Plan Review Details - Permit 21050775
Plan Review Stops For Permit 21050775
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2021-05-24 Cont ID  
Sent By jwitmer Date 2021-05-24 Time 10:06 Rev Time 0.00
Received By jwitmer Date 2021-05-24 Time 09:28 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-05-24 Cont ID  
Sent By jleahy Date 2021-05-24 Time 12:13 Rev Time 0.00
Received By jleahy Date 2021-05-24 Time 12:13 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2021-05-24 Cont ID  
Sent By pleduc Date 2021-05-24 Time   Rev Time 0.00
Received By pleduc Date 2021-05-21 Time 13:45 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date   Cont ID  
Sent By   Date 2021-06-24 Time   Rev Time 0.00
Received By aoliver Date 2021-06-18 Time 09:57 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2021-05-26 Time   Rev Time 0.00
Received By lmarchan Date 2021-05-20 Time 11:31 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2021-06-21 Cont ID  
Sent By medwards Date 2021-06-21 Time 08:01 Rev Time 0.00
Received By medwards Date 2021-06-21 Time 08:01 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2021-05-25 Cont ID  
Sent By medwards Date 2021-05-25 Time 10:09 Rev Time 0.00
Received By medwards Date 2021-05-25 Time 10:09 Sent To  
Notes
2021-05-25 10:11:47IT APPEARS TO BE SEVERAL MECHANICAL DUCTS RUNNING
 THROUGH THE AREA THAT IS NOW A FIRE WALL. PLEASE
 PROVIDE A REVISED MECHANICAL DRAWING SHOWING HOW YOU
 WILL PROTECT THE WALL PENETRATIONS BY THESE MECHANICAL
 DUCTS. FBC M 607
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop P PLUMBING
Rev No 2 Status P Date 2021-06-24 Cont ID  
Sent By ccole Date 2021-06-24 Time 08:43 Rev Time 0.00
Received By ccole Date 2021-06-24 Time 08:00 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2021-05-26 Cont ID  
Sent By ccole Date 2021-05-26 Time 09:19 Rev Time 0.00
Received By ccole Date 2021-05-26 Time 07:10 Sent To  
Notes
2021-05-26 09:19:441ST REVIEW FBC-2020 PLUMBING
 PERMIT- 21050775
 5/26/2021
  
 CODES IN EFFECT:
 FBC P- FLORIDA PLUMBING CODE 7TH EDITION 2020
 FBC B- FLORIDA BUILDING CODE 7TH EDITION 2020
 FBC EX- FLORIDA EXISTING BUILDING CODE 7TH EDITION 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) SHEETS P2.2 & P6.2: PROVIDE EMERGENCY ROOF DRAIN
 LOCATIONS AND SIZING CALCULATIONS- SECTIONS 1108.1,
 1108.2, & 1108.3 FBC P.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-06-21 Cont ID  
Sent By medwards Date 2021-06-21 Time 08:01 Rev Time 0.00
Received By medwards Date 2021-06-21 Time 08:01 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-05-26 Cont ID  
Sent By ccole Date 2021-05-26 Time 09:30 Rev Time 0.00
Received By ccole Date 2021-05-26 Time 09:19 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved