Plan Review Details - Permit 21050746
Plan Review Stops For Permit 21050746
Review Stop G GAS REVIEW
Rev No 2 Status P Date 2021-06-24 Cont ID  
Sent By lcrespo Date 2021-06-24 Time 10:35 Rev Time 0.00
Received By lcrespo Date 2021-06-24 Time 10:35 Sent To  
Notes
2021-06-24 10:36:1206/24/20 REVIEWED FOR CODE COMPLIANCE (LP GAS)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2021-05-27 Cont ID  
Sent By lcrespo Date 2021-05-27 Time 16:29 Rev Time 0.00
Received By lcrespo Date 2021-05-27 Time 16:31 Sent To  
Notes
2021-05-27 16:30:3405/27/21 1ST GAS/LP/TANK REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 THERE IS NO SCOPE OF WORK, AND NOT CLEAR WHO IS GOING
 TO INSTALL THE APPLIANCES. PLEASE PROVIDE THE
 INFORMATION BELOW OR CLARIFY WHO WILL BE DOING THE
 WORK.
  
 1. GAS RISER DIAGRAM REQUIRED PER THE WPB AMENDMENTS TO
 THE FBC SEC. 107.3.5.3 (12) RESIDENTIAL GAS.
  
 2. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE
 LENGTH OF ALL CUT SECTIONS OF PIPE PER 2020 FBC RES.
 SECS. G2413.4.1, G2413.4.2.
  
 3. SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL
 PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE
 CORRUGATED STAINLESS-STEEL TUBING (IF APPLICABLE) FOR
 EACH PIPE SIZE PER THE WPB AMENDMENTS TO THE FBC
 SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 4. INDICATE THE SYSTEM'S DELIVERY PRESSURE (PSI) ON THE
 PLAN PER THE 2020 FBC FG SEC. 402.2 OR 2017 FBC RES.
 SEC. G2413.2.
  
 5. PLEASE PROVIDE THE TOTAL DISTANCE FROM THE POINT OF
 DELIVERY (GAS METER / MP REGULATOR / LP TANK) TO THE
 MOST REMOTE OUTLET OF THE SYSTEM PER THE 2020 FBC RES.
 SEC. G2413.4.1.
  
 6. PLEASE HAVE A SIGNATURE ON THE ISOMETRIC DRAWING OF
 THE PERSON DESIGNING THE SYSTEM, NOT IN ACCORDANCE WITH
 FLORIDA ADMINISTRATIVE CODE 61G15-23.001, FLORIDA
 STATUTE 471 PER THE WPB AMENDMENTS TO THE FBC SEC.
 107.1 GENERAL.
  
 7. PLEASE SHOW AND LABEL DRIP LEG ON EQUIPMENT
 INSTALLED, EXCEPT FOR RANGE PER THE 2020 FBC RES. SEC.
 G2419.2.
  
 8. ON HOUSE PLAN SHOWING THE LOCATION OF THE TANK-LESS
 WATER HEATER AND THE LOCATION AND DISTANCE OF ANY
 OPERABLE DOORS OR WINDOWS IN RELATION TO THE WATER
 HEATER. THE LOCATION OF THE WATER HEATER SHALL COMPLY
 WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS PER
 THE WPB AMENDMENTS TO THE FBC SEC. 107.2.1. INFORMATION
 ON CONSTRUCTION DOCUMENTS.
  
 9. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2020
 FBC RES. SEC. G2407.1 AND G2439.4 (CLOTHES DRYERS). IF
 LOUVER USED, PLEASE SHOW THE LOUVER(S) SIZE ON THE
 PLANS PER THE WPB AMENDMENTS TO THE FBC SEC. 107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 10. SUBMIT MANUFACTURER'S SPECIFICATION
 SHEETS/INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO
 VERIFY COMPLIANCE WITH 2020 FBC RES. SEC. G2408.1.
  
 11. GAS APPLIANCES SHALL BE LISTED AND LABELED. THE
 INSTALLATION MANUALS FOR ALL GAS APPLIANCES/EQUIPMENT
 SHALL BE ONSITE AT THE TIME OF INSPECTION PER THE FBC
 RES. SEC. G2413.2 AND G2404.3.
  
 12. PLEASE PROVIDE A HOUSE PLAN SHOWING THE LOCATION OF
 THE TANK-LESS WATER HEATER AND THE LOCATION AND
 DISTANCE OF ANY OPERABLE DOORS OR WINDOWS IN RELATION
 TO THE WATER HEATER. THE LOCATION OF THE WATER HEATER
 SHALL COMPLY WITH THE MANUFACTURER'S INSTALLATION
 INSTRUCTIONS PER THE WPB AMENDMENTS TO THE FBC SEC.
 107.2.1. INFORMATION ON CONSTRUCTION DOCUMENTS.
 13. PIPES OUTSIDE NEED TO BE INSULATED WITH A MINIMUM
 R-3 PER THE 2020 FBC SEC. RE 403.5.3.
  
 14. CLEARLY INDICATE ON THE PLAN IF THE LP TANK IS
 ABOVE GROUND OR BELOW GROUND, AND SHOW THE METHOD OF
 REQUIRED PROTECTION FOR THE LP TANK AND APPURTENANCES
 PER NFPA 58. FOR EXAMPLE, IF THE TANK IS BELOW GROUND,
 IT SHALL BE ANCHORED PER NFPA 58 SEC.3-2.2.7 (H). IF
 ABOVE GROUND, THE TANK SHALL BE SECURELY ANCHORED TO
 WITHSTAND 170 MPH ULT WIND LOAD PER THE WPB AMENDMENTS
 TO THE FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION
 DOCUMENTS.
  
 15. CLEARLY INDICATE ON THE TIE-DOWN SHEET IF THE LP
 TANK TIE-DOWN METHOD AND IF YOU ARE USING STRAPS OR
 CABLE, IF CABLE HOW IS IT PROTECTED FOR THE LP TANK AND
 APPURTENANCES PER NFPA 58 AND WPB AMENDMENTS TO THE FBC
 SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 16. PROVIDE THE SIZE OF THE HOLD-DOWN CABLES/STRAPS FOR
 THE TANK AND THE TYPE AND LENGTH OF GROUND ANCHORS TO
 BE INSTALLED TO PREVENT FLOTATION PER THE NFPA 58 SEC.
 6.6.1.6.
  
 17. SUBMIT DETAILS ON THE TYPE OF CATHODIC PROTECTION,
 SIZE (LBS.) & THE NUMBER OF MAGNESIUM BAG(S), SIZE &
 TYPE OF ANODE CABLE AMOUNT OF WATER TO ACTIVATE IT PER
 THE NFPA 58 SECS. 5.2.1.11, 6.6.6.1 (I).
  
 18. PLEASE PROVIDE THE DEPTH OF THE CONTAINER BELOW
 GRADE. COMPLY WITH THE NFPA 58 SEC. 6.6.6.1.
  
 19. PIPES NOT IN CONDITION SPACE NEED TO BE INSULATED
 WITH A MINIMUM R-3 PER THE 2020 FBC SEC. RE 403.5.3,
 PLEASE NOTE ON PLANS.
  
 20. IF THE TANK-LESS UNIT HAS CONDENSATE, IT WILL NEED
 TO BE 1' AWAY FROM THE STRUCTURE PER THE 2020 FBC SEC.
 R318.5, PLEASE NOTE ON PLANS.
  
 WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES.
 A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION,
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND, WILL HELP EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-07-08 Cont ID  
Sent By lmarchan Date 2021-07-08 Time 14:05 Rev Time 0.00
Received By lmarchan Date 2021-06-17 Time 09:16 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-06-10 Cont ID  
Sent By lcrespo Date 2021-06-10 Time 16:44 Rev Time 0.00
Received By lcrespo Date 2021-05-19 Time 12:52 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status N Date 2021-06-24 Cont ID  
Sent By lcrespo Date 2021-06-24 Time 10:36 Rev Time 0.00
Received By lcrespo Date 2021-06-24 Time 10:36 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2021-05-27 Cont ID  
Sent By lcrespo Date 2021-05-27 Time 16:29 Rev Time 0.00
Received By lcrespo Date 2021-05-27 Time 16:44 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2021-07-06 Cont ID  
Sent By rthermid Date 2021-07-06 Time   Rev Time 0.00
Received By rthermid Date 2021-07-06 Time   Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2021-06-09 Cont ID  
Sent By rthermid Date 2021-06-09 Time   Rev Time 0.00
Received By rthermid Date 2021-06-09 Time   Sent To I
Notes
2021-06-09 10:58:24ZONING PLAN REVIEW
 ________________________________________
  
 DATE OF REVIEW: 6/9/21
 ________________________________________
  
 REVIEW STATUS: FAILED
 ________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN
 REVIEW COMMENTS:
  
 1. ADDRESS THE GAS REVIEW COMMENTS
 2. PROVIDE ON THE SURVEY THE SETBACKS OF THE PROPOSED
 TANK TO ALL PROPERTY LINES.
 ________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 IF YOU SUBMITTED A PAPER APPLICATION, AND YOU WOULD
 LIKE TO RESUBMIT ELECTRONICALY, EMAIL
 [email protected] AND REQUEST TO HAVE YOUR
 PROJECT CONVERTED TO PROJECTDOX. YOU WILL RECEIVE LOGIN
 INFORMATION AND A LINK TO UPLOAD YOUR RESUBMITTAL.
 PLEASE BE SURE TO ?COMPLETE THE UPLOAD TASK? WHEN YOU
 ARE FINISHED UPLOADING.
  
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 RAFAELA THERMIDOR, ASSOCIATE PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 TTY: 800.955.8771
 E: [email protected]
 W: WPB.ORG
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved