Plan Review Details - Permit 21050649
Plan Review Stops For Permit 21050649
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 3 Status P Date 2021-07-02 Cont ID  
Sent By rmcphers Date 2021-07-02 Time 10:24 Rev Time 0.00
Received By rmcphers Date 2021-07-02 Time 10:24 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status F Date 2021-06-23 Cont ID  
Sent By rmcphers Date 2021-06-23 Time 10:46 Rev Time 0.00
Received By rmcphers Date 2021-06-23 Time 10:46 Sent To  
Notes
2021-06-23 10:49:07PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2021-06-09 Cont ID  
Sent By rmcphers Date 2021-06-09 Time 15:18 Rev Time 0.00
Received By rmcphers Date 2021-06-09 Time 15:18 Sent To  
Notes
2021-06-09 15:19:20PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY.

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2021-07-08 Cont ID  
Sent By rmcphers Date 2021-07-08 Time 10:42 Rev Time 0.00
Received By rmcphers Date 2021-07-08 Time 10:42 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2021-07-02 Cont ID  
Sent By rmcphers Date 2021-07-02 Time 10:23 Rev Time 0.00
Received By rmcphers Date 2021-07-02 Time 10:22 Sent To  
Notes
2021-07-02 10:23:14CONDO REMODEL
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 NO CHANGES SINCE THE LAST REVIEW
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) FLAME SPREAD TEST REPORT PROVIDED IS FOR A TILE
 FLOOR - NEED THE FLAME SPREAD TEST REPORT FOR A WOOD
 FLOOR - THE FOLLOWING ACUSTICAL TEST REPORTS ARE
 REQUIRED:
  
 MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO
 DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST
 REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE
 MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT)
  
 C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE
 BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE
 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84
 OR UL 723. (DO NOT NEED THIS REPORT IF THE PADDING IS
 ATTACHED TO THE FLOORING)
  
 2). PLEASE EMAIL ME THE PROPOSED TEST REPORTS TO VERIFY
 BEFORE RESUBMITTING TO PROJECTDOX ( [email protected]
 )
 3) THE DRAWINGS SHOW THAT "SUPER SAM 125" IS TO BE USED
 - THE DRAWINGS WILL NEED TO BE REVISED IF THE PRODUCT
 IS CHANGED,
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2021-06-23 Cont ID  
Sent By rmcphers Date 2021-06-23 Time 10:37 Rev Time 0.00
Received By rmcphers Date 2021-06-23 Time 10:37 Sent To  
Notes
2021-06-23 10:42:42CONDO REMODEL
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) FLAME SPREAD TEST REPORT PROVIDED IS FOR A TILE
 FLOOR - NEED THE FLAME SPREAD TEST REPORT FOR A WOOD
 FLOOR - THE FOLLOWING ACUSTICAL TEST REPORTS ARE
 REQUIRED:
  
 MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO
 DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST
 REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE
 MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT)
  
 C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE
 BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE
 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84
 OR UL 723. (DO NOT NEED THIS REPORT IF THE PADDING IS
 ATTACHED TO THE FLOORING)
  
 2). PLEASE EMAIL ME THE PROPOSED TEST REPORTS TO VERIFY
 BEFORE RESUBMITTING TO PROJECTDOX ( [email protected]
 )
 3) THE DRAWINGS SHOW THAT "SUPER SAM 125" IS TO BE USED
 - THE DRAWINGS WILL NEED TO BE REVISED IF THE PRODUCT
 IS CHANGED,
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-06-09 Cont ID  
Sent By rmcphers Date 2021-06-09 Time 15:19 Rev Time 0.00
Received By rmcphers Date 2021-06-09 Time 15:10 Sent To  
Notes
2021-06-09 15:13:32CONDO REMODEL
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) FOR THE ADDED WOOD FLOORING - THE FOLLOWING
 ACUSTICAL TEST REPORTS ARE REQUIRED:
  
 MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO
 DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST
 REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE
 MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT)
  
 A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING
 DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR
 SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS
 (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR
 BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90.
 THE TEST REPORT CANNOT INCLUDE A DROPPED GYPSUM
 CEILING. PROVIDE A COPY OF THE TEST REPORT.
  
 B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN
 DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC
 OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN
 IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN
 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH
 ASTM E 492. THE TEST REPORT CANNOT INCLUDE A DROPPED
 GYPSUM CEILING. PROVIDE A COPY OF THE TEST REPORT.
  
 C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE
 BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE
 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84
 OR UL 723. (DO NOT NEED THIS REPORT IF THE PADDING IS
 ATTACHED TO THE FLOORING)
  
 2). PLEASE EMAIL ME THE PROPOSED TEST REPORTS TO VERIFY
 BEFORE RESUBMITTING TO PROJECTDOX ( [email protected]
 )
  

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2021-07-13 Cont ID  
Sent By jleahy Date 2021-07-13 Time 12:09 Rev Time 0.00
Received By jleahy Date 2021-07-13 Time 12:09 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2021-06-21 Cont ID  
Sent By jleahy Date 2021-06-21 Time 10:33 Rev Time 0.00
Received By jleahy Date 2021-06-21 Time 10:29 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-05-26 Cont ID  
Sent By equinone Date 2021-05-26 Time 15:37 Rev Time 0.00
Received By equinone Date 2021-05-26 Time 15:37 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2021-07-08 Cont ID  
Sent By pleduc Date 2021-07-08 Time   Rev Time 0.00
Received By pleduc Date 2021-07-08 Time 14:53 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2021-06-14 Cont ID  
Sent By pleduc Date 2021-06-14 Time   Rev Time 0.00
Received By pleduc Date 2021-06-14 Time 10:12 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2021-05-19 Cont ID  
Sent By pleduc Date 2021-05-19 Time   Rev Time 0.00
Received By pleduc Date 2021-05-19 Time 13:03 Sent To  
Notes
2021-05-19 13:10:26THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 1) THERE ARE INDICATIONS OF FLOOR UNDERLAYMENT BUT NO
 SPECIFICATIONS SHEETS THAT INDICATE MEETING THE
 REQUIREMENTS PER NFPA'
  
 PER NFPA 101, CH 30
  
 30.3.3.3 INTERIOR FLOOR FINISH.
 30.3.3.3.1 INTERIOR FLOOR FINISH SHALL COMPLY WITH
 SECTION 10.2.
  
 30.3.3.3.3 INTERIOR FLOOR FINISH SHALL COMPLY WITH
 10.2.7.1 OR
 10.2.7.2, AS APPLICABLE
  
 10.2.1.1 CLASSIFICATION OF INTERIOR FINISH MATERIALS
 SHALL BE IN
 ACCORDANCE WITH TESTS MADE UNDER CONDITIONS SIMULATING
 ACTUAL
 INSTALLATIONS, PROVIDED THAT THE AUTHORITY HAVING
 JURISDICTION IS
 PERMITTED TO ESTABLISH THE CLASSIFICATION OF ANY
 MATERIAL FOR WHICH
 CLASSIFICATION BY A STANDARD TEST IS NOT AVAILABLE,
 UNLESS OTHERWISE
 PROVIDED IN 10.2.1.2 OR 10.2.1.4.
 10.2.1.2 THE PROVISIONS OF 10.2.1.1 SHALL NOT APPLY TO
 MATERIALS HAVING
 A TOTAL THICKNESS OF LESS THAN 1?28 IN. (0.9 MM) THAT
 ARE APPLIED DIRECTLY
 TO THE SURFACE OF WALLS AND CEILINGS WHERE BOTH OF THE
 FOLLOWING
 CONDITIONS ARE MET:
 (1) THE WALL OR CEILING SURFACE IS A NONCOMBUSTIBLE OR
 LIMITED COMBUSTIBLE
 MATERIAL.
 (2) THE MATERIALS APPLIED MEET THE REQUIREMENTS OF
 CLASS A INTERIOR
 WALL OR CEILING FINISH WHEN TESTED IN ACCORDANCE WITH
 10.2.3,
 USING FIBER CEMENT BOARD AS THE SUBSTRATE MATERIAL.
  
 10.2.7* INTERIOR FLOOR FINISH TESTING AND
 CLASSIFICATION.
 10.2.7.1* CARPET AND CARPET LIKE INTERIOR FLOOR
 FINISHES SHALL
 COMPLY WITH ASTM D 2859, STANDARD TEST METHOD FOR
 IGNITION
 CHARACTERISTICS OF FINISHED TEXTILE FLOOR COVERING
 MATERIALS.
 10.2.7.2* FLOOR COVERINGS, OTHER THAN CARPET FOR WHICH
 10.2.2.2
 ESTABLISHES REQUIREMENTS FOR FIRE PERFORMANCE, SHALL
 HAVE A
 MINIMUM CRITICAL RADIANT FLUX OF 0.1 W/CM2.
  
 10.2.7.4 INTERIOR FLOOR FINISHES SHALL BE GROUPED IN
 THE CLASSES SPECIFIED
 IN 10.2.7.4.1 AND 10.2.7.4.2 IN ACCORDANCE WITH THE
 CRITICAL RADIANT FLUX
 REQUIREMENTS.
 10.2.7.4.1 CLASS I INTERIOR FLOOR FINISH. CLASS I
 INTERIOR FLOOR FINISH
 SHALL HAVE A CRITICAL RADIANT FLUX OF NOT LESS THAN
 0.45 W/CM2, AS DETERMINED
 BY THE TEST DESCRIBED IN 10.2.7.3.
 10.2.7.4.2 CLASS II INTERIOR FLOOR FINISH. CLASS II
 INTERIOR FLOOR FINISH
 SHALL HAVE A CRITICAL RADIANT FLUX OF NOT LESS THAN
 0.22 W/CM2, BUT LESS
 THAN 0.45 W/CM2, AS DETERMINED BY THE TEST DESCRIBED IN
 10.2.7.3.
  
 PLEASE REVIEW AND PROVIDE SPEC SHEETS.
  
  
 2) THERE ARE INDICATIONS OF WALL WORK, CABINET REMOVAL
 AND PAINTING.
  
 ANY WORK INVOLVING FIRE SPRINKLERS/FIRE ALARM SYSTEMS
 OR EQUIPMENT SHALL BE DONE UNDER SEPARATE PERMITS AND
 SHOP DRAWINGS.
  
 FIRE SPRINKLERS AND FIRE ALARM EQUIPMENT SHALL BE
 PROTECTED FROM PAINTING OR DAMAGE.
  
 THE FIRE SPRINKLER/FIRE ALARM SYSTEMS SHALL BE
 MAINTAINED THROUGHOUT DEMO AND RECONSTRUCTION.
  
 PLEASE PROVIDE A NOTE OF ACKNOWLEDGEMENT AND ENSURE
 COMPLIANCE.
  
  
 3) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
 4) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2021-07-13 Cont ID  
Sent By jleahy Date 2021-07-13 Time 12:10 Rev Time 0.00
Received By jleahy Date 2021-07-13 Time 12:09 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2021-07-02 Cont ID  
Sent By rmcphers Date 2021-07-02 Time 10:24 Rev Time 0.00
Received By rmcphers Date 2021-06-24 Time 08:37 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-06-23 Cont ID  
Sent By rmcphers Date 2021-06-23 Time 10:49 Rev Time 0.00
Received By rmcphers Date 2021-06-11 Time 12:07 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-06-09 Cont ID  
Sent By rmcphers Date 2021-06-09 Time 15:19 Rev Time 0.00
Received By rmcphers Date 2021-05-14 Time 11:45 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2021-05-28 Cont ID  
Sent By medwards Date 2021-05-28 Time 08:29 Rev Time 0.00
Received By medwards Date 2021-05-28 Time 08:23 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status P Date 2021-07-13 Cont ID  
Sent By jesmith Date 2021-07-13 Time 12:08 Rev Time 0.00
Received By jesmith Date 2021-07-13 Time 11:44 Sent To  
Notes
2021-07-13 12:08:0721050649 525 S FLAGLER DR # 16B
  
 PLEASE NOTE THAT WHEN SCANNED DRAWINGS ARE SUBMITTED, A
 PAPER PLAN WITH WET SIGNATURE/SEAL SHALL BE PROVIDED TO
 THE BUILDING DEPARTMENT FOR HARD RECORD FILE PRIOR TO
 ISSUANCE OF A PERMIT.
  
 PLUMBING COMMENTS: APPROVED
  
 PER WPB FBC 104.1, A PLUMBING SUB-PERMIT APPLICATION
 SHALL BE SUBMITTED FOR THIS PROJECT BY A LICENSED
 PLUMBING CONTRACTOR.
  
 PLUMBING CONSISTS OF REMOVING ONE (1) SINK, EXPOSED
 PLUMBING PIPING AND CAPPING OF THE SAME. REFER TO
 001-D1 DEMOLITION PLAN DATED 5/10/2021.
  
 ALL WORK PER STATE AND CITY CODES SUBJECT TO FIELD
 INSPECTOR'S APPROVAL
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 21050649 525 S FLAGLER DR # 16B
  

Review Stop P PLUMBING
Rev No 2 Status P Date 2021-06-15 Cont ID  
Sent By jesmith Date 2021-06-15 Time 15:18 Rev Time 0.00
Received By jesmith Date 2021-06-15 Time 15:01 Sent To  
Notes
2021-06-15 15:18:3721050649 525 S FLAGLER DR # 16B
  
 PLEASE NOTE THAT WHEN SCANNED DRAWINGS ARE SUBMITTED, A
 PAPER PLAN WITH WET SIGNATURE/SEAL SHALL BE PROVIDED TO
 THE BUILDING DEPARTMENT FOR HARD RECORD FILE PRIOR TO
 ISSUANCE OF A PERMIT.
  
 PLUMBING COMMENTS: APPROVED
  
 PER WPB FBC 104.1, A PLUMBING SUB-PERMIT APPLICATION
 SHALL BE SUBMITTED FOR THIS PROJECT BY A LICENSED
 PLUMBING CONTRACTOR.
  
 PLUMBING CONSISTS OF REMOVING ONE (1) SINK, EXPOSED
 PLUMBING PIPING AND CAPPING OF THE SAME.
  
 ALL WORK PER STATE AND CITY CODES SUBJECT TO FIELD
 INSPECTOR'S APPROVAL
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 21050649 525 S FLAGLER DR # 16B
  

Review Stop P PLUMBING
Rev No 1 Status P Date 2021-06-01 Cont ID  
Sent By lcrespo Date 2021-06-01 Time 16:48 Rev Time 0.00
Received By lcrespo Date 2021-06-01 Time 16:48 Sent To  
Notes
2021-06-01 16:49:2106/01/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2021-07-08 Cont ID  
Sent By rmcphers Date 2021-07-08 Time 10:43 Rev Time 0.00
Received By rmcphers Date 2021-07-08 Time 10:43 Sent To  
Notes
2021-07-13 12:11:00PLEASE NOTE THAT WHEN SCANNED DRAWINGS ARE SUBMITTED, A
 PAPER PLAN WITH WET SIGNATURE/SEAL SHALL BE PROVIDED TO
 THE BUILDING DEPARTMENT FOR HARD RECORD FILE PRIOR TO
 ISSUANCE OF A PERMIT.
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-06-23 Cont ID  
Sent By rmcphers Date 2021-06-23 Time 10:43 Rev Time 0.00
Received By rmcphers Date 2021-06-23 Time 10:43 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-05-14 Cont ID  
Sent By equinone Date 2021-05-14 Time 13:22 Rev Time 0.00
Received By equinone Date 2021-05-14 Time 13:22 Sent To  
Notes
2021-05-14 13:23:02PAPER DRAWINGS WITH ORIGINAL SEAL AND SIGNATURES
 SUBMITTED. ROUTED TO STORAGE. EQ