Plan Review Details - Permit 21040642
Plan Review Stops For Permit 21040642
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status N Date 2021-04-28 Cont ID  
Sent By rmcphers Date 2021-04-28 Time 12:45 Rev Time 0.00
Received By rmcphers Date 2021-04-28 Time 12:45 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2021-05-18 Cont ID  
Sent By rrossano Date 2021-05-18 Time   Rev Time 0.00
Received By rrossano Date 2021-05-18 Time   Sent To  
Notes
2021-05-18 09:58:51APPLICANT CONFIRMED VERTICAL CLEARANCES OVER EXISTING
 CITY UTILITY INFRASTRUCTURE TO BE PROVIDED AND SHOWN ON
 ASBUILTS.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2021-05-12 Cont ID  
Sent By rrossano Date 2021-05-12 Time   Rev Time 0.00
Received By rrossano Date 2021-05-12 Time   Sent To I
Notes
2021-05-12 16:17:53PLEASE ADDRESS ZONING COMMENTS.
 PLEASE CONFIRM VERTICAL CLEARANCES ARE MET OVER
 EXISTING UG CITY UTILITIES PER CITY STANDARD
 CONSTRUCTION DETAIL GC-8.
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT
 DIRECT: (561) 494-1098 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-05-24 Cont ID  
Sent By ccole Date 2021-05-24 Time 13:36 Rev Time 0.00
Received By ccole Date 2021-05-17 Time 13:40 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-05-13 Cont ID  
Sent By jleahy Date 2021-05-13 Time 17:19 Rev Time 0.00
Received By jleahy Date 2021-04-12 Time 13:40 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-05-18 Cont ID  
Sent By medwards Date 2021-05-18 Time 17:12 Rev Time 0.00
Received By medwards Date 2021-05-18 Time 17:11 Sent To  
Notes
2021-05-18 17:12:40ORIGINAL SIGNED AND SEALED PAPER DRAWINGS ROUTED TO
 STORAGE.ME

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2021-04-12 Cont ID  
Sent By medwards Date 2021-04-12 Time 16:17 Rev Time 0.00
Received By medwards Date 2021-04-12 Time 16:13 Sent To  
Notes
2021-04-12 16:19:31THE SUBMITTED DOCUMENTS HAVE A COPY OF THE DIGITAL
 SIGNATURE. PLEASE SUBMIT THE ORIGINAL DIGITAL SIGNATURE
 OR YOU MAY BRING TO OUR OFFICE THE PAPER ORIGINALS OF A
 SIGNED AND SEALED SET OF DRAWINGS..
  
 PER THE WPB AMENDMENTS TO THE FBC, EACH SHEET OF PLAN
 (INCLUDING THE SUPPORTING DOCUMENTS) IS REQUIRED TO BE
 SIGNED AND SEALED BY THE PERSON RESPONSIBLE FOR THE
 DESIGN. A DIGITAL PLAN REQUIRES A DIGITAL SIGNATURE
 WITH THE PROPER THIRD PARTY VERIFICATION. PROVIDE
 CORRECTION. ALTERNATIVELY, A SIGNED/SEALED PAPER SET
 MAY BE SUPPLIED TO THE BUILDING DEPARTMENT WHEN ALL
 TRADES ARE APPROVED. WPB FBC 107.1; FS 471/481
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop Z ZONING
Rev No 2 Status P Date 2021-05-21 Cont ID  
Sent By awooten Date 2021-05-21 Time   Rev Time 0.00
Received By awooten Date 2021-05-21 Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2021-04-30 Cont ID  
Sent By awooten Date 2021-04-30 Time   Rev Time  
Received By awooten Date 2021-04-30 Time   Sent To  
Notes
2021-04-30 16:11:46********************ZONING REVIEW
 FAILED***********************************
  
 PLEASE RESPOND IN WRITING.
  
 APPLICATION STATES NEW BUS STOPS, BUT MORE INFORMATION
 IS NEEDED.
  
 WHAT IS THE PURPOSE OF THE NEW PAVEMENT?
  
 HOW IS THE NEW PAVEMENT ASSOCIATED WITH THE EXISTING
 BUS STOP AND BENCHES?
  
 ALANA WOOTEN
 PLANNER
 PLANNING DIVISION
 561-822-1449
 [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved