Plan Review Stops For Permit 21030502
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status P Date 2021-06-11 Cont ID  
Sent By shill Date 2021-06-11 Time 21:14 Rev Time 0.00
Received By shill Date 2021-06-11 Time 21:14 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2021-04-12 Cont ID  
Sent By rmcphers Date 2021-04-12 Time 10:43 Rev Time 0.00
Received By rmcphers Date 2021-04-12 Time 10:43 Sent To  
Notes
2021-04-12 10:44:36PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-06-11 Cont ID  
Sent By shill Date 2021-06-11 Time 21:13 Rev Time 0.00
Received By shill Date 2021-06-11 Time 21:13 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-04-12 Cont ID  
Sent By rmcphers Date 2021-04-12 Time 10:42 Rev Time 0.00
Received By rmcphers Date 2021-04-12 Time 10:16 Sent To  
Notes
2021-04-12 10:33:19OFFICE BUILDOUT
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) PLEASE SHOW THE RESTROOM MIRROR HEIGHT (TO THE
 REFLECTIVE SURFACE) TO COMPLY WITH FBC A603.3 MIRRORS.
 MIRRORS LOCATED ABOVE LAVATORIES OR COUNTERTOPS SHALL
 BE INSTALLED WITH THE BOTTOM EDGE OF THE REFLECTING
 SURFACE 40 INCHES (1015 MM) MAXIMUM ABOVE THE FINISH
 FLOOR OR GROUND.
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-04-12 Cont ID  
Sent By jleahy Date 2021-04-12 Time 11:32 Rev Time 0.00
Received By jleahy Date 2021-04-09 Time 16:39 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2021-05-12 Cont ID  
Sent By pleduc Date 2021-05-12 Time   Rev Time 0.00
Received By pleduc Date 2021-05-12 Time 15:23 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2021-03-19 Cont ID  
Sent By pleduc Date 2021-03-19 Time   Rev Time 0.00
Received By pleduc Date 2021-03-19 Time 12:07 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-06-11 Cont ID  
Sent By shill Date 2021-06-11 Time 21:15 Rev Time 0.00
Received By shill Date 2021-05-11 Time 07:01 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-04-20 Cont ID  
Sent By jesmith Date 2021-04-20 Time 15:40 Rev Time 0.00
Received By jesmith Date 2021-04-20 Time 15:40 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status N Date 2021-04-12 Cont ID  
Sent By rmcphers Date 2021-04-12 Time 10:44 Rev Time 0.00
Received By rmcphers Date 2021-04-12 Time 10:44 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2021-05-25 Cont ID  
Sent By medwards Date 2021-05-25 Time 12:12 Rev Time 0.00
Received By medwards Date 2021-05-25 Time 12:12 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2021-04-15 Cont ID  
Sent By medwards Date 2021-04-15 Time 11:47 Rev Time 0.00
Received By medwards Date 2021-04-15 Time 11:30 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2021-05-17 Cont ID  
Sent By jesmith Date 2021-05-17 Time 13:42 Rev Time 0.00
Received By jesmith Date 2021-05-13 Time 10:42 Sent To  
Notes
2021-05-17 13:42:36PLUMBING COMMENTS: APPROVED
  
 ALL WORK PER STATE AND CITY CODES SUBJECT TO FIELD
 INSPECTOR'S APPROVAL
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 PROJECT SUBMITTAL FOR WATER HEATER REVIEWED AND
 APPROVED BY ENGINEER OF RECORD SHALL BE ON SITE PRIOR
 TO FINAL INSPECTION
  
 PROJECT SUBMITTAL FOR RECIRCULATING PUMP REVIEWED AND
 APPROVED BY ENGINEER OF RECORD SHALL BE ON SITE PRIOR
 TO FINAL INSPECTION
  
  
 21030502 1411 N FLAGLER DR # 6700

Review Stop P PLUMBING
Rev No 1 Status F Date 2021-04-20 Cont ID  
Sent By jesmith Date 2021-04-20 Time 14:59 Rev Time 0.00
Received By jesmith Date 2021-04-20 Time 12:46 Sent To  
Notes
2021-04-20 14:59:25CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2020 7TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1
 WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL
 MANUAL REVISED 2017
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020
 7TH EDITION
 FBC RES = FLORIDA RESIDENTIAL CODE 2020 7TH EDITION
 FBC ACC = FLORIDA ACCESSIBILITY CODE 2020 7TH EDITION
 FBC EX = FLORIDA EXISTING BUILDING CODE 2020 7TH
 EDITION
 FBC PL = FLORIDA PLUMBING CODE 2020 7TH EDITION
 FAC= FLORIDA ADMINISTRATIVE CODE
 FS = FLORIDA STATUTES
  
 1ST REVIEW
 PLUMBING COMMENTS: DENIED
  
 A REVIEW OF MINIMUM PLUMBING FIXTURE REQUIREMENTS AS
 REQUIRED BY FBC ACC IS PART OF THE PLUMBING REVIEW
 PROCESS BUT IS TYPICALLY ADDRESSED ON THE ARCHITECTURAL
 PLANS. ANY COMMENTS CONCERNING THESE REQUIREMENTS MUST
 BE SATISFACTORILY ADDRESSED PRIOR TO A PLUMBING REVIEW
 APPROVAL.
  
 1.RE: A3-01/DETAIL 6/ELEVATION C; PLEASE SHOW THE
 RESTROOM MIRROR HEIGHT (TO THE REFLECTIVE SURFACE) TO
 COMPLY WITH FBC ACC 604.3.
  
 2.WATER HEATER DETAIL; THE EXPANSION TANK SHALL BE
 DOWNSTREAM OF THE CHECK VALVE TO COMPLY WITH FBC PL
 607.3.
  
 3.PER WPB FBC 107.2.1, PROVIDE MANUFACTURER'S
 SPECIFICATION/INSTALLATION MANUAL FOR THE SPECIFIED
 LOCHINVAR ESWO50PD WATER HEATER. ADDITIONALLY, IF THE
 UNIT SPECIFIED IS BOTTOM FED, MODIFY THE WATER HEATER
 DETAIL TO BE IN COMPLIANCE WITH FBC PL SECTION 504.2.
  
 4.P0.1 WATER HEATER DETAIL INDICATES T & P DISCHARGE
 INDIRECT TO HEATER PAN WITH 6 INCH AIR GAP, THEN PAN
 DRAIN DISCHARGE TO BUILDING EXTERIOR OR TO NEAREST
 APPROVED INDIRECT WASTE. PER WPB FBC 107.2.1, CLARIFY;
 BE SPECIFIC AS TO THE HOW THE T&P DISCHARGE AND PAN
 DRAIN ARE TO BE DEALT WITH.
  
 5.REGARDING THE HOT WATER LOOP SERVICING THE NEW TWO
 NEW ACCESSIBLE BATHROOM LAVATORIES (L-1), BREAK ROOM
 SINK (S-1) AND THE EIGHT NEW EXAM ROOM SINKS (SK-2),
 NOTE THAT PER FBC PL 606.1 (5), EACH DOWN FEED PIPE IS
 REQUIRED TO HAVE A FULL SIZE VALVE. BY RUNNING THE LOOP
 THROUGH THE POINT OF FIXTURE OUTLET AS IS SHOWN ON THE
 RISER DIAGRAM, THIS CANNOT BE ACCOMPLISHED. PROVIDE
 INDIVIDUALLY VALVED DOWN FEED HOT WATER PIPES TO EACH
 OF THE FIXTURES FED BY THE LOOP.
  
  
 6.RE: P0.1; PLUMBING NOTE 26. PER WPB FBC 107.2.1,
 CLARIFY; BE SPECIFIC. REMOVE THE WORDS "OR EQUAL" AND
 SPECIFY THE THICKNESS FOR EACH OF THE APPLICATIONS
 NOTED AND SPECIFY THE VAPOR BARRIER TO BE APPLIED.
  
 7. RE: P0.1; DETAIL FOR TEMPERED AND COLD WATER SUPPLY
 CONNECTIONS FOR PUBLIC LAVATORIES. SPECIFIED 1070
 COMPLIANT VALVE IS A POINT OF USE VALVE AS 1070
 COMPLIANT VALVES TYPICALLY ARE. PER WPB FBC 107.2.1,
 REMOVE COMMENT "NOTE: ONE VALVE CAN SUPPLY A BATTERY OF
 UP TO FIVE (5) PUBLIC LAVATORIES".
  
 8. PER WPB FBC 107.2.1, PROVIDE MANUFACTURER'S
 SPECIFICATION/INSTALLATION MANUAL FOR THE SPECIFIED
 RECIRCULATING PUMP.
  
 9. PER WPB FBC 107.2.1, CORRECTLY IDENTIFY THE EWC-1 ON
 THE SANITARY RISER DIAGRAM; NOW NOTED AS SK-2.
  
 10. PER WPB FBC 107.2.1, CORRECTLY IDENTIFY L-1 IN THE
 STAFF TOILET ROOM ON THE SANITARY AND THE WATER RISER
 DIAGRAMS; NOW NOTED AS SK-1.
  
 END OF COMMENTS.
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO THE SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS. ALL PLANS TO BE SIGNED
 AND SEALED BY THE DESIGNER AS REQUIRED BY FAC AND FS.
  
 JERALD SMITH
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
 EMAIL [email protected]
 MOBILE 561-246-0882
 PLEASE NOTE THAT I TYPICALLY WORK ON TUESDAYS AND
 THURSDAYS
  
 21030502 1411 N FLAGLER DR # 6700
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-06-11 Cont ID  
Sent By shill Date 2021-06-11 Time 21:14 Rev Time 0.00
Received By shill Date 2021-06-11 Time 21:14 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2021-04-12 Cont ID  
Sent By rmcphers Date 2021-04-12 Time 10:41 Rev Time 0.00
Received By rmcphers Date 2021-04-12 Time 10:41 Sent To  
Notes
2021-04-12 10:42:42DRAWING LABELED ( 016 FA-1.PDF ) IN PROJECTDOX = SIGNED
 AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW.
 DRAWINGS DO NOT SHOW IN "ADOBE READER" AS
 DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR
 ARCHITECT OR ENGINEER DOES NOT HAVE AN ELECTRONIC OR
 DIGITAL SIGNATURE - YOU CAN MAIL IN OR DROP OFF THE
 ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS TO THE
 FRONT DESK IN THE BUILDING DEPT. AT THE CITY HALL


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved