Plan Review Details - Permit 21050467
Plan Review Stops For Permit 21050467
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status P Date 2021-05-19 Cont ID  
Sent By pvalenti Date 2021-05-19 Time 14:07 Rev Time 0.00
Received By pvalenti Date 2021-05-19 Time 14:07 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2021-05-13 Cont ID  
Sent By pvalenti Date 2021-05-13 Time 13:43 Rev Time 0.00
Received By pvalenti Date 2021-05-13 Time 06:45 Sent To  
Notes
2021-05-13 13:48:29ASBESTOS REQUIREMENTS:
  
 PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  
 THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO
 [email protected]. THE INFORMATION SHOULD BE IN PDF
 FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE INCLUDE
 THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT LINE.
  
 NOTE: IF A CONTRACTOR IS DEMOLISHING THE STRUCTURE THE
 ASBESTOS ACKNOWLEDGEMENT LETTER IS REQUIRED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2021-05-21 Cont ID  
Sent By pvalenti Date 2021-05-21 Time 16:23 Rev Time 0.00
Received By pvalenti Date 2021-05-21 Time 16:23 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2021-05-19 Cont ID  
Sent By pvalenti Date 2021-05-19 Time 14:11 Rev Time 0.00
Received By pvalenti Date 2021-05-19 Time 14:08 Sent To  
Notes
2021-05-19 14:11:26****CORRECTIONS****
  
 PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 BUILDING REVIEW DENIED:
  
 #3) WPB RELEASE & WATER DOWN METHOD (FAILED)
 IT APPEARS THAT USING THE EXISTING BACKFLOW PREVENTER
 IS DESIRED FOR WATERDOWN METHOD.
 PLEASE PROVIDE RECENT BACKFLOW APPROVAL RECORD FROM WPB
 UTILITY DEPARTMENT.
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-05-13 Cont ID  
Sent By pvalenti Date 2021-05-13 Time 14:06 Rev Time 0.00
Received By pvalenti Date 2021-05-13 Time 06:45 Sent To  
Notes
2021-05-13 14:19:40****CORRECTIONS****
  
 PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 BUILDING REVIEW DENIED:
  
 #1) FPL RELEASE (OK)
  
 #3) FPU RELEASE (OK)
  
 #3) WPB RELEASE & WATER DOWN METHOD (FAILED)
 IT APPEARS THAT USING THE EXISTING BACKFLOW PREVENTER
 IS DESIRED FOR WATERDOWN METHOD.
 PLEASE PROVIDE RECENT BACKFLOW APPROVAL RECORD FROM WPB
 UTILITY DEPARTMENT.
  
 #4) SEWER LATERAL CAPPING. (OK)
  
 #5) EXTERMINATOR LETTER (OK)
  
 #6) DEMO DEBRIS (OK)
  
 #7) SITE PLAN/SURVEY (OK)
  
 #8) SILT FENCE (OK)
  
 #9) ASBESTOS ACKNOWLEDGEMENT LETTER (FAILED)
 THE CONTRACTOR NEEDS TO SUBMIT THE ASBESTOS
 ACKNOWLEDGEMENT LETTER.

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2021-05-21 Cont ID  
Sent By rrossano Date 2021-05-21 Time   Rev Time 0.00
Received By rrossano Date 2021-05-21 Time   Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2021-05-18 Cont ID  
Sent By rrossano Date 2021-05-18 Time   Rev Time  
Received By rrossano Date 2021-05-18 Time   Sent To  
Notes
2021-05-18 08:17:00PLEASE ADDRESS BUILDING COMMENTS.

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2021-06-23 Cont ID  
Sent By fmittner Date 2021-06-23 Time 15:15 Rev Time 0.00
Received By fmittner Date 2021-06-23 Time 15:15 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-06-23 Cont ID  
Sent By lmarchan Date 2021-06-23 Time 15:39 Rev Time 0.00
Received By lmarchan Date 2021-05-12 Time 14:14 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2021-05-13 Cont ID  
Sent By medwards Date 2021-05-13 Time 07:07 Rev Time 0.00
Received By medwards Date 2021-05-13 Time 07:07 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2021-06-23 Cont ID  
Sent By fmittner Date 2021-06-23 Time 15:16 Rev Time 0.00
Received By fmittner Date 2021-06-23 Time 15:16 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved