Plan Review Details - Permit 21050926
Plan Review Stops For Permit 21050926
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2021-06-16 Cont ID  
Sent By cthroop Date 2021-06-16 Time 08:06 Rev Time 0.00
Received By cthroop Date 2021-06-16 Time 08:02 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-05-27 Cont ID  
Sent By jleahy Date 2021-05-27 Time 15:45 Rev Time 0.00
Received By jleahy Date 2021-05-27 Time 15:10 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2021-07-16 Cont ID  
Sent By abelisle Date 2021-07-16 Time 10:21 Rev Time 0.00
Received By abelisle Date 2021-07-16 Time 09:58 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2021-06-09 Cont ID  
Sent By ccole Date 2021-06-09 Time 11:32 Rev Time 0.00
Received By ccole Date 2021-06-09 Time 07:23 Sent To  
Notes
2021-06-09 11:32:591ST REVIEW FBC-2020 RES.
 PERMIT- 21050926
 6/9/2021
  
 CODES IN EFFECT:
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE 7TH EDITION
 2020
 FBC P- FLORIDA PLUMBING CODE 7TH EDITION 2020
 FBC B- FLORIDA BUILDING CODE 7TH EDITION 2020
 FBC M- FLORIDA MECHANICAL CODE 7TH EDITION 2020
 FBC EC- FLORIDA ENERGY CONSERVATION CODE 7TH EDITION
 2020
 FBC FG- FLORIDA FUEL GAS CODE 7TH EDITION 2020
 FBC EX- FLORIDA EXISTING BUILDING CODE 7TH EDITION 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) BASED ON THE SIZING TABLE ON THE PLAN, TABLE-
 402.4.1 THE 1-INCH MAIN SUPPLY PIPE AT 11 IN. W.C. IS
 UNDERSIZED FOR THE INCREASED 821,000 BTU LOAD- SECTION
 G2413.1 FBC RES. IT APPEARS THAT THE PIPE WILL HAVE TO
 BE INCREASED IN SIZE, OR THE METER WILL HAVE TO BE
 UPGRADED.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date   Cont ID  
Sent By   Date 2021-07-16 Time   Rev Time 0.00
Received By aoliver Date 2021-07-08 Time 13:43 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-06-17 Cont ID  
Sent By medwards Date 2021-06-17 Time 09:37 Rev Time 0.00
Received By medwards Date 2021-05-20 Time 10:22 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status N Date 2021-07-16 Cont ID  
Sent By abelisle Date 2021-07-16 Time 10:23 Rev Time 0.00
Received By abelisle Date 2021-07-16 Time 10:23 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2021-06-09 Cont ID  
Sent By ccole Date 2021-06-09 Time 11:08 Rev Time 0.00
Received By ccole Date 2021-06-09 Time 07:23 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-07-16 Cont ID  
Sent By ccole Date 2021-07-16 Time 11:34 Rev Time 0.00
Received By ccole Date 2021-07-16 Time 11:34 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-06-16 Cont ID  
Sent By cthroop Date 2021-06-16 Time 08:06 Rev Time 0.00
Received By cthroop Date 2021-06-16 Time 08:02 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2021-06-16 Cont ID  
Sent By KALEXAND Date 2021-06-16 Time 13:59 Rev Time 0.00
Received By kalexand Date 2021-06-16 Time 13:59 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved