| 2021-05-20 16:01:05 | FAILED |
| | |
| | 1) SHEET T1 LISTS THE SCOPE OF WORK INCLUDES THE |
| | INSTALLATION OF AN ENCLOSURE CABINET. NONE OF THE PLANS |
| | SHOW AN ENCLOSURE CABINET. PLEASE CLARIFY WHAT THIS |
| | MEANS. THE CITY DOES NOT PERMIT FREESTANDING OR POLE |
| | MOUNTED CABINETS. |
| | |
| | 2) THE UTILITY POWER PLAN WAS NOT INCLUDED (THIS IS |
| | SHEET E2 ON THE ELECTRICAL PERMIT 20101235 SUBMITTAL) |
| | THAT SHOWS THE UNDERGROUND POWER THAT IS BEING PULLED |
| | FROM 4TH STREET. THE UNDERGROUND POWER PATH, INCLUDING |
| | ANY BORE PITS AND HANDHOLES ARE REQUIRED TO BE SHOWN ON |
| | THE WIRELESS COMMUNICATION FACILITY ROW PERMIT |
| | APPLICATION. |
| | |
| | 3) PROVIDE A SURVEY, PREPARED BY A FLORIDA LICENSED |
| | SURVEYOR, SHOWING THE RIGHT-OF-WAY LINE AND THE EDGE OF |
| | THE SIDEWALK, WITH DIMENSIONS FOR THE UNDERGROUND POWER |
| | FROM THE WIRELESS POLE ON 3RD STREET TO THE ELECTRIC |
| | SERVICE POLE ON 4TH STREET. |
| | |
| | 4) THE ENGINEERING PLAN (UTILITY POWER PLAN) NEEDS TO |
| | SHOW THE RIGHT-OF-WAY LINE (BASED ON THE SURVEY) AND |
| | CLEARLY DEMONSTRATE THAT THE HANDHOLES, BORE PITS AND |
| | UNDERGROUND POWER BORE ARE COMPLETELY LOCATED WITHIN |
| | THE RIGHT-OF-WAY. NOTE: THE BORE APPEARS TO CROSS ONTO |
| | PRIVATE PROPERTY ON THE UTILITY POWER PLAN INCLUDED |
| | WITH PERMIT 20101235. IF THE SURVEY SHOWS A GENERAL |
| | UTILITY EASEMENT AT THIS LOCATION, THEN THE UNDERGROUND |
| | FEATURES MAY CROSS INTO THE EASEMENT. |
| | |
| | THE POLE LOCATION AND STEALTH DESIGN MEETS CITY |
| | STANDARDS. |
| | |
| | CONTACT ERIC SCHNEIDER @ (561) 822-1446 |
| | [email protected] |
| | |
| | |