Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-04-21 Cont ID  
Sent By rmcdouga Date 2021-04-21 Time 14:50 Rev Time 0.00
Received By rmcdouga Date 2021-04-21 Time 14:50 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-04-02 Cont ID  
Sent By rmcdouga Date 2021-04-02 Time 14:35 Rev Time 0.00
Received By rmcdouga Date 2021-04-02 Time 14:35 Sent To  
Notes
2021-04-02 14:37:13PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SEVENTH EDITION (2020)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SUBMIT A BOUNDARY SURVEY OF THE PROPERTY. FBC
 AMENDMENTS 107

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-03-29 Cont ID  
Sent By ppetty Date 2021-03-29 Time 11:37 Rev Time 0.00
Received By ppetty Date 2021-03-29 Time 11:14 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-04-21 Cont ID  
Sent By rmcdouga Date 2021-04-21 Time 14:50 Rev Time 0.00
Received By rmcdouga Date 2021-04-19 Time 13:19 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-04-16 Cont ID  
Sent By lmarchan Date 2021-04-16 Time 11:37 Rev Time 0.00
Received By lmarchan Date 2021-03-23 Time 15:40 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2021-04-21 Cont ID  
Sent By lcrespo Date 2021-04-21 Time 08:34 Rev Time 0.00
Received By lcrespo Date 2021-04-21 Time 08:32 Sent To  
Notes
2021-04-21 08:34:4104/21/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING/POOL)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2021-03-25 Cont ID  
Sent By lcrespo Date 2021-03-25 Time 09:37 Rev Time 0.00
Received By lcrespo Date 2021-03-25 Time 09:37 Sent To  
Notes
2021-03-25 09:38:2703/24/21 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE
 MAXIMUM SYSTEM FLOW. THE PUMP'S MAXIMUM FLOW FROM ITS
 PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN
 DETERMINING THE MAXIMUM SYSTEM FLOW RATE PER
 ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013
 EDITION ADDRESSES THE FLOW RATE IN GALLONS PER MINUTE
 (GPM). IT REQUIRES THAT THE MAXIMUM SYSTEM FLOW RATE
 DOES NOT EXCEED THE LISTED MAXIMUM FLOW RATE OF THE
 SUCTION OUTLET FITTING ASSEMBLY (DRAIN COVER). THE TDH
 CALCULATIONS MUST INCLUDE ALL THE SYSTEM COMPONENTS,
 INCLUDING SUCTION AND RETURN PIPING, FITTINGS, VALVES,
 HEATER, FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS
 EXCEPT THE PUMP.
  
 2. PLEASE SUBMIT THE POOL PUMP CURVE. IDENTIFY THE PUMP
 CURVE WHICH CURVE KEY IS SPECIFIC TO THE PUMP BEING
 INSTALLED ON THIS POOL AND SHOW IT IN A BAR GRAPH. THIS
 IS NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE
 TDH CALCULATIONS PER THE ANSI/APSP/ICC 7 - 2013 SECS.
 4.4.9, 4.4.9.1.
  
 3. PLEASE PROVIDE THE MANUFACTURER'S SPECIFICATIONS FOR
 THE PUMP, FILTER AND CHLORINATOR PER THE WPB AMENDMENTS
 TO FBC SEC. 107.2.1.
  
 4. PLEASE SHOW THE POOL PIPING SIZES ON SHEET 002 OF
 THE PLANS PER THE WPB AMENDMENTS TO THE FBC SEC.
 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 5. SIGNED AND SEALED DRAWINGS NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW - OR -
 IF YOUR ENGINEER DOES NOT HAVE AN ELECTRONIC OR DIGITAL
 SIGNATURE - PLEASE DROP OFF (CITY HALL DROPBOX) THE
 ORIGINAL SIGNED AND SEALED DOCUMENT ALONG WITH A "PLAN
 REVIEW REQUEST FORM" EXPLAINING THE REASON FOR
 SUBMITTING THE DOCUMENT OR DRAWINGS. THE PLAN REVIEW
 REQUEST FORM CAN BE OBTAINED BY EMAILING [email protected] AND
 ASKING FOR THE FORM.
  
 WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES.
 A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION,
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-04-02 Cont ID  
Sent By rmcdouga Date 2021-04-02 Time 14:35 Rev Time 0.00
Received By rmcdouga Date 2021-04-02 Time 14:35 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2021-04-16 Cont ID  
Sent By rthermid Date 2021-04-16 Time   Rev Time  
Received By rthermid Date 2021-04-16 Time   Sent To I