| Plan Review Stops For Permit 21031302 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
2 |
Status |
P |
Date |
2022-02-07 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2022-02-07 |
Time |
13:44 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2022-02-07 |
Time |
13:44 |
Sent To |
|
|
| Notes |
| 2022-02-07 13:44:52 | BLDG TO BE DEMOLISHED IS 3404 BROADWAY |
|
|
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
F |
Date |
2022-01-21 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2022-01-21 |
Time |
09:23 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2022-01-21 |
Time |
09:23 |
Sent To |
|
|
| Notes |
| 2022-01-21 09:24:57 | WHICH BUILDING IS BEING DEMOLISHED, TWO COMMERCIAL | | | BUILDINGS ON THE PARCEL, 3404 BROADWAY OR 3408 | | | BROADWAY? A SEPARATE DEMO PERMIT IS REQUIRED FOR EAVCH | | | STRUCTURE. PLEASE RESPOND TO [email protected] OR CALL | | | 561-805-6659. |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
2 |
Status |
P |
Date |
2022-01-21 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-01-21 |
Time |
10:21 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-01-21 |
Time |
07:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
1 |
Status |
F |
Date |
2021-07-22 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2021-07-22 |
Time |
08:05 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2021-07-22 |
Time |
07:56 |
Sent To |
|
|
| Notes |
| 2021-07-22 08:06:40 | ****CORRECTIONS**** | | | | | | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | | | | ASBESTOS REQUIREMENTS: | | | | | | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | | COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE | | | GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS | | | REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE: | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | | RENOVATION.HTML | | | | | | THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO | | | [email protected]. THE INFORMATION SHOULD BE IN PDF | | | FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE INCLUDE | | | THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT LINE. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2022-02-10 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-02-10 |
Time |
13:53 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-02-10 |
Time |
13:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2022-01-21 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-01-21 |
Time |
09:50 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-01-21 |
Time |
07:43 |
Sent To |
|
|
| Notes |
| 2022-01-21 10:20:58 | PETER E VALENTI | | | BUILDING PLANS EXAMINER II | | | [email protected] | | | 561 805 6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC R = FBC RESIDENTIAL | | | FBC EB = EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC M = FBC MECHANICAL | | | FBC FG = FBC FUEL GAS | | | | | | BUILDING REVIEW DENIED: | | | | | | 1.) THE PUBLIC UTILITIES DEMOLITION APPLICATION NEEDS | | | TO BE SIGNED AND COMPLETED BY PUBLIC UTILITIES. AFTER | | | RECEIVING THE SIGNED/COMPLETED PUBLIC UTILITIES DEMO | | | APPLICATION FROM PUBLIC UTILITIES, UPLOAD TO PROJECT | | | DOX. | | | 2.) IT APPEARS THAT THERE ARE (2) DIFFERENT STRUCTURES | | | THAT WILL BE DEMOLISHED. PLEASE CLARIFY WHICH STRUCTURE | | | THIS PERMIT IS FOR AS THERE ARE SUBMITTALS WITH | | | DIFFERENT ADDRESSES. EACH STRUCTURE MUST HAVE ITS OWN | | | PERMIT. | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2021-07-22 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2021-07-22 |
Time |
08:15 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2021-07-22 |
Time |
07:56 |
Sent To |
|
|
| Notes |
| 2021-07-22 08:18:25 | ****CORRECTIONS**** | | | | | | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | | | | THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A | | | DEMO PERMIT PER FLORIDA BUILDING | | | CODE, BUILDING 3303: | | | | | | 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC) | | | RELEASE OF SERVICE CONFIRMATION | | | | | | 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS) | | | RELEASE OF SERVICE CONFIRMATION | | | | | | 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER | | | DEPARTMENT, REQUEST FOR METER PULL, ON | | | THEIR FORM "DEMOLITION APPLICATION" | | | HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B | | | UILDING-PERMIT-FORMS | | | | | | IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED, | | | THEN A PARTIAL RELEASE WILL BE | | | NOTED ON THEIR FORM. | | | BACKFLOW - BEFORE SCHEDULING THE 703, THE BACKFLOW | | | DEVICE NEEDS TO BE TESTED AND CERTIFIED BY THE CITY?S | | | UTILITIES DEPT, 561-822-2244. | | | FAX THE COMPLETED "DEMOLITION APPLICATION" FORM TO | | | 561-822-2183. | | | | | | 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT | | | APPLICATION TO BUILDING DIVISION); | | | SCHEDULE A FINAL PLUMBING #703. | | | | | | 5. EXTERMINATION LETTER - LETTER FROM A LICENSED PEST | | | CONTROL COMPANY STATING THAT | | | DEMOLITION ADDRESS HAS BEEN INSPECTED AND/OR TREATED | | | FOR RODENTS. | | | | | | 6. COMPLETE THE DEMO DEBRIS FORM: | | | | | | HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B | | | UILDING-PERMIT-FORMS | | | | | | IF THE FORM IS NOT AVAILABLE ONLINE, SEND A REQUEST FOR | | | THE FORM TO [email protected]. | | | | | | 7. PROVIDE A SITE PLAN OR SURVEY SHOWING LOCATION OF | | | THE STRUCTURE(S) TO BE DEMOLISHED, | | | FBC 107. | | | | | | 8. PROVIDE A STORMWATER POLLUTION PREVENTION PLAN. | | | | | | 9. PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | | COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE | | | GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING | | | ASBESTOS REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE: | | | | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | | RENOVATION.HTML | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
3 |
Status |
P |
Date |
2022-02-10 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2022-02-10 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
2022-02-10 |
Time |
|
Sent To |
I |
|
| Notes |
| 2022-02-10 14:25:11 | PASSED WITH PROVISO: | | | | | | CALL FOR LOCATES, DIAL 811 BEFORE YOU DIG. FOR MORE | | | INFO ON "CALL BEFORE YOU DIG", GO TO | | | HTTP://WWW.SUNSHINE811.COM (REF: UNDERGROUND FACILITY | | | DAMAGE PREVENTION AND SAFETY ACT, FLORIDA STATUTE, | | | CHAPTER 556.) | | | | | | THANKS, | | | RICK ROSSANO, SENIOR PROJECT COORDINATOR, | | | CITY OF WPB ENGINEERING SERVICES DEPARTMENT | | | DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE: | | | (561) 246-9525 | | | EMAIL: [email protected] | | | HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING- | | | STANDARDS-DETAILS | | | CENTRAL OPERATIONS CENTER (DISPATCH): | | | 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC | | | UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210 | | | | | | |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
F |
Date |
2022-01-13 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2022-01-13 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
2022-01-13 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-01-13 16:10:16 | PROVIDE CITY WATER/SEWER PUBLIC UTIL;ITY SIGN OFFS. |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
F |
Date |
2021-08-04 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2021-08-04 |
Time |
|
Rev Time |
|
| Received By |
rrossano |
Date |
2021-08-04 |
Time |
|
Sent To |
I |
|
| Notes |
| 2021-08-04 09:38:08 | PLEASE PROVIDE REQUIRED UTILITY SIGN OFF DOCS AS | | | REQUESTED BY BUILDING DEPT. |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
1 |
Status |
P |
Date |
2021-07-24 |
|
|
Cont ID |
|
| Sent By |
fmittner |
Date |
2021-07-24 |
Time |
12:17 |
Rev Time |
0.00 |
| Received By |
fmittner |
Date |
2021-07-24 |
Time |
12:17 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2022-02-10 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2022-02-10 |
Time |
15:02 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2022-02-08 |
Time |
16:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-01-21 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-01-21 |
Time |
10:21 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-01-12 |
Time |
14:44 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2021-08-04 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2021-08-04 |
Time |
14:39 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2021-07-20 |
Time |
14:56 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2022-02-09 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-02-09 |
Time |
07:58 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-02-09 |
Time |
07:53 |
Sent To |
|
|
| Notes |
| 2022-02-09 08:00:46 | PETER E VALENTI | | | BUILDING PLANS EXAMINER II | | | [email protected] | | | 561 805 6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC R = FBC RESIDENTIAL | | | FBC EB = EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC M = FBC MECHANICAL | | | FBC FG = FBC FUEL GAS | | | | | | SIGNATURE REVIEW APPROVED. | | | | | | SUBMITTED DEMO PAPER PLAN SHEETS C-1, PP-1, PP-2, & | | | DE-1 HAND SIGNED/SEALED OK |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2022-01-13 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-01-13 |
Time |
09:44 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-01-13 |
Time |
09:44 |
Sent To |
|
|
| Notes |
| 2022-01-13 09:52:17 | SIGNATURE REVIEW | | | | | | CORRECTIONS NEEDED - | | | | | | 1) DRAWINGS THAT WERE DELIVERED TO THE CITY FOR | | | UPLOADING TO PROJECTDOX C1,C2, C3, C4 NEED TO BE SIGNED | | | AND SEALED BY THE DESIGNER FBC 107.2.1 | | | | | | 2) SURVEY DELIVERED TO THE CITY FOR UPLOADING TO | | | PROJECTDOX IS ORIGINALLY SIGNED AND SEALED -OK AND | | | TAKEN TO STORAGE. (MICHAEL MILLER - SURVEYOR) | | | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. (A | | | CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED | | | A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF | | | E-SIGNATURE).- OR - IF YOUR ARCHITECT OR ENGINEER DOES | | | NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN | | | DROP OFF THE ORIGINAL SIGNED AND SEALED | | | DRAWINGS/DOCUMENTS TO THE FRONT DESK IN THE BUILDING | | | DIVISION AT THE CITY HALL. | | | | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
N |
Date |
2021-07-22 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2021-07-22 |
Time |
08:05 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2021-07-22 |
Time |
07:56 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2021-07-26 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2021-07-26 |
Time |
08:56 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2021-07-26 |
Time |
08:56 |
Sent To |
|
|
| Notes |
|
|