|
 |
 |
 |
 |
 |
Plan Review Details - Permit 21040642
| Plan Review Stops For Permit 21040642 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
N |
Date |
2021-04-28 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-04-28 |
Time |
12:45 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-04-28 |
Time |
12:45 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
P |
Date |
2021-05-18 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2021-05-18 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
2021-05-18 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-05-18 09:58:51 | APPLICANT CONFIRMED VERTICAL CLEARANCES OVER EXISTING | | | CITY UTILITY INFRASTRUCTURE TO BE PROVIDED AND SHOWN ON | | | ASBUILTS. |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
F |
Date |
2021-05-12 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2021-05-12 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
2021-05-12 |
Time |
|
Sent To |
I |
|
| Notes |
| 2021-05-12 16:17:53 | PLEASE ADDRESS ZONING COMMENTS. | | | PLEASE CONFIRM VERTICAL CLEARANCES ARE MET OVER | | | EXISTING UG CITY UTILITIES PER CITY STANDARD | | | CONSTRUCTION DETAIL GC-8. | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES | | | DEPARTMENT | | | DIRECT: (561) 494-1098 [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2021-05-24 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2021-05-24 |
Time |
13:36 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2021-05-17 |
Time |
13:40 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2021-05-13 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2021-05-13 |
Time |
17:19 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2021-04-12 |
Time |
13:40 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2021-05-18 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-05-18 |
Time |
17:12 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-05-18 |
Time |
17:11 |
Sent To |
|
|
| Notes |
| 2021-05-18 17:12:40 | ORIGINAL SIGNED AND SEALED PAPER DRAWINGS ROUTED TO | | | STORAGE.ME |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2021-04-12 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-04-12 |
Time |
16:17 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-04-12 |
Time |
16:13 |
Sent To |
|
|
| Notes |
| 2021-04-12 16:19:31 | THE SUBMITTED DOCUMENTS HAVE A COPY OF THE DIGITAL | | | SIGNATURE. PLEASE SUBMIT THE ORIGINAL DIGITAL SIGNATURE | | | OR YOU MAY BRING TO OUR OFFICE THE PAPER ORIGINALS OF A | | | SIGNED AND SEALED SET OF DRAWINGS.. | | | | | | PER THE WPB AMENDMENTS TO THE FBC, EACH SHEET OF PLAN | | | (INCLUDING THE SUPPORTING DOCUMENTS) IS REQUIRED TO BE | | | SIGNED AND SEALED BY THE PERSON RESPONSIBLE FOR THE | | | DESIGN. A DIGITAL PLAN REQUIRES A DIGITAL SIGNATURE | | | WITH THE PROPER THIRD PARTY VERIFICATION. PROVIDE | | | CORRECTION. ALTERNATIVELY, A SIGNED/SEALED PAPER SET | | | MAY BE SUPPLIED TO THE BUILDING DEPARTMENT WHEN ALL | | | TRADES ARE APPROVED. WPB FBC 107.1; FS 471/481 | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2021-05-21 |
|
|
Cont ID |
|
| Sent By |
awooten |
Date |
2021-05-21 |
Time |
|
Rev Time |
0.00 |
| Received By |
awooten |
Date |
2021-05-21 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2021-04-30 |
|
|
Cont ID |
|
| Sent By |
awooten |
Date |
2021-04-30 |
Time |
|
Rev Time |
|
| Received By |
awooten |
Date |
2021-04-30 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-04-30 16:11:46 | ********************ZONING REVIEW | | | FAILED*********************************** | | | | | | PLEASE RESPOND IN WRITING. | | | | | | APPLICATION STATES NEW BUS STOPS, BUT MORE INFORMATION | | | IS NEEDED. | | | | | | WHAT IS THE PURPOSE OF THE NEW PAVEMENT? | | | | | | HOW IS THE NEW PAVEMENT ASSOCIATED WITH THE EXISTING | | | BUS STOP AND BENCHES? | | | | | | ALANA WOOTEN | | | PLANNER | | | PLANNING DIVISION | | | 561-822-1449 | | | [email protected] | | | | | | |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |