| Plan Review Stops For Permit 21031555 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2021-06-24 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2021-06-24 |
Time |
16:21 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-06-24 |
Time |
16:21 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2021-06-09 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2021-06-09 |
Time |
11:56 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-06-09 |
Time |
11:56 |
Sent To |
|
|
| Notes |
| 2021-05-28 10:54:06 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC SEVENTH EDITION (2020) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) SUBMIT A GENERATOR PAD DRAWING THAT SPECIFIES HOW | | | THE GENERATOR IS ANCHORED TO RESIST WIND LOADS. IF YOU | | | ARE USING A PREFABRICATED GENERATOR PAD SUBMIT THE | | | SIGNED AND SEALED SITE SPECIFIC ENGINEERING FOR IT. | | | SPECIFY THE WIND LOAD DATA ON THE DRAWING. FBC 107.2.1 | | | | | | 2) THE GENERATOR EXHAUST IS REQUIRED TO BE AT LEAST 10 | | | FEET FROM ANY OPENINGS INTO A BUILDING. R303.5.1 INTAKE | | | OPENINGS. MECHANICAL AND GRAVITY OUTDOOR AIR INTAKE | | | OPENINGS SHALL BE LOCATED NOT LESS THAN 10 FEET (3048 | | | MM) FROM ANY HAZARDOUS OR NOXIOUS CONTAMINANT, SUCH AS | | | VENTS, CHIMNEYS, PLUMBING VENTS, STREETS, ALLEYS, | | | PARKING LOTS AND LOADING DOCKS. | | | | | | 3) SEE SIGNATURE REVIEW. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2021-05-18 |
|
|
Cont ID |
|
| Sent By |
equinone |
Date |
2021-05-18 |
Time |
14:48 |
Rev Time |
0.00 |
| Received By |
equinone |
Date |
2021-05-18 |
Time |
14:48 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2021-05-13 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-05-13 |
Time |
10:46 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-05-13 |
Time |
10:46 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2021-07-23 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-07-23 |
Time |
13:38 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-06-15 |
Time |
16:56 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2021-06-09 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2021-06-09 |
Time |
12:00 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-05-04 |
Time |
15:03 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
N |
Date |
2021-05-13 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-05-13 |
Time |
10:47 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-05-13 |
Time |
10:47 |
Sent To |
|
|
| Notes |
| 2021-05-13 10:47:44 | GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN | | | THIS SUBMITTAL PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN | | | PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND PLANS | | | WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE | | | RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT | | | REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER | | | THE WPB AMENDMENTS TO FBC SEC. 107.2.1. | | | | | | A SUB GAS PERMIT IS REQUIRED BY A LICENSED CONTRACTOR | | | FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS TO THE FBC | | | SEC. 105.1. | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2021-06-24 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2021-06-24 |
Time |
16:21 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-06-24 |
Time |
16:21 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2021-06-09 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2021-06-09 |
Time |
11:56 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-05-28 |
Time |
10:36 |
Sent To |
|
|
| Notes |
| 2021-06-09 12:00:45 | THE ENGINEER'S DIGITAL SIGNATURE IS REQUIRED ON | | | PREFABRICATED GENERATOR SLAB DRAWINGS. ELECTRONICALLY | | | SUBMITTED DRAWINGS ARE REQUIRED TO HAVE THE ARCHITECT | | | OR ENGINEER'S DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE | | | THE OPTION TO SUBMIT THE SIGNED AND SEALED PAPER | | | VERSION OF DRAWINGS. AFTER THE ELECTRONIC PLANS HAVE | | | BEEN APPROVED, YOU CAN SUBMIT THE CORRESPONDING PAPER | | | DRAWINGS AT THE BUILDING DEPARTMENT TO BE VERIFIED. THE | | | ARCHITECT OR ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE | | | AND SEAL IS REQUIRED TO BE ON THE DRAWINGS. NO | | | PHOTOCOPY OR OTHER FACSIMILES OF THE SIGNATURE ARE | | | ACCEPTABLE. FS 481 & 61G1 OR FS 471 & 61G15 | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2021-07-22 |
|
|
Cont ID |
|
| Sent By |
kalexand |
Date |
2021-07-22 |
Time |
18:50 |
Rev Time |
0.00 |
| Received By |
kalexand |
Date |
2021-07-22 |
Time |
18:50 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2021-06-09 |
|
|
Cont ID |
|
| Sent By |
kalexand |
Date |
2021-06-09 |
Time |
09:33 |
Rev Time |
0.00 |
| Received By |
kalexand |
Date |
2021-06-09 |
Time |
09:33 |
Sent To |
|
|
| Notes |
|
|