| Plan Review Stops For Permit 21030845 |
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
2 |
Status |
P |
Date |
2021-04-13 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-04-13 |
Time |
09:26 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-04-13 |
Time |
09:26 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
1 |
Status |
F |
Date |
2021-03-19 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-03-19 |
Time |
10:11 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-03-19 |
Time |
10:11 |
Sent To |
|
|
| Notes |
| 2021-03-19 10:11:49 | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | | COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE | | | GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS | | | REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE: | | | | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | | RENOVATION.HTML | | | | | | THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO | | | [email protected]. THE INFORMATION SHOULD BE IN | | | PDF FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE | | | INCLUDE THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT | | | LINE. | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2021-06-01 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-05-26 |
Time |
13:54 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-05-26 |
Time |
13:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2021-04-13 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-04-13 |
Time |
09:25 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-04-13 |
Time |
09:01 |
Sent To |
|
|
| Notes |
| 2021-04-13 09:24:52 | COMMERCIAL BUILDING INTERIOR ALT | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected]. | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) PLEASE PROVIDE ROOF TOP AC CURB OR STAND MOUNTING | | | DETAILS TO COMPLY WITH FBC 1510.10 MECHANICAL UNITS. | | | ROOF MOUNTED MECHANICAL UNITS SHALL BE MOUNTED ON CURBS | | | RAISED A MINIMUM OF 8 INCHES (203 MM) ABOVE THE ROOF | | | SURFACE, OR WHERE ROOFING MATERIALS EXTEND BENEATH THE | | | UNIT, ON RAISED EQUIPMENT SUPPORTS PROVIDING A MINIMUM | | | CLEARANCE HEIGHT IN ACCORDANCE WITH TABLE 1510.10. | | | 2) PLEASE PROVIDE A STATEMENT FROM THE ARCHITECT OR | | | ENGINEER TO ADDRESS THE ADDITIONAL WEIGHT OF THE ADDED | | | AC SYSTEM ON THE ROOF - FBC E707.2 ADDITION OR | | | REPLACEMENT OF ROOFING OR REPLACEMENT OF EQUIPMENT. | | | WHERE ADDITION OR REPLACEMENT OF ROOFING OR REPLACEMENT | | | OF EQUIPMENT RESULTS IN ADDITIONAL DEAD LOADS, | | | STRUCTURAL COMPONENTS SUPPORTING SUCH REROOFING OR | | | EQUIPMENT SHALL COMPLY WITH THE GRAVITY LOAD | | | REQUIREMENTS OF THE FLORIDA BUILDING CODE, BUILDING. | | | 3) PLEASE PROVIDE A ROOF PLAN SHOWING THE LOCATION OF | | | THE ADDED MECHANICAL EQUIPMENT AND GUARDS IF REQUIRED | | | FBC 1015.6 MECHANICAL EQUIPMENT, SYSTEMS AND DEVICES. | | | GUARDS SHALL BE PROVIDED WHERE VARIOUS COMPONENTS THAT | | | REQUIRE SERVICE ARE LOCATED WITHIN 10 FEET (3048 MM) OF | | | A ROOF EDGE OR OPEN SIDE OF A WALKING SURFACE AND SUCH | | | EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 INCHES (762 | | | MM) ABOVE THE FLOOR, ROOF OR GRADE BELOW. | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2021-04-16 |
|
|
Cont ID |
|
| Sent By |
equinone |
Date |
2021-04-16 |
Time |
13:39 |
Rev Time |
0.00 |
| Received By |
equinone |
Date |
2021-04-16 |
Time |
13:26 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2021-03-22 |
Time |
|
Rev Time |
0.00 |
| Received By |
cwalker |
Date |
2021-03-22 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2021-06-07 |
Time |
|
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2021-06-03 |
Time |
10:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2021-06-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-06-01 |
Time |
09:59 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-05-20 |
Time |
08:48 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2021-04-19 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-04-19 |
Time |
08:05 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-03-22 |
Time |
09:29 |
Sent To |
|
|
| Notes |
| 2021-03-30 09:30:11 | TO BLDG AUDIT | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2021-03-23 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-03-23 |
Time |
08:22 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2021-03-18 |
Time |
13:56 |
Sent To |
|
|
| Notes |
| 2021-03-19 10:16:17 | ROUTED TO FIRE REVIEW | | | | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2021-05-26 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-05-26 |
Time |
14:00 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-05-26 |
Time |
14:00 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2021-04-19 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-04-19 |
Time |
08:05 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-04-15 |
Time |
14:47 |
Sent To |
|
|
| Notes |
| 2021-04-19 08:05:37 | 1ST REVIEW FBC-2020 MECHANICAL | | | PERMIT-21030845 | | | | | | CODES IN EFFECT: | | | | | | FBC B- FLORIDA BUILDING CODE | | | FBC M- FLORIDA MECHANICAL CODE | | | FBC EC- FLORIDA ENERGY CONSERVATION | | | FBC FG- FLORIDA FUEL GAS | | | FBC EX- FLORIDA EXISTING BUILDING CODE | | | FBC RES- FLORIDA RESIDENTIAL BUILDING CODE | | | FS- FLORIDA STATUTES | | | FAC- FLORIDA ADMINISTRATIVE CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) SHEET A1.0: THE NEW WALK-IN REF. SHOWN ON THIS SHEET | | | SHALL REQUIRE A SEPARATE SUBMITTAL WITH A PERMIT AND | | | REVIEW. PLEASE PROVIDE A STATEMENT ON THE PLANS | | | REFLECTING THIS. | | | | | | 2) SHEET M2.0: PLEASE PROVIDE THE OUTDOOR AIR | | | CALCULATIONS BASED ON THE 2020 FBC M SECTION 403.3.1.1 | | | AND TABLE 403.3.1.1. PLEASE USE THESE TWO SECTIONS TO | | | CALCULATE THE REQUIRED OUTDOOR AIR FOR THE USE OF THIS | | | SPACE, NOT THE ARCHITECT OCCUPANT COUNT. (EXAMPLE) THE | | | FLORIST AREA APPEARS TO BE A SALES AREA. THIS WOULD BE | | | FIGURED BY USING THE (RETAIL STORES, SALES FLOORS AND | | | SHOWROOM FLOORS). | | | | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM. | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
N |
Date |
2021-04-16 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2021-04-16 |
Time |
13:48 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2021-04-16 |
Time |
13:24 |
Sent To |
|
|
| Notes |
| 2021-04-16 13:49:14 | ALL PLUMBING FIXTURES AND TOILET ROOMS ARE SHOWN AS | | | EXISTING. NO NEW PLUMBING WORK IS SHOWN. |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
3 |
Status |
P |
Date |
2021-06-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-06-01 |
Time |
09:59 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-06-01 |
Time |
09:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
2 |
Status |
F |
Date |
2021-03-19 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-03-19 |
Time |
10:12 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-03-19 |
Time |
10:12 |
Sent To |
|
|
| Notes |
| 2021-03-19 10:15:56 | NOTICE TO BUILDING OFFICIAL FOR PLAN REVIEW AND | | | INSPECTIONS RECEIVED | | | AFFIDAVIT RECEIVED, WILL NEED NEW AFFIDAVIT IF PLANS | | | CHANGE | | | |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
1 |
Status |
F |
Date |
2021-03-18 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-03-18 |
Time |
14:07 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-03-18 |
Time |
14:07 |
Sent To |
|
|
| Notes |
| 2021-03-18 14:18:34 | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | FS553, USE OF PRIVATE PROVIDER IS NOT CLEAR. A PLAN | | | REVIEW AFFIDAVIT AND PLANS STAMPED REVIEWED BY PRIVATE | | | PROVIDER WERE SUBMITTED, BUT THE NOTICE TO BUILDING | | | OFFICIAL IS FOR INSPECTIONS ONLY. | | | | | | EITHER CONFIRM THAT THIS IS INSPECTIONS ONLY AND | | | REQUEST THAT THE PLAN REVIEW AFFIDAVIT BE REMOVED FROM | | | THE RECORD, OR SUBMIT A NOTICE TO BUILDING OFFICIAL FOR | | | PLAN REVIEW AND INSPECTIONS. | | | | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2021-06-07 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2021-06-07 |
Time |
12:38 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2021-06-07 |
Time |
12:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2021-05-26 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-05-26 |
Time |
14:09 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-05-26 |
Time |
14:09 |
Sent To |
|
|
| Notes |
| 2021-05-26 14:10:20 | INTERIOR RENOVATION | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) DRAWINGS ADDED TO PROJECTDOX ON 5/19/2021 NEED TO BE | | | SIGNED AND SEALED BY THE DESIGNER. (DRAWING A1.0 AND | | | CURB DETAIL 1 AND 2) FBC 107.1 | | | DRAWINGS ADDED TO PROJECTDOX ON 5/19/2021 = SIGNED AND | | | SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. | | | DRAWINGS DO NOT SHOW IN "ADOBE READER" AS | | | DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR | | | ARCHITECT OR ENGINEER DOES NOT HAVE AN ELECTRONIC OR | | | DIGITAL SIGNATURE - YOU CAN MAIL IN OR DROP OFF THE | | | ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS TO THE | | | FRONT DESK IN THE BUILDING DEPT. AT THE CITY HALL |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2021-03-29 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-03-18 |
Time |
13:11 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-03-18 |
Time |
12:52 |
Sent To |
|
|
| Notes |
|
|