| Plan Review Stops For Permit 21030155 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2021-05-07 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-05-07 |
Time |
07:37 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-05-07 |
Time |
07:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2021-04-30 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-04-30 |
Time |
13:50 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-04-30 |
Time |
13:47 |
Sent To |
|
|
| Notes |
| 2021-04-30 13:50:16 | FLAG POLE | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected]. | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) DRAWINGS SHOW A 25' FLAG POLE - THE PERMIT | | | APPLICATION STATES A 35' FLAG POLE - THEY NEED TO | | | MATCH. | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2021-03-26 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-03-26 |
Time |
11:26 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-03-26 |
Time |
11:19 |
Sent To |
|
|
| Notes |
| 2021-03-26 11:26:39 | FLAG POLE | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) PLEASE PROVIDE A SITE PLAN/SURVEY SHOWING THE | | | LOCATION OF THE FLAG POLE - WITH DIMENSIONS FROM THE | | | BUILDING, PROPERTY LINES ETC.. | | | 2) FLAG POLE IS SUBJECT TO WIND LOADS.FBC 1609 PLEASE | | | PROVIDE SIGNED AND SEALED DETAILS SHOWING THE | | | FOUNDATION AND POLE ATTACHMENT REQUIREMENTS FROM A | | | DESIGN PROFESSIONAL. | | | 3) PLEASE SHOW THE WIND DESIGN DATA USED FOR DESIGN PER | | | FBC 1603.1.4 | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2021-05-18 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2021-05-18 |
Time |
16:18 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2021-04-19 |
Time |
12:41 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2021-04-01 |
|
|
Cont ID |
|
| Sent By |
equinone |
Date |
2021-04-01 |
Time |
09:32 |
Rev Time |
0.00 |
| Received By |
equinone |
Date |
2021-03-04 |
Time |
15:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
P |
Date |
2021-05-27 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2021-05-27 |
Time |
10:04 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2021-05-27 |
Time |
09:31 |
Sent To |
|
|
| Notes |
| 2021-05-27 10:06:10 | FLAG POLE ENGINEERING WITH ENGINEER'S ORIGINAL | | | SEAL/SIGNATURE MATCHES APPROVED ONE. JG. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2021-05-27 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2021-05-26 |
Time |
12:52 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2021-05-26 |
Time |
12:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2021-04-30 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-04-30 |
Time |
13:50 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-04-30 |
Time |
13:50 |
Sent To |
|
|
| Notes |
| 2021-04-30 13:51:36 | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. | | | DRAWINGS DO NOT SHOW IN "ADOBE READER" AS | | | DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR | | | ARCHITECT OR ENGINEER DOES NOT HAVE AN ELECTRONIC OR | | | DIGITAL SIGNATURE - YOU CAN MAIL IN OR DROP OFF THE | | | ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS TO THE | | | FRONT DESK IN THE BUILDING DEPT. AT THE CITY HALL |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2021-03-26 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-03-26 |
Time |
11:27 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-03-26 |
Time |
11:27 |
Sent To |
|
|
| Notes |
| 2021-03-26 11:27:48 | SEE BUILDING PLAN REVIEW |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2021-05-18 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
2021-05-18 |
Time |
14:54 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
2021-05-18 |
Time |
14:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2021-03-31 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
2021-03-31 |
Time |
09:21 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
2021-03-31 |
Time |
09:21 |
Sent To |
|
|
| Notes |
| 2021-03-31 09:32:51 | 1. PLEASE PROVIDE A SITE PLAN AND SURVEY INDICATING THE | | | LOCATION OF THE FLAG POLE. | | | 2. POLE SHALL BE NOT BE LOCATED WITHIN THE SETBACKS. | | | FOR THIS DISTRICT THE MINIMUM SETBACKS ARE 24 FEET FROM | | | FALGLER DRIVE AS MEASURED FROM BACK OF EXISTING CURB; | | | AND 20 FEET FROM THE WATER FACE OF THE SEAWALL CAP. | | | FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA | | | APONTE AT 561-822-1439. |
|
|