| 2021-06-29 11:34:56 | UTILITY BUILDING |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected]. |
| | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| | AMENDMENT |
| | |
| | CORRECTIONS NEEDED - |
| | 1) PLEASE SHOW THE ROOF SHEATHING ATTACHMENT (NAILING |
| | SIZE AND TYPE) FBC 2304.10.1 |
| | 2) PRODUCT APPROVAL PROVIDED FOR THE SKY LIGHT DOES NOT |
| | MEET THE REQUIRED WIND DESIGN PRESSURES SHOWN ON |
| | DRAWING A-3. |
| | 3) PRODUCT APPROVAL PROVIDED FOR THE SWING DOOR DOES |
| | NOT MEET THE REQUIRED WIND DESIGN PRESSURES SHOWN ON |
| | DRAWING A-3. |
| | 4) PRODUCT APPROVAL PROVIDED FOR THE OVERHEAD DOOR DOES |
| | NOT MEET THE REQUIRED WIND DESIGN PRESSURES SHOWN ON |
| | DRAWING A-3. |
| | 5) THE INSTALLATION DRAWINGS FOR THE SWING DOOR |
| | (DRAWING NUMBER D015726) IS NOT PART OF THE PRODUCT |
| | APPROVAL (FRONT PAGE PROVIDED FL16708 R13) - PLEASE |
| | PROVIDE A COMPLETE PRODUCT APPROVAL FOR THE SWING DOOR. |
| | 6) PRODUCT APPROVAL (FL14672-R6) FOR THE FLAT DECK |
| | ROOFING = NEED TO CHOOSE A ROOFING SYSTEM IN THE |
| | PRODUCT APPROVAL INSTALLATION INSTRUCTIONS THAT SHOWS |
| | THE REQUIRED WIND DESIGN PRESSURE AS SHOWN ON DRAWING |
| | (A-3) - PLEASE CIRCLE THE ROOFING SYSTEM TO BE USED IN |
| | THE PRODUCT APPROVAL - IF NEEDED PLEASE PROVIDE |
| | ADDITIONAL ATTACHMENT DETAILS FROM AN ARCHITECT OR |
| | ENGINEER FOR THE ROOF ZONES 2 AND 3 WHICH MAY REQUIRE A |
| | HIGHER WIND PRESSURE THEN THE CHOSEN ROOFING SYSTEM - |
| | SEE NOTES ON THE PRODUCT APPROVAL. |
| | 7) PLEASE PROVIDE A PRODUCT APPROVAL FOR THE WINDOWS, |
| | LOUVERS OR SHUTTERS - DRAWINGS NEED TO SAY WHETHER THE |
| | SIDE OPENINGS ARE WINDOWS, LOUVERS OR SHUTTERS. |
| | 8) ROOFING SYSTEM AND WINDOW AND DOOR PRODUCT APPROVALS |
| | MAY BE DEFERRED SUBMITTALS BY LISTING ITEMS TO BE |
| | DEFERRED ON THE CONSTRUCTION DOCUMENTS - 107.3.4.1 |
| | DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, |
| | DEFERRED SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF |
| | THE DESIGN THAT ARE NOT SUBMITTED AT THE TIME OF THE |
| | APPLICATION AND THAT ARE TO BE SUBMITTED TO THE |
| | BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL |
| | OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF |
| | THE BUILDING OFFICIAL. THE REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE |
| | DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR |
| | REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR DEFERRED |
| | SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE REGISTERED |
| | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL |
| | REVIEW THEM AND FORWARD THEM TO THE BUILDING OFFICIAL |
| | WITH A NOTATION INDICATING THAT THE DEFERRED SUBMITTAL |
| | DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL |
| | CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED |
| | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE |
| | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE |
| | BUILDING OFFICIAL. |