Plan Review Stops For Permit 21050064
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-06-25 Cont ID  
Sent By rmcdouga Date 2021-06-25 Time 16:32 Rev Time 0.00
Received By rmcdouga Date 2021-06-25 Time 16:32 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-05-28 Cont ID  
Sent By rmcdouga Date 2021-05-28 Time 08:00 Rev Time 0.00
Received By rmcdouga Date 2021-05-28 Time 08:00 Sent To  
Notes
2021-05-28 08:05:45PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SEVENTH EDITION (2020)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE ENGINEERING FOR THE GENERATOR PAD THAT WAS
 SUBMITTED IS SPECIFIC TO GENERAC BRAND GENERATORS AND
 YOU ARE INSTALLING A HONEYWELL GENERATOR. SUBMIT
 ENGINEERING FOR THE HONEYWELL GENERATOR. FBC 107.2.1
  
 2) THE GENERATOR PAD ENGINEERING IS NOT DIGITALLY
 SIGNED. SEE THE SIGNATURE REVIEW COMMENTS.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-05-19 Cont ID  
Sent By jleahy Date 2021-05-19 Time 16:02 Rev Time 0.00
Received By jleahy Date 2021-05-19 Time 15:59 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-06-25 Cont ID  
Sent By rmcdouga Date 2021-06-25 Time 16:32 Rev Time 0.00
Received By rmcdouga Date 2021-06-24 Time 11:47 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-06-11 Cont ID  
Sent By jleahy Date 2021-06-11 Time 15:47 Rev Time 0.00
Received By jleahy Date 2021-05-05 Time 14:07 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-06-25 Cont ID  
Sent By rmcdouga Date 2021-06-25 Time 16:32 Rev Time 0.00
Received By rmcdouga Date 2021-06-25 Time 16:32 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2021-05-28 Cont ID  
Sent By rmcdouga Date 2021-05-28 Time 08:06 Rev Time 0.00
Received By rmcdouga Date 2021-05-28 Time 08:05 Sent To  
Notes
2021-05-28 08:09:18THE GENERATOR PAD ENGINEERING DOES NOT HAVE THE
 ENGINEER'S DIGITAL SIGNATURE. ELECTRONICALLY SUBMITTED
 DRAWINGS ARE REQUIRED TO HAVE THE ARCHITECT OR
 ENGINEER'S DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE THE
 OPTION TO SUBMIT THE SIGNED AND SEALED PAPER VERSION OF
 DRAWINGS. AFTER THE ELECTRONIC PLANS HAVE BEEN
 APPROVED, YOU CAN SUBMIT THE CORRESPONDING PAPER
 DRAWINGS AT THE BUILDING DEPARTMENT TO BE VERIFIED. THE
 ARCHITECT OR ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE
 AND SEAL IS REQUIRED TO BE ON THE DRAWINGS. NO
 PHOTOCOPY OR OTHER FACSIMILES OF THE SIGNATURE ARE
 ACCEPTABLE. FS 481 & 61G1 OR FS 471 & 61G15
  

Review Stop Z ZONING
Rev No 1 Status P Date 2021-06-09 Cont ID  
Sent By kalexand Date 2021-06-09 Time 14:06 Rev Time 0.00
Received By kalexand Date 2021-06-09 Time 14:06 Sent To I
Notes
***NONE***