| Plan Review Stops For Permit 21050848 |
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
3 |
Status |
P |
Date |
2021-06-30 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-06-30 |
Time |
14:05 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-06-30 |
Time |
14:05 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
2 |
Status |
F |
Date |
2021-06-30 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-06-30 |
Time |
12:29 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-06-30 |
Time |
12:29 |
Sent To |
|
|
| Notes |
| 2021-06-30 12:30:11 | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | | COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE | | | GIVEN TIMELY. |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
1 |
Status |
F |
Date |
2021-06-16 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-06-16 |
Time |
15:49 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-06-16 |
Time |
15:49 |
Sent To |
|
|
| Notes |
| 2021-06-16 15:49:45 | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | | COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE | | | GIVEN TIMELY. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2021-06-30 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-06-30 |
Time |
12:30 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-06-30 |
Time |
12:30 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2021-06-16 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-06-16 |
Time |
15:49 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-06-16 |
Time |
15:49 |
Sent To |
|
|
| Notes |
| 2021-06-16 15:50:48 | CONDO REMODEL | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) THE FOLLOWING ACUSTICAL TEST REPORTS ARE REQUIRED: | | | | | | MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO | | | DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST | | | REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE | | | MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT) | | | | | | A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING | | | DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR | | | SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS | | | (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR | | | BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90. | | | THE TEST REPORT CANNOT INCLUDE A DROPPED GYPSUM | | | CEILING. PROVIDE A COPY OF THE TEST REPORT. | | | | | | B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN | | | DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC | | | OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN | | | IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN | | | 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH | | | ASTM E 492. THE TEST REPORT CANNOT INCLUDE A DROPPED | | | GYPSUM CEILING. PROVIDE A COPY OF THE TEST REPORT. | | | | | | C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE | | | BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL | | | INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID | | | DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED | | | TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE | | | 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84 | | | OR UL 723. (DO NOT NEED THIS REPORT IF THE PADDING IS | | | ATTACHED TO THE FLOORING) | | | | | | 2). PLEASE EMAIL ME THE PROPOSED TEST REPORTS TO VERIFY | | | BEFORE RESUBMITTING TO PROJECTDOX ( [email protected] | | | ) | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2021-05-27 |
|
|
Cont ID |
|
| Sent By |
equinone |
Date |
2021-05-27 |
Time |
15:49 |
Rev Time |
0.00 |
| Received By |
equinone |
Date |
2021-05-27 |
Time |
15:49 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2021-05-25 |
|
|
Cont ID |
|
| Sent By |
cwalker |
Date |
2021-05-25 |
Time |
|
Rev Time |
|
| Received By |
cwalker |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2021-06-30 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-06-30 |
Time |
12:31 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-06-22 |
Time |
13:06 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2021-06-16 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-06-16 |
Time |
15:51 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-05-19 |
Time |
13:26 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
N |
Date |
2021-06-02 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-06-02 |
Time |
09:40 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-06-02 |
Time |
09:40 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2021-06-03 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-06-03 |
Time |
12:03 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-06-03 |
Time |
11:59 |
Sent To |
|
|
| Notes |
| 2021-06-03 12:04:15 | 06/03/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING) | | | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | | PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES | | | FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, | | | STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT | | | THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK | | | OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | | AVOID VOIDING OF THE PERMIT. | | | | | | LUIS A. CRESPO | | | PLUMBING PLAN EXAMINER / INSPECTOR | | | EMAIL: [email protected] OFFICE: 561 805-6720 | | | |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
1 |
Status |
P |
Date |
2021-07-09 |
|
|
Cont ID |
|
| Sent By |
rgathrig |
Date |
2021-07-09 |
Time |
11:34 |
Rev Time |
0.00 |
| Received By |
rgathrig |
Date |
2021-07-09 |
Time |
11:33 |
Sent To |
|
|
| Notes |
| 2021-07-09 11:34:53 | PRIVATE PROVIDER INSPECTIONS ONLY | | | TEW & TAYLOR | | | | | | RICHARD GATHRIGHT | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
N |
Date |
2021-06-02 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-06-02 |
Time |
09:41 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-06-02 |
Time |
09:41 |
Sent To |
|
|
| Notes |
|
|