| Plan Review Stops For Permit 21050649 |
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
3 |
Status |
P |
Date |
2021-07-02 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-07-02 |
Time |
10:24 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-07-02 |
Time |
10:24 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
2 |
Status |
F |
Date |
2021-06-23 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-06-23 |
Time |
10:46 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-06-23 |
Time |
10:46 |
Sent To |
|
|
| Notes |
| 2021-06-23 10:49:07 | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | | COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE | | | GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS | | | REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE: | | | | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | | RENOVATION.HTML | | | |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
1 |
Status |
F |
Date |
2021-06-09 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-06-09 |
Time |
15:18 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-06-09 |
Time |
15:18 |
Sent To |
|
|
| Notes |
| 2021-06-09 15:19:20 | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | | COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE | | | GIVEN TIMELY. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2021-07-08 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-07-08 |
Time |
10:42 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-07-08 |
Time |
10:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2021-07-02 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-07-02 |
Time |
10:23 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-07-02 |
Time |
10:22 |
Sent To |
|
|
| Notes |
| 2021-07-02 10:23:14 | CONDO REMODEL | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | NO CHANGES SINCE THE LAST REVIEW | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) FLAME SPREAD TEST REPORT PROVIDED IS FOR A TILE | | | FLOOR - NEED THE FLAME SPREAD TEST REPORT FOR A WOOD | | | FLOOR - THE FOLLOWING ACUSTICAL TEST REPORTS ARE | | | REQUIRED: | | | | | | MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO | | | DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST | | | REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE | | | MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT) | | | | | | C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE | | | BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL | | | INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID | | | DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED | | | TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE | | | 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84 | | | OR UL 723. (DO NOT NEED THIS REPORT IF THE PADDING IS | | | ATTACHED TO THE FLOORING) | | | | | | 2). PLEASE EMAIL ME THE PROPOSED TEST REPORTS TO VERIFY | | | BEFORE RESUBMITTING TO PROJECTDOX ( [email protected] | | | ) | | | 3) THE DRAWINGS SHOW THAT "SUPER SAM 125" IS TO BE USED | | | - THE DRAWINGS WILL NEED TO BE REVISED IF THE PRODUCT | | | IS CHANGED, | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2021-06-23 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-06-23 |
Time |
10:37 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-06-23 |
Time |
10:37 |
Sent To |
|
|
| Notes |
| 2021-06-23 10:42:42 | CONDO REMODEL | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) FLAME SPREAD TEST REPORT PROVIDED IS FOR A TILE | | | FLOOR - NEED THE FLAME SPREAD TEST REPORT FOR A WOOD | | | FLOOR - THE FOLLOWING ACUSTICAL TEST REPORTS ARE | | | REQUIRED: | | | | | | MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO | | | DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST | | | REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE | | | MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT) | | | | | | C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE | | | BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL | | | INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID | | | DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED | | | TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE | | | 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84 | | | OR UL 723. (DO NOT NEED THIS REPORT IF THE PADDING IS | | | ATTACHED TO THE FLOORING) | | | | | | 2). PLEASE EMAIL ME THE PROPOSED TEST REPORTS TO VERIFY | | | BEFORE RESUBMITTING TO PROJECTDOX ( [email protected] | | | ) | | | 3) THE DRAWINGS SHOW THAT "SUPER SAM 125" IS TO BE USED | | | - THE DRAWINGS WILL NEED TO BE REVISED IF THE PRODUCT | | | IS CHANGED, | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2021-06-09 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-06-09 |
Time |
15:19 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-06-09 |
Time |
15:10 |
Sent To |
|
|
| Notes |
| 2021-06-09 15:13:32 | CONDO REMODEL | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) FOR THE ADDED WOOD FLOORING - THE FOLLOWING | | | ACUSTICAL TEST REPORTS ARE REQUIRED: | | | | | | MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO | | | DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST | | | REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE | | | MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT) | | | | | | A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING | | | DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR | | | SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS | | | (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR | | | BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90. | | | THE TEST REPORT CANNOT INCLUDE A DROPPED GYPSUM | | | CEILING. PROVIDE A COPY OF THE TEST REPORT. | | | | | | B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN | | | DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC | | | OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN | | | IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN | | | 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH | | | ASTM E 492. THE TEST REPORT CANNOT INCLUDE A DROPPED | | | GYPSUM CEILING. PROVIDE A COPY OF THE TEST REPORT. | | | | | | C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE | | | BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL | | | INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID | | | DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED | | | TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE | | | 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84 | | | OR UL 723. (DO NOT NEED THIS REPORT IF THE PADDING IS | | | ATTACHED TO THE FLOORING) | | | | | | 2). PLEASE EMAIL ME THE PROPOSED TEST REPORTS TO VERIFY | | | BEFORE RESUBMITTING TO PROJECTDOX ( [email protected] | | | ) | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2021-07-13 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2021-07-13 |
Time |
12:09 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2021-07-13 |
Time |
12:09 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2021-06-21 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2021-06-21 |
Time |
10:33 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2021-06-21 |
Time |
10:29 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2021-05-26 |
|
|
Cont ID |
|
| Sent By |
equinone |
Date |
2021-05-26 |
Time |
15:37 |
Rev Time |
0.00 |
| Received By |
equinone |
Date |
2021-05-26 |
Time |
15:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2021-07-08 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2021-07-08 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2021-07-08 |
Time |
14:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2021-06-14 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2021-06-14 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2021-06-14 |
Time |
10:12 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2021-05-19 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2021-05-19 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2021-05-19 |
Time |
13:03 |
Sent To |
|
|
| Notes |
| 2021-05-19 13:10:26 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | 1) THERE ARE INDICATIONS OF FLOOR UNDERLAYMENT BUT NO | | | SPECIFICATIONS SHEETS THAT INDICATE MEETING THE | | | REQUIREMENTS PER NFPA' | | | | | | PER NFPA 101, CH 30 | | | | | | 30.3.3.3 INTERIOR FLOOR FINISH. | | | 30.3.3.3.1 INTERIOR FLOOR FINISH SHALL COMPLY WITH | | | SECTION 10.2. | | | | | | 30.3.3.3.3 INTERIOR FLOOR FINISH SHALL COMPLY WITH | | | 10.2.7.1 OR | | | 10.2.7.2, AS APPLICABLE | | | | | | 10.2.1.1 CLASSIFICATION OF INTERIOR FINISH MATERIALS | | | SHALL BE IN | | | ACCORDANCE WITH TESTS MADE UNDER CONDITIONS SIMULATING | | | ACTUAL | | | INSTALLATIONS, PROVIDED THAT THE AUTHORITY HAVING | | | JURISDICTION IS | | | PERMITTED TO ESTABLISH THE CLASSIFICATION OF ANY | | | MATERIAL FOR WHICH | | | CLASSIFICATION BY A STANDARD TEST IS NOT AVAILABLE, | | | UNLESS OTHERWISE | | | PROVIDED IN 10.2.1.2 OR 10.2.1.4. | | | 10.2.1.2 THE PROVISIONS OF 10.2.1.1 SHALL NOT APPLY TO | | | MATERIALS HAVING | | | A TOTAL THICKNESS OF LESS THAN 1?28 IN. (0.9 MM) THAT | | | ARE APPLIED DIRECTLY | | | TO THE SURFACE OF WALLS AND CEILINGS WHERE BOTH OF THE | | | FOLLOWING | | | CONDITIONS ARE MET: | | | (1) THE WALL OR CEILING SURFACE IS A NONCOMBUSTIBLE OR | | | LIMITED COMBUSTIBLE | | | MATERIAL. | | | (2) THE MATERIALS APPLIED MEET THE REQUIREMENTS OF | | | CLASS A INTERIOR | | | WALL OR CEILING FINISH WHEN TESTED IN ACCORDANCE WITH | | | 10.2.3, | | | USING FIBER CEMENT BOARD AS THE SUBSTRATE MATERIAL. | | | | | | 10.2.7* INTERIOR FLOOR FINISH TESTING AND | | | CLASSIFICATION. | | | 10.2.7.1* CARPET AND CARPET LIKE INTERIOR FLOOR | | | FINISHES SHALL | | | COMPLY WITH ASTM D 2859, STANDARD TEST METHOD FOR | | | IGNITION | | | CHARACTERISTICS OF FINISHED TEXTILE FLOOR COVERING | | | MATERIALS. | | | 10.2.7.2* FLOOR COVERINGS, OTHER THAN CARPET FOR WHICH | | | 10.2.2.2 | | | ESTABLISHES REQUIREMENTS FOR FIRE PERFORMANCE, SHALL | | | HAVE A | | | MINIMUM CRITICAL RADIANT FLUX OF 0.1 W/CM2. | | | | | | 10.2.7.4 INTERIOR FLOOR FINISHES SHALL BE GROUPED IN | | | THE CLASSES SPECIFIED | | | IN 10.2.7.4.1 AND 10.2.7.4.2 IN ACCORDANCE WITH THE | | | CRITICAL RADIANT FLUX | | | REQUIREMENTS. | | | 10.2.7.4.1 CLASS I INTERIOR FLOOR FINISH. CLASS I | | | INTERIOR FLOOR FINISH | | | SHALL HAVE A CRITICAL RADIANT FLUX OF NOT LESS THAN | | | 0.45 W/CM2, AS DETERMINED | | | BY THE TEST DESCRIBED IN 10.2.7.3. | | | 10.2.7.4.2 CLASS II INTERIOR FLOOR FINISH. CLASS II | | | INTERIOR FLOOR FINISH | | | SHALL HAVE A CRITICAL RADIANT FLUX OF NOT LESS THAN | | | 0.22 W/CM2, BUT LESS | | | THAN 0.45 W/CM2, AS DETERMINED BY THE TEST DESCRIBED IN | | | 10.2.7.3. | | | | | | PLEASE REVIEW AND PROVIDE SPEC SHEETS. | | | | | | | | | 2) THERE ARE INDICATIONS OF WALL WORK, CABINET REMOVAL | | | AND PAINTING. | | | | | | ANY WORK INVOLVING FIRE SPRINKLERS/FIRE ALARM SYSTEMS | | | OR EQUIPMENT SHALL BE DONE UNDER SEPARATE PERMITS AND | | | SHOP DRAWINGS. | | | | | | FIRE SPRINKLERS AND FIRE ALARM EQUIPMENT SHALL BE | | | PROTECTED FROM PAINTING OR DAMAGE. | | | | | | THE FIRE SPRINKLER/FIRE ALARM SYSTEMS SHALL BE | | | MAINTAINED THROUGHOUT DEMO AND RECONSTRUCTION. | | | | | | PLEASE PROVIDE A NOTE OF ACKNOWLEDGEMENT AND ENSURE | | | COMPLIANCE. | | | | | | | | | 3) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET | | | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE | | | ABOVE. | | | | | | 4) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | | RE-SUBMITTAL OF THE ABOVE. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2021-07-13 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2021-07-13 |
Time |
12:10 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2021-07-13 |
Time |
12:09 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2021-07-02 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-07-02 |
Time |
10:24 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-06-24 |
Time |
08:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2021-06-23 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-06-23 |
Time |
10:49 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-06-11 |
Time |
12:07 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2021-06-09 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-06-09 |
Time |
15:19 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-05-14 |
Time |
11:45 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
N |
Date |
2021-05-28 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-05-28 |
Time |
08:29 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-05-28 |
Time |
08:23 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2021-07-13 |
|
|
Cont ID |
|
| Sent By |
jesmith |
Date |
2021-07-13 |
Time |
12:08 |
Rev Time |
0.00 |
| Received By |
jesmith |
Date |
2021-07-13 |
Time |
11:44 |
Sent To |
|
|
| Notes |
| 2021-07-13 12:08:07 | 21050649 525 S FLAGLER DR # 16B | | | | | | PLEASE NOTE THAT WHEN SCANNED DRAWINGS ARE SUBMITTED, A | | | PAPER PLAN WITH WET SIGNATURE/SEAL SHALL BE PROVIDED TO | | | THE BUILDING DEPARTMENT FOR HARD RECORD FILE PRIOR TO | | | ISSUANCE OF A PERMIT. | | | | | | PLUMBING COMMENTS: APPROVED | | | | | | PER WPB FBC 104.1, A PLUMBING SUB-PERMIT APPLICATION | | | SHALL BE SUBMITTED FOR THIS PROJECT BY A LICENSED | | | PLUMBING CONTRACTOR. | | | | | | PLUMBING CONSISTS OF REMOVING ONE (1) SINK, EXPOSED | | | PLUMBING PIPING AND CAPPING OF THE SAME. REFER TO | | | 001-D1 DEMOLITION PLAN DATED 5/10/2021. | | | | | | ALL WORK PER STATE AND CITY CODES SUBJECT TO FIELD | | | INSPECTOR'S APPROVAL | | | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | | PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM | | | THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND | | | NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF | | | PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY | | | ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | | AVOID VOIDING OF THE PERMIT. | | | | | | 21050649 525 S FLAGLER DR # 16B | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2021-06-15 |
|
|
Cont ID |
|
| Sent By |
jesmith |
Date |
2021-06-15 |
Time |
15:18 |
Rev Time |
0.00 |
| Received By |
jesmith |
Date |
2021-06-15 |
Time |
15:01 |
Sent To |
|
|
| Notes |
| 2021-06-15 15:18:37 | 21050649 525 S FLAGLER DR # 16B | | | | | | PLEASE NOTE THAT WHEN SCANNED DRAWINGS ARE SUBMITTED, A | | | PAPER PLAN WITH WET SIGNATURE/SEAL SHALL BE PROVIDED TO | | | THE BUILDING DEPARTMENT FOR HARD RECORD FILE PRIOR TO | | | ISSUANCE OF A PERMIT. | | | | | | PLUMBING COMMENTS: APPROVED | | | | | | PER WPB FBC 104.1, A PLUMBING SUB-PERMIT APPLICATION | | | SHALL BE SUBMITTED FOR THIS PROJECT BY A LICENSED | | | PLUMBING CONTRACTOR. | | | | | | PLUMBING CONSISTS OF REMOVING ONE (1) SINK, EXPOSED | | | PLUMBING PIPING AND CAPPING OF THE SAME. | | | | | | ALL WORK PER STATE AND CITY CODES SUBJECT TO FIELD | | | INSPECTOR'S APPROVAL | | | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | | PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM | | | THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND | | | NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF | | | PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY | | | ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | | AVOID VOIDING OF THE PERMIT. | | | | | | 21050649 525 S FLAGLER DR # 16B | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2021-06-01 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-06-01 |
Time |
16:48 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-06-01 |
Time |
16:48 |
Sent To |
|
|
| Notes |
| 2021-06-01 16:49:21 | 06/01/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING) | | | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | | PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES | | | FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, | | | STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT | | | THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK | | | OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | | AVOID VOIDING OF THE PERMIT. | | | | | | LUIS A. CRESPO | | | PLUMBING PLAN EXAMINER / INSPECTOR | | | EMAIL: [email protected] OFFICE: 561 805-6720 | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2021-07-08 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-07-08 |
Time |
10:43 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-07-08 |
Time |
10:43 |
Sent To |
|
|
| Notes |
| 2021-07-13 12:11:00 | PLEASE NOTE THAT WHEN SCANNED DRAWINGS ARE SUBMITTED, A | | | PAPER PLAN WITH WET SIGNATURE/SEAL SHALL BE PROVIDED TO | | | THE BUILDING DEPARTMENT FOR HARD RECORD FILE PRIOR TO | | | ISSUANCE OF A PERMIT. | | | | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2021-06-23 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-06-23 |
Time |
10:43 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-06-23 |
Time |
10:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2021-05-14 |
|
|
Cont ID |
|
| Sent By |
equinone |
Date |
2021-05-14 |
Time |
13:22 |
Rev Time |
0.00 |
| Received By |
equinone |
Date |
2021-05-14 |
Time |
13:22 |
Sent To |
|
|
| Notes |
| 2021-05-14 13:23:02 | PAPER DRAWINGS WITH ORIGINAL SEAL AND SIGNATURES | | | SUBMITTED. ROUTED TO STORAGE. EQ |
|
|