| Plan Review Stops For Permit 21030889 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2022-12-19 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-12-19 |
Time |
09:38 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-12-19 |
Time |
09:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2021-06-24 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2021-06-24 |
Time |
10:03 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-06-24 |
Time |
10:03 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2021-04-02 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2021-04-02 |
Time |
14:23 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-04-02 |
Time |
14:23 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2022-12-20 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2022-12-20 |
Time |
13:33 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2022-12-20 |
Time |
13:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2021-06-15 |
|
|
Cont ID |
|
| Sent By |
ppetty |
Date |
2021-06-15 |
Time |
08:50 |
Rev Time |
0.00 |
| Received By |
ppetty |
Date |
2021-06-15 |
Time |
08:49 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2021-03-30 |
|
|
Cont ID |
|
| Sent By |
ppetty |
Date |
2021-03-30 |
Time |
09:23 |
Rev Time |
0.00 |
| Received By |
ppetty |
Date |
2021-03-30 |
Time |
09:12 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2021-03-23 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-03-23 |
Time |
09:57 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-03-23 |
Time |
09:57 |
Sent To |
|
|
| Notes |
| 2021-03-23 09:58:13 | GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN | | | THIS SUBMITTAL PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN | | | PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND PLANS | | | WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE | | | RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT | | | REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER | | | THE WPB AMENDMENTS TO FBC SEC. 107.2.1. | | | | | | A SUB GAS PERMIT IS REQUIRED BY A LICENSED CONTRACTOR | | | FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS TO THE FBC | | | SEC. 105.1. | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2022-12-20 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2022-12-20 |
Time |
13:33 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2022-12-17 |
Time |
19:12 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2022-12-16 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-12-16 |
Time |
14:41 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-12-16 |
Time |
07:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2022-12-08 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2022-12-08 |
Time |
09:42 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2022-12-01 |
Time |
08:27 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2021-06-24 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2021-06-24 |
Time |
10:08 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-06-09 |
Time |
10:20 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2021-04-22 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-04-22 |
Time |
08:46 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-03-22 |
Time |
09:18 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
4 |
Status |
P |
Date |
2022-12-20 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2022-12-20 |
Time |
05:52 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2022-12-05 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2022-12-05 |
Time |
06:29 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2021-06-23 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-06-23 |
Time |
12:39 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-06-23 |
Time |
12:30 |
Sent To |
|
|
| Notes |
| 2021-06-23 12:39:54 | 06/23/21 2 ND PLUMBING REVIEW**DENIED** WITH COMMENTS | | | | | | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS | | | TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE | | | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. | | | | | | 1. PLEASE SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR | | | THE MAXIMUM SYSTEM FLOW. THE PUMP'S MAXIMUM FLOW FROM | | | ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN | | | DETERMINING THE MAXIMUM SYSTEM FLOW RATE PER | | | ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 | | | EDITION ADDRESSES THE FLOW RATE IN GALLONS PER MINUTE | | | (GPM). IT REQUIRES THAT THE MAXIMUM SYSTEM FLOW RATE | | | DOES NOT EXCEED THE LISTED MAXIMUM FLOW RATE OF THE | | | SUCTION OUTLET FITTING ASSEMBLY (DRAIN COVER). THE TDH | | | CALCULATIONS MUST INCLUDE ALL THE SYSTEM COMPONENTS, | | | INCLUDING SUCTION AND RETURN PIPING, FITTINGS, VALVES, | | | HEATER, FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS | | | EXCEPT THE PUMP. | | | | | | 2. SECOND REQUEST; PLEASE SUBMIT THE POOL PUMP CURVE. | | | IDENTIFY THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC TO | | | THE PUMP BEING INSTALLED ON THIS POOL AND SHOW IT IN A | | | BAR GRAPH. THIS IS NEEDED TO CONFIRM THE MAXIMUM SYSTEM | | | FLOW FROM THE TDH CALCULATIONS PER THE ANSI/APSP/ICC 7 | | | - 2013 SECS. 4.4.9, 4.4.9.1. | | | | | | 3. SECOND REQUEST; PLEASE PROVIDE THE MANUFACTURER'S | | | SPECIFICATIONS FOR THE PUMP, FILTER, CHLORINATOR, AND | | | GAS HEATER PER THE WPB AMENDMENTS TO FBC SEC. 107.2.1. | | | | | | 4. SECOND REQUEST; PLEASE PROVIDE DOCUMENTATION THAT | | | THE GAS AND SPA HEATERS SHALL HAVE A MINIMUM THERMAL | | | EFFICIENCY OF 82 % FOR HEATERS MANUFACTURED ON OR AFTER | | | APRIL 16, 2013, WHEN TESTED IN ACCORDANCE WITH ANSI Z | | | 21.56. POOL HEATERS FIRED BY NATURAL OR LP GAS SHALL | | | NOT HAVE CONTINUOUSLY BURNING PILOT LIGHTS PER THE 2017 | | | FBC-ENERGY ? SEC. R403.10.4. | | | | | | 5. A SUB GAS PERMIT IS REQUIRED BY A LICENSED | | | CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS | | | TO THE FBC SEC. 105.1. | | | | | | WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & | | | REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. | | | A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW | | | COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION, | | | MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE | | | THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR | | | PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. | | | | | | HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA | | | | | | LUIS A. CRESPO | | | PLUMBING PLAN EXAMINER / INSPECTOR | | | EMAIL: [email protected] OFFICE: 561 805-6720 | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2021-03-23 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-03-23 |
Time |
09:44 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-03-23 |
Time |
09:43 |
Sent To |
|
|
| Notes |
| 2021-03-23 09:56:06 | 03/23/21 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS | | | | | | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS | | | TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE | | | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. | | | | | | 1. SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE | | | MAXIMUM SYSTEM FLOW. THE PUMP'S MAXIMUM FLOW FROM ITS | | | PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN | | | DETERMINING THE MAXIMUM SYSTEM FLOW RATE PER | | | ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 | | | EDITION ADDRESSES THE FLOW RATE IN GALLONS PER MINUTE | | | (GPM). IT REQUIRES THAT THE MAXIMUM SYSTEM FLOW RATE | | | DOES NOT EXCEED THE LISTED MAXIMUM FLOW RATE OF THE | | | SUCTION OUTLET FITTING ASSEMBLY (DRAIN COVER). THE TDH | | | CALCULATIONS MUST INCLUDE ALL THE SYSTEM COMPONENTS, | | | INCLUDING SUCTION AND RETURN PIPING, FITTINGS, VALVES, | | | HEATER, FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS | | | EXCEPT THE PUMP. | | | | | | 2. PLEASE SUBMIT THE POOL PUMP CURVE. IDENTIFY THE PUMP | | | CURVE WHICH CURVE KEY IS SPECIFIC TO THE PUMP BEING | | | INSTALLED ON THIS POOL AND SHOW IT IN A BAR GRAPH. THIS | | | IS NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE | | | TDH CALCULATIONS PER THE ANSI/APSP/ICC 7 - 2013 SECS. | | | 4.4.9, 4.4.9.1. | | | | | | 3. PLEASE PROVIDE THE MANUFACTURER'S SPECIFICATIONS FOR | | | THE PUMP, FILTER, CHLORINATOR, AND GAS HEATER PER THE | | | WPB AMENDMENTS TO FBC SEC. 107.2.1. | | | | | | 4. PLEASE PROVIDE DOCUMENTATION THAT THE GAS AND SPA | | | HEATERS SHALL HAVE A MINIMUM THERMAL EFFICIENCY OF 82 % | | | FOR HEATERS MANUFACTURED ON OR AFTER APRIL 16, 2013, | | | WHEN TESTED IN ACCORDANCE WITH ANSI Z 21.56. POOL | | | HEATERS FIRED BY NATURAL OR LP GAS SHALL NOT HAVE | | | CONTINUOUSLY BURNING PILOT LIGHTS PER THE 2017 | | | FBC-ENERGY ? SEC. R403.10.4. | | | | | | 5. SIGNED AND SEALED DRAWINGS NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW - OR - | | | IF YOUR ENGINEER DOES NOT HAVE AN ELECTRONIC OR DIGITAL | | | SIGNATURE - PLEASE DROP OFF (CITY HALL DROPBOX) THE | | | ORIGINAL SIGNED AND SEALED DOCUMENT ALONG WITH A "PLAN | | | REVIEW REQUEST FORM" EXPLAINING THE REASON FOR | | | SUBMITTING THE DOCUMENT OR DRAWINGS. THE PLAN REVIEW | | | REQUEST FORM CAN BE OBTAINED BY EMAILING [email protected] AND | | | ASKING FOR THE FORM. | | | | | | 6. A SUB GAS PERMIT IS REQUIRED BY A LICENSED | | | CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS | | | TO THE FBC SEC. 105.1. | | | | | | WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & | | | REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. | | | A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW | | | COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION, | | | MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE | | | THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR | | | PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. | | | | | | HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA | | | | | | LUIS A. CRESPO | | | PLUMBING PLAN EXAMINER / INSPECTOR | | | EMAIL: [email protected] OFFICE: 561 805-6720 | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
5 |
Status |
P |
Date |
2022-12-19 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-12-19 |
Time |
09:33 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-12-19 |
Time |
09:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
F |
Date |
2022-12-16 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-12-16 |
Time |
14:37 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-12-16 |
Time |
14:37 |
Sent To |
|
|
| Notes |
| 2022-12-16 14:38:36 | THE PLANS ARE NOT DIGITALLY SIGNED BY THE ENGINEER. | | | ELECTRONICALLY SUBMITTED DRAWINGS ARE REQUIRED TO HAVE | | | THE ARCHITECT OR ENGINEER'S DIGITAL SIGNATURE ON THEM. | | | NO PHOTOCOPY OR OTHER FACSIMILES OF THE SIGNATURE ARE | | | ACCEPTABLE. FS 481 & FAC 61G1 OR FS 471 & FAC 61G15 | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
F |
Date |
2022-12-08 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2022-12-08 |
Time |
09:35 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2022-12-08 |
Time |
09:29 |
Sent To |
|
|
| Notes |
| 2022-12-08 09:40:32 | 1- DRAWINGS SUBMITTED DON'T HAVE THE SIGNATURE OF THE | | | ENGINEER OF RECORD. PLANS/DOCUMENTS NEED TO HAVE THE | | | ORIGINAL SEAL/SIGNATURE OF THE ENGINEER OF RECORD AS | | | REQUIRED BY SEC. 61G15-23.001 FAC AND CHAPTER 471 F.S. | | | WHEN SUBMITTING PLANS/DOCUMENTS FOR PUBLIC RECORDS. | | | THIS IS AN ELECTRONIC SUBMITTAL. SUBMIT PLANS/DOCUMENTS | | | WITH ENGINEER'S VERIFIABLE DIGITAL SIGNATURE. | | | | | | ENGINEERS | | | 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND | | | SEALING ELECTRONICALLY TRANSMITTED PLANS, | | | SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS. | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2021-06-24 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2021-06-24 |
Time |
10:03 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-06-24 |
Time |
10:03 |
Sent To |
|
|
| Notes |
| 2021-06-24 10:05:05 | THE ELECTRONIC SIGNATURES CAN NOT BE VERIFIED. | | | ELECTRONICALLY SUBMITTED DRAWINGS ARE REQUIRED TO HAVE | | | THE ARCHITECT OR ENGINEER'S DIGITAL SIGNATURE ON THEM. | | | YOU ALSO HAVE THE OPTION TO SUBMIT THE SIGNED AND | | | SEALED PAPER VERSION OF DRAWINGS. AFTER THE ELECTRONIC | | | PLANS HAVE BEEN APPROVED, YOU CAN SUBMIT THE | | | CORRESPONDING PAPER DRAWINGS AT THE BUILDING DEPARTMENT | | | TO BE VERIFIED. THE ARCHITECT OR ENGINEER'S ORIGINAL | | | HANDWRITTEN SIGNATURE AND SEAL IS REQUIRED TO BE ON THE | | | DRAWINGS. NO PHOTOCOPY OR OTHER FACSIMILES OF THE | | | SIGNATURE ARE ACCEPTABLE. FS 481 & 61G1 OR FS 471 & | | | 61G15 | | | | | | NOTE: DRAWING 4 OF 4 WAS NOT WITH THE OTHER DRAWINGS IN | | | THE SIGNATURE FILE. ALSO IF THE DRAWINGS ARE ROTATED OR | | | OTHERWISE CHANGED FROMM THE WAY THEY ARE SENT FROM THE | | | ENGINEER THE ELECTRONIC SIGNATURE WILL BE COMPROMISED. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2021-04-02 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2021-04-02 |
Time |
14:23 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-04-02 |
Time |
14:23 |
Sent To |
|
|
| Notes |
| 2021-04-02 14:24:53 | ELECTRONICALLY SUBMITTED DRAWINGS ARE REQUIRED TO HAVE | | | THE ENGINEER'S DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE | | | THE OPTION TO SUBMIT THE SIGNED AND SEALED PAPER | | | VERSION OF DRAWINGS. AFTER THE ELECTRONIC PLANS HAVE | | | BEEN APPROVED, YOU CAN SUBMIT THE CORRESPONDING PAPER | | | DRAWINGS AT THE BUILDING DEPARTMENT TO BE VERIFIED. THE | | | ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE AND SEAL IS | | | REQUIRED TO BE ON THE DRAWINGS. NO PHOTOCOPY OR OTHER | | | FACSIMILES OF THE SIGNATURE ARE ACCEPTABLE. FS 471 & | | | 61G15 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2021-06-22 |
|
|
Cont ID |
|
| Sent By |
rthermid |
Date |
2021-06-22 |
Time |
|
Rev Time |
0.00 |
| Received By |
rthermid |
Date |
2021-06-22 |
Time |
|
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2021-06-22 |
|
|
Cont ID |
|
| Sent By |
rthermid |
Date |
2021-04-21 |
Time |
|
Rev Time |
|
| Received By |
rthermid |
Date |
2021-04-21 |
Time |
|
Sent To |
I |
|
| Notes |
|
|