Plan Review Details - Permit 21031265
Plan Review Stops For Permit 21031265
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-09-14 Cont ID  
Sent By rmcphers Date 2021-09-14 Time 16:57 Rev Time 0.00
Received By rmcphers Date 2021-09-14 Time 16:57 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-04-06 Cont ID  
Sent By rmcphers Date 2021-04-06 Time 16:12 Rev Time 0.00
Received By rmcphers Date 2021-04-06 Time 16:12 Sent To  
Notes
2021-04-06 16:27:54BASKETBALL POSTS
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) POST ARE SUBJECT TO WIND LOADS - PLEASE PROVIDE THE
 STRUCTURAL CALCULATIONS FROM A DESIGN PROFESSIONAL TO
 COMPLY WITH THE WIND LOADS FBC 1609 - ASCE 7-16
 2) PLEASE SHOW THE WIND DESIGN CRITERIA USED FOR DESIGN
 ON THE DRAWINGS FBC 1603.1.4
 3) DRAWINGS DESIGNED BY AN ARCHITECT OR ENGINEER NEED
 TO BE SIGNED AND SEALED.
  
  
  

Review Stop HIST HISTORICAL
Rev No 1 Status N Date 2021-04-15 Cont ID  
Sent By aaponte Date 2021-04-15 Time 18:54 Rev Time 0.00
Received By aaponte Date 2021-04-15 Time 18:54 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-09-14 Cont ID  
Sent By rmcphers Date 2021-09-14 Time 16:57 Rev Time 0.00
Received By rmcphers Date 2021-08-24 Time 10:51 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-04-16 Cont ID  
Sent By lmarchan Date 2021-04-16 Time 08:45 Rev Time 0.00
Received By lmarchan Date 2021-03-26 Time 13:47 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-09-14 Cont ID  
Sent By rmcphers Date 2021-09-14 Time 16:57 Rev Time 0.00
Received By rmcphers Date 2021-09-14 Time 16:57 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2021-04-06 Cont ID  
Sent By rmcphers Date 2021-04-06 Time 16:28 Rev Time 0.00
Received By rmcphers Date 2021-04-06 Time 16:28 Sent To  
Notes
2021-04-06 16:28:44SEE BUILDING PLAN REVIEW

Review Stop Z ZONING
Rev No 1 Status P Date 2021-04-15 Cont ID  
Sent By aaponte Date 2021-04-15 Time 18:53 Rev Time 0.00
Received By aaponte Date 2021-04-15 Time 18:53 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved