION. | | | 2020 FBC-B 2204.1 WELDING | | | 1. WELD PROCEDURES SPECIFICATIONS | | | 2. QUALIFICATIONS OF WELDING PERSONAL | | | 2017 FBC-B 2204.2 BOLTING. | | | IF FURTHER CLARIFICATION AND OR QUESTIONS IS REQUIRED, | | | PLEASE CONTACT THE CHIEF BUILDING INSPECTOR KEN CONRAD | | | AT 561-805-6666. | | | | | | 3) A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW | | | COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION | | | MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE | | | THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR | | | PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. | | | | | | PLEASE NOTE WITH THE LACK OF INFORMATION FOR THIS | | | REVIEW, SUBSEQUENT REMARKS MAYBE MADE IN THE NEXT | | | REVIEW CYCLE. | | | | | | PLEASE NOTE WE ARE WORKING FROM HOME BECAUSE OF COVID | | | 19 | | | IF YOU WOULD LIKE TO CONTACT ME, MY CELL NUMBER IS | | | 561-718-9724. | | | WORKING HOURS ARE MON.- WED. 8:00 AM- NOON. PART-TIME/ | | | RETIRED. | | | | | | JAMES A. WITMER BN, PX, SFP, CBO | | | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER | | | CONSTRUCTION SERVICES DIVISION / DEVELOPMENT SERVICES | | | DEPARTMENT | | | 401 CLEMATIS ST. WEST PALM BEACH. FL 33402 | | | TEL: 561-805-6717 | | | FAX: 561-805-6676 | | | E-MAIL: [email protected] | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2021-07-19 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2021-07-19 |
Time |
18:08 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2021-07-19 |
Time |
18:03 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2021-06-21 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2021-06-21 |
Time |
08:36 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2021-06-21 |
Time |
08:24 |
Sent To |
|
|
| Notes |
| 2021-06-21 08:36:31 | ELECTRICAL PLAN REVIEW NEEDS AN ELECTRICAL PERMIT | | | APPLICATION FOR APPROVAL. PLEASE EMAIL THE ELECTRICAL | | | PERMIT APPLICATION TO [email protected] AND CC | | | [email protected] SO I RECEIVE IT ALSO. WHEN THIS EMAIL | | | IS RECEIVED ONE OF THE REVIEWERS WILL APPROVE THE PLAN | | | REVIEW | | | | | | |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
3 |
Status |
P |
Date |
2021-08-30 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
2021-08-30 |
Time |
07:24 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
F |
Date |
2021-08-04 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2021-08-04 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
2021-08-04 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-08-04 08:18:14 | FORMAL ENGINEERING SUBMITTAL IS REQUIRED. SUBMIT TO | | | MANNY GONZALEZ, SR. PROJECT COORDINATOR AT CITY OF WPB | | | ENGINEERING SERVICES, [email protected]. | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES | | | DEPARTMENT (561) 494-1098 [email protected] | | | |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
F |
Date |
2021-06-23 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2021-06-23 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
2021-06-23 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-06-23 08:01:17 | FORMAL ENGINEERING SUBMITTAL IS REQUIRED. SUBMIT TO | | | MANNY GONZALEZ, SR. PROJECT COORDINATOR AT CITY OF WPB | | | ENGINEERING SERVICES, [email protected]. | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES | | | DEPARTMENT (561) 494-1098 [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2021-06-01 |
|
|
Cont ID |
|
| Sent By |
cwalker |
Date |
2021-06-01 |
Time |
|
Rev Time |
|
| Received By |
cwalker |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2021-09-08 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2021-09-08 |
Time |
08:54 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2021-09-01 |
Time |
09:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2021-08-31 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2021-08-31 |
Time |
10:25 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2021-08-18 |
Time |
07:17 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2021-08-04 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2021-08-04 |
Time |
14:42 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2021-07-16 |
Time |
12:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2021-06-29 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2021-06-29 |
Time |
11:05 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2021-05-27 |
Time |
12:25 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2021-07-22 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-07-22 |
Time |
06:24 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-07-22 |
Time |
06:24 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2021-06-21 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-06-21 |
Time |
07:44 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-06-21 |
Time |
07:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2021-06-22 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2021-06-22 |
Time |
06:34 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2021-06-21 |
Time |
11:30 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2021-08-23 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2021-08-23 |
Time |
16:28 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2021-07-22 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-07-22 |
Time |
06:24 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-07-22 |
Time |
06:24 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2021-06-21 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-06-21 |
Time |
07:49 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-06-21 |
Time |
07:44 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
P |
Date |
2021-09-03 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2021-09-03 |
Time |
14:12 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2021-09-03 |
Time |
13:23 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
F |
Date |
2021-08-20 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2021-08-20 |
Time |
13:41 |
Rev Time |
1.00 |
| Received By |
eschneid |
Date |
2021-08-19 |
Time |
17:11 |
Sent To |
|
|
| Notes |
| 2021-08-20 13:40:30 | FAILED | | | | | | 1) THE ISLAND THAT IS BEING PROPOSED FOR REMOVAL | | | CONTAINS A CRAPE MYRTLE TREE. PRIOR TO THE RELOCATION | | | OR REMOVAL OF THIS TREE, A TREE ALTERATION PERMIT MUST | | | BE SUBMITTED TO AND APPROVED BY THE PLANNING DIVISION. | | | ZONING WILL NOT APPROVE THIS PERMIT UNTIL THE TREE | | | ALTERATION PERMIT IS SUBMITTED. | | | | | | 2) THE MINOR PLANNED DEVELOPMENT AMENDMENT SUBMITTED | | | FOR THE WORK ON BUILDING BII INCLUDES A RELOCATED CRAPE | | | MYRTLE TREE FROM WHERE THE NEW DUMPSTER ENCLOSURE IS | | | PROPOSED. SHEET C100 SITE IMPROVEMENT PLAN SHOW A | | | PROPOSED CLEAN OUT WHERE THE TREE IS PROPOSED. THE | | | CLEAN OUT NEEDS TO BE MOVED TO THE SOUTH OR NORTH | | | SECTIONS OF THE LANDSCAPE ISLAND SO THAT THE TREE HAS | | | ADEQUATE ROOT GROWTH ROOM. | | | | | | 3) THE MINOR PLANNED DEVELOPMENT AMENDMENT SHOWS TWO | | | BICYCLE RACKS BEING RELOCATED, WHICH IS NOT SHOWN ON | | | SHEET C100. NOTE: THE RELOCATED BICYCLE RACKS WILL | | | REQUIRE A SEPARATE PERMIT WITH PLANS THAT INCLUDE THE | | | DIMENSIONS FROM THE RACKS TO ANY ADJACENT FEATURES TO | | | ENSURE THAT THERE IS PROPER CLEARANCE FOR THE BICYCLES | | | TO BE PARKED. | | | | | | 4) SEPARATE PERMITS REQUIRED FOR COMPACTOR ENCLOSURE. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2021-07-30 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2021-07-30 |
Time |
10:28 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2021-07-30 |
Time |
10:18 |
Sent To |
|
|
| Notes |
| 2021-07-30 10:28:52 | FAILED | | | | | | 1) THE CIVIL PLANS SHOW A RECONFIGURATION OF THE | | | SERVICE AREA BEHIND TENANT B05. THE RECONFIGURATION | | | INCLUDES THE REMOVAL OF TWO DUMPSTERS AND THE | | | INSTALLATION OF ONE REPLACEMENT DUMPSTER. THIS | | | RECONFIGURATION REQUIRES THE APPROVAL OF A MINOR | | | PLANNED DEVELOPMENT AMENDMENT PRIOR TO THE APPROVAL OF | | | THIS PERMIT BY ZONING. THE MINOR PD AMENDMENT SHALL | | | INCLUDE THE CHANGES THAT WERE DISCUSSED WITH PERMIT | | | 21040663 (AVALON SPACE) INCLUDING WHAT IS SHOWN ON | | | SHEET A100.1 OF THIS PERMIT SUBMITTAL. NOTE: THE | | | DUMPSTER RELOCATION REQUIRES THE SUBMITTAL AND APPROVAL | | | OF A SEPARATE DUMPSTER ENCLOSURE PERMIT TO THE BUILDING | | | DIVISION. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2021-06-16 |
|
|
Cont ID |
|
| Sent By |
eshneid |
Date |
2021-06-16 |
Time |
13:34 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2021-06-16 |
Time |
11:24 |
Sent To |
|
|
| Notes |
| 2021-06-16 13:33:56 | FAILED | | | | | | PROVIDE WRITTEN RESPONSE TO COMMENTS. | | | | | | 1) THE CIVIL PLANS SHOW A RECONFIGURATION OF THE | | | SERVICE AREA BEHIND TENANT B05. THE RECONFIGURATION | | | INCLUDES THE REMOVAL OF TWO DUMPSTERS AND THE | | | INSTALLATION OF ONE REPLACEMENT DUMPSTER. THIS | | | RECONFIGURATION REQUIRES THE APPROVAL OF A MINOR | | | PLANNED DEVELOPMENT AMENDMENT PRIOR TO THE APPROVAL OF | | | THIS PERMIT BY ZONING. THE MINOR PD AMENDMENT SHALL | | | INCLUDE THE CHANGES THAT WERE DISCUSSED WITH PERMIT | | | 21040663 (AVALON SPACE) INCLUDING WHAT IS SHOWN ON | | | SHEET A100.1 OF THIS PERMIT SUBMITTAL. NOTE: THE | | | DUMPSTER RELOCATION REQUIRES THE SUBMITTAL AND APPROVAL | | | OF A SEPARATE DUMPSTER ENCLOSURE PERMIT TO THE BUILDING | | | DIVISION. | | | | | | 2) THANK YOU FOR PROVIDING THE SITE LINE DRAWING FOR | | | THE NEW ROOFTOP EQUIPMENT. PLEASE ADD THE DIMENSIONS | | | FOR THE FULL HEIGHT, INCLUDING CURB, FOR THE NEW | | | ROOFTOP MECHANICAL EQUIPMENT AS WELL AS THE ROOF AND | | | PARAPET HEIGHTS TO THE DRAWINGS. | | | | | | 3) PLEASE EXPLAIN WHY THE ROOF PLAN (SHEET A210) AND | | | THE MECHANICAL ROOF PLAN (SHEET M201) SHOW DIFFERENT | | | LOCATIONS FOR THE ROOFTOP EQUIPMENT. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | | [email protected] | | | |
|
|