| Plan Review Stops For Permit 21050467 |
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
2 |
Status |
P |
Date |
2021-05-19 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2021-05-19 |
Time |
14:07 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2021-05-19 |
Time |
14:07 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
1 |
Status |
F |
Date |
2021-05-13 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2021-05-13 |
Time |
13:43 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2021-05-13 |
Time |
06:45 |
Sent To |
|
|
| Notes |
| 2021-05-13 13:48:29 | ASBESTOS REQUIREMENTS: | | | | | | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | | COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE | | | GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS | | | REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE: | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | | RENOVATION.HTML | | | | | | THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO | | | [email protected]. THE INFORMATION SHOULD BE IN PDF | | | FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE INCLUDE | | | THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT LINE. | | | | | | NOTE: IF A CONTRACTOR IS DEMOLISHING THE STRUCTURE THE | | | ASBESTOS ACKNOWLEDGEMENT LETTER IS REQUIRED. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2021-05-21 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2021-05-21 |
Time |
16:23 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2021-05-21 |
Time |
16:23 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2021-05-19 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2021-05-19 |
Time |
14:11 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2021-05-19 |
Time |
14:08 |
Sent To |
|
|
| Notes |
| 2021-05-19 14:11:26 | ****CORRECTIONS**** | | | | | | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | | | | BUILDING REVIEW DENIED: | | | | | | #3) WPB RELEASE & WATER DOWN METHOD (FAILED) | | | IT APPEARS THAT USING THE EXISTING BACKFLOW PREVENTER | | | IS DESIRED FOR WATERDOWN METHOD. | | | PLEASE PROVIDE RECENT BACKFLOW APPROVAL RECORD FROM WPB | | | UTILITY DEPARTMENT. | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2021-05-13 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2021-05-13 |
Time |
14:06 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2021-05-13 |
Time |
06:45 |
Sent To |
|
|
| Notes |
| 2021-05-13 14:19:40 | ****CORRECTIONS**** | | | | | | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | | | | BUILDING REVIEW DENIED: | | | | | | #1) FPL RELEASE (OK) | | | | | | #3) FPU RELEASE (OK) | | | | | | #3) WPB RELEASE & WATER DOWN METHOD (FAILED) | | | IT APPEARS THAT USING THE EXISTING BACKFLOW PREVENTER | | | IS DESIRED FOR WATERDOWN METHOD. | | | PLEASE PROVIDE RECENT BACKFLOW APPROVAL RECORD FROM WPB | | | UTILITY DEPARTMENT. | | | | | | #4) SEWER LATERAL CAPPING. (OK) | | | | | | #5) EXTERMINATOR LETTER (OK) | | | | | | #6) DEMO DEBRIS (OK) | | | | | | #7) SITE PLAN/SURVEY (OK) | | | | | | #8) SILT FENCE (OK) | | | | | | #9) ASBESTOS ACKNOWLEDGEMENT LETTER (FAILED) | | | THE CONTRACTOR NEEDS TO SUBMIT THE ASBESTOS | | | ACKNOWLEDGEMENT LETTER. |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
P |
Date |
2021-05-21 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2021-05-21 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
2021-05-21 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
F |
Date |
2021-05-18 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2021-05-18 |
Time |
|
Rev Time |
|
| Received By |
rrossano |
Date |
2021-05-18 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-05-18 08:17:00 | PLEASE ADDRESS BUILDING COMMENTS. |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
1 |
Status |
P |
Date |
2021-06-23 |
|
|
Cont ID |
|
| Sent By |
fmittner |
Date |
2021-06-23 |
Time |
15:15 |
Rev Time |
0.00 |
| Received By |
fmittner |
Date |
2021-06-23 |
Time |
15:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2021-06-23 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2021-06-23 |
Time |
15:39 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2021-05-12 |
Time |
14:14 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
N |
Date |
2021-05-13 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-05-13 |
Time |
07:07 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-05-13 |
Time |
07:07 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2021-06-23 |
|
|
Cont ID |
|
| Sent By |
fmittner |
Date |
2021-06-23 |
Time |
15:16 |
Rev Time |
0.00 |
| Received By |
fmittner |
Date |
2021-06-23 |
Time |
15:16 |
Sent To |
|
|
| Notes |
|
|