Plan Review Stops For Permit 21040581
Review Stop G GAS REVIEW
Rev No 3 Status P Date 2021-10-06 Cont ID  
Sent By lcrespo Date 2021-10-06 Time 11:36 Rev Time 0.00
Received By lcrespo Date 2021-10-06 Time 11:35 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2021-09-13 Cont ID  
Sent By lcrespo Date 2021-09-13 Time 19:15 Rev Time 0.00
Received By lcrespo Date 2021-09-13 Time 19:15 Sent To  
Notes
2021-09-13 19:16:0209/13/21 2ND PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. I HAVE RESEARCHED CITY RECORDS BACK TO 2000, AND
 THERE IS NO RECORD OF A PERMIT FOR THE INSTALLATION OF
 AN LP TANK. THE CITY OF WEST PALM BEACH HAS NO RECORD
 OF EXISTING LP GAS PERMITS WITH INSPECTIONS OF THE
 CURRENT SYSTEM. A COMPLETE EVALUATION OF ALL GAS
 SYSTEMS AND EQUIPMENT WILL BE DONE AT THE FIELD, AND IF
 NOT TO CODE, IT MAY NEED TO BE BOUT UP TO CODE
 COMPLIANCE AT THE OWNER?S EXPENSE PER THE WPB
 AMENDMENTS TO THE FBC SEC. 105.1.
  
 2. CLEARLY SHOW THE DISTANCE OF THE TANK FROM THE
 EXTERIOR BUILDING WALL AND ADJACENT PROPERTY LINES, THE
 DISTANCE OF THE TANK FROM ALL SOURCES OF IGNITION,
 OTHER CONTAINERS, BUILDINGS, AND THE LOCATION OF ANY
 BUILDING OPENINGS BELOW THE RELIEF VALVE OF THE TANK
 PER THE NFPA 58, TABLE 3-2.2.2.
  
 3. IF THE TANK IS BELOW GROUND IT SHALL BE ANCHORED PER
 NFPA 58 SEC.3-2.2.7 (H). SHOW THE DEPTH OF THE LP GAS
 CONTAINER BELOW GRADE TO COMPLY WITH NFPA 58 SEC.
 6.6.6.1. CLEARLY INDICATE ON THE TIE-DOWN SHEET IF THE
 LP TANK TIE-DOWN METHOD AND IF YOU ARE USING STRAPS OR
 CABLE, IF CABLE HOW IS IT PROTECTED FOR THE LP TANK AND
 APPURTENANCES PER NFPA 58 AND WPB AMENDMENTS TO THE FBC
 SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 4. PLEASE HAVE A SIGNATURE ON THE ISOMETRIC DRAWING OF
 THE PERSON DESIGNING THE SYSTEM, NOT IN ACCORDANCE WITH
 FLORIDA ADMINISTRATIVE CODE 61G15-23.001, FLORIDA
 STATUTE 471 PER THE WPB AMENDMENTS TO THE FBC SEC.
 107.1 GENERAL.
  
 WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES.
 A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION,
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND, WILL HELP EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2021-04-21 Cont ID  
Sent By lcrespo Date 2021-04-21 Time 10:28 Rev Time 0.00
Received By lcrespo Date 2021-04-20 Time 14:04 Sent To  
Notes
2021-04-21 10:29:1704/21/21 1ST LP GAS REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. PLEASE SHOW THE METHOD OF PROTECTION FOR THE LP TANK
 AND APPURTENANCES PER NFPA 58. THE TANK IS BELOW
 GROUND. IT SHALL BE ANCHORED PER NFPA 58 SEC.3-2.2.7
 (H) 11. INDICATE ON THE TIE-DOWN SHEET IF THE LP TANK
 TIE-DOWN METHOD AND IF YOU ARE USING STRAPS OR CABLE,
 IF CABLE HOW IS IT PROTECTED FOR THE LP TANK AND
 APPURTENANCES PER NFPA 58 AND WPB AMENDMENTS TO THE FBC
 SEC. 107.2.1. INFORMATION ON CONSTRUCTION DOCUMENTS.
 PROVIDE THE SIZE OF THE HOLD-DOWN CABLES/STRAPS FOR THE
 TANK AND THE TYPE AND LENGTH OF GROUND ANCHORS TO BE
 INSTALLED TO PREVENT FLOTATION PER THE NFPA 58 SEC.
 6.6.1.6.
  
 2. PLEASE CLEARLY SHOW THE LOCATION AND CAPACITY OF LP
 TANK(S), TYPE OF TANK (DOT OR ASME), THE DISTANCE OF
 THE TANK FROM THE EXTERIOR BUILDING WALL AND ADJACENT
 PROPERTY LINES, THE DISTANCE OF THE TANK FROM ALL
 SOURCES OF IGNITION, OTHER CONTAINERS, BUILDINGS, AND
 THE LOCATION OF ANY BUILDING OPENINGS BELOW THE RELIEF
 VALVE OF THE TANK PER THE NFPA 58, TABLE 3-2.2.2.
 3. PLEASE SHOW THE DEPTH OF THE LP GAS CONTAINER BELOW
 GRADE TO COMPLY WITH NFPA 58 SEC. 6.6.6.1.
  
 4. A CATHODIC PROTECTION SYSTEM WAS SUBMITTED. PLEASE
 PROVIDE THE SIZE (LBS.) & THE NUMBER OF MAGNESIUM
 BAG(S), SIZE & TYPE OF ANODE CABLE AMOUNT OF WATER TO
 ACTIVATE IT.
  
 WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES.
 A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND WILL HELP EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2021-10-06 Cont ID  
Sent By lcrespo Date 2021-10-06 Time 11:36 Rev Time 0.00
Received By lcrespo Date 2021-09-29 Time 08:56 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-09-13 Cont ID  
Sent By lcrespo Date 2021-09-13 Time 19:16 Rev Time 0.00
Received By lcrespo Date 2021-09-03 Time 13:42 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-04-21 Cont ID  
Sent By lcrespo Date 2021-04-21 Time 10:29 Rev Time 0.00
Received By lcrespo Date 2021-04-09 Time 09:35 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status N Date 2021-10-06 Cont ID  
Sent By lcrespo Date 2021-10-06 Time 11:36 Rev Time 0.00
Received By lcrespo Date 2021-10-06 Time 11:36 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status N Date 2021-09-13 Cont ID  
Sent By lcrespo Date 2021-09-13 Time 19:16 Rev Time 0.00
Received By lcrespo Date 2021-09-13 Time 19:16 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2021-04-21 Cont ID  
Sent By lcrespo Date 2021-04-21 Time 10:28 Rev Time 0.00
Received By lcrespo Date 2021-04-20 Time 14:04 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2021-04-21 Cont ID  
Sent By lcrespo Date 2021-04-21 Time 10:29 Rev Time 0.00
Received By lcrespo Date 2021-04-21 Time 10:29 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2021-10-06 Cont ID  
Sent By rthermid Date 2021-10-06 Time   Rev Time 0.00
Received By rthermid Date 2021-10-06 Time   Sent To I
Notes
2021-10-06 13:48:52TANK IS REQUIRED TO BE UNDERGROUND.
  
 RAFAELA THERMIDOR, ASSOCIATE PLANNER