| 2021-04-29 15:23:14 | CODES IN EFFECT: |
| | FBC = FLORIDA BUILDING CODE 2020 7TH EDITION |
| | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 |
| | 6TH ED, CHAPTER 1 |
| | WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL |
| | MANUAL REVISED 2017 |
| | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 |
| | 7TH EDITION |
| | FBC ACC = FLORIDA ACCESSIBILITY CODE 2020 7TH EDITION |
| | FBC EX = FLORIDA EXISTING BUILDING CODE 2020 7TH |
| | EDITION |
| | FBC PL = FLORIDA PLUMBING CODE 2020 7TH EDITION |
| | FBC FG = FLORIDA FUEL GAS CODE 2020 7TH EDITION |
| | FAC= FLORIDA ADMINISTRATIVE CODE |
| | FS = FLORIDA STATUTES |
| | |
| | 1ST REVIEW |
| | PLUMBING COMMENTS: DENIED |
| | A REVIEW OF MINIMUM PLUMBING FIXTURE REQUIREMENTS AS |
| | REQUIRED BY FBC ACC IS PART OF THE PLUMBING REVIEW |
| | PROCESS BUT IS TYPICALLY ADDRESSED ON THE ARCHITECTURAL |
| | PLANS. ANY COMMENTS CONCERNING THESE REQUIREMENTS MUST |
| | BE SATISFACTORILY ADDRESSED PRIOR TO A PLUMBING REVIEW |
| | APPROVAL. |
| | |
| | 1.RE: CS-COVER PAGE: CODE ANALYSIS/BUILDING CODES. |
| | COMPLIANCE WITH THE FLORIDA BUILDING CODE, PLUMBING |
| | 2020 AND FLORIDA BUILDING CODE, ACCESSIBILITY 2020 IS |
| | REQUIRED. PER WPB FBC 107.2.1, NOTE IN CS-COVER PAGE: |
| | CODE ANALYSIS/BUILDING CODES. |
| | |
| | 2.A4.1 GRAB & GO COFFEE BAR: THE BUILDING IS CLASSIFIED |
| | R2, SEEMS TO CONFORM TO FBC PL TABLE 403.1/RESIDENTIAL/ |
| | APARTMENT HOUSE. THE RETAIL FOOD SPACE, GRAB & GO |
| | COFFEE BAR SHOULD BE CLASSIFIED MERCANTILE. PER WPB FBC |
| | 107.2.1, CLARIFY. |
| | |
| | 3.A4.1 GRAB & GO COFFEE BAR: PER WPB FBC 107.2.1, |
| | PROVIDE FINISH WALL SCHEDULE FOR THE COFFEE SHOP |
| | RESTROOM AND REVISE ADA BATHROOM DETAILS 5 AND 6 ON |
| | A4.1 TO COMPLY WITH FBC PL 310.3 AND FBC 1210.2.2. |
| | WALLS AND PARTITIONS WITHIN 2 FEET (610 MM) OF SERVICE |
| | SINKS, URINALS AND WATER CLOSETS SHALL HAVE A SMOOTH, |
| | HARD, NONABSORBENT SURFACE, TO A HEIGHT OF NOT LESS |
| | THAN 4 FEET (1219 MM) ABOVE THE FLOOR, AND EXCEPT FOR |
| | STRUCTURAL ELEMENTS, THE MATERIALS USED IN SUCH WALLS |
| | SHALL BE OF A TYPE THAT IS NOT ADVERSELY AFFECTED BY |
| | MOISTURE. PLEASE NOTE THAT FBC 1210.2.2 STIPULATES THAT |
| | THE MATERIAL BE "HARD." THE INTENT OF THIS SECTION IS |
| | THAT THE SURROUNDING MATERIAL SHOULD NOT BE OF A TYPE |
| | THAT IS EASILY DAMAGED SUCH THAT THE MATERIAL COULD |
| | BECOME ABSORBENT AND THUS, NOT READILY CLEANABLE AND |
| | SANITIZED. PAINTED DRYWALL, EVEN WHERE COATED WITH |
| | HIGHLY DURABLE PAINTS, DOES NOT MEET THE INTENT OF |
| | SECTION 1210.2.2. THE TYPICAL MATERIALS USED FOR THIS |
| | APPLICATION ARE CERAMIC TILE, FIBERGLASS REINFORCED |
| | PLASTIC (FRP) PANELS, PHENOLIC PANELS, LAMINATED |
| | PLASTIC PANELS, PAINTED STEEL AND STAINLESS STEEL. |
| | |
| | 4. GRAB & GO COFFEE BAR: A THREE COMPARTMENT SINK IS |
| | SHOWN ON ARCHITECTURAL AND PLUMBING FLOOR PLANS BUT IS |
| | NOT NOTED ON THE PLUMBING FIXTURE SCHEDULE. PER WPB FBC |
| | 107.2.1, NOTE ON SCHEDULE AND IDENTIFY ON WATER AND |
| | SANITARY RISER DIAGRAMS. |
| | |
| | 5. FIXTURES P-1H AND P-2H ARE NOTED ON THE PLUMBING |
| | PLANS BUT NOT ON THE PLUMBING FIXTURE CONNECTION |
| | SCHEDULE. PER WPB FBC 107.2.1, CLARIFY. |
| | |
| | 6. A4.1: THERE IS A MOP SINK LOCATED IN THE GRAB & GO |
| | COFFEE BAR TOILET ROOM. NOTHING IS SHOWN IN THE |
| | PLUMBING FIXTURE CONNECTION SCHEDULE AND THERE IS NO |
| | PIPING SHOWN FOR WATER AND SANITARY. PER WPB FBC |
| | 107.2.1, CLARIFY. A MANUFACTURER'S SPECIFICATION IS |
| | REQUIRED FOR SINK AND FAUCET. |
| | |
| | 7. A4.1: COMPLIANCE WITH FLORIDA BUILDING CODE, |
| | ACCESSIBILITY 2020 IS REQUIRED. ADAAG IS NOT APPLICABLE |
| | TO THIS SPACE. PER WPB FBC 107.2.1, TO SHOW COMPLIANCE |
| | WITH FBC ACC CHAPTERS 2, 3 AND 6 AND PROVIDE ON THE |
| | PLAN AND ELEVATION DETAILS FOR NEW TOILET ROOM |
| | INDICATING THE FOLLOWING: |
| | . A. THE WATER CLOSET SHALL BE POSITIONED WITH A WALL |
| | OR PARTITION TO THE REAR AND TO ONE SIDE. THE |
| | CENTERLINE OF THE WATER CLOSET SHALL BE 16 INCHES |
| | MINIMUM TO 18 INCHES MAXIMUM FROM THE SIDE WALL OR |
| | PARTITION PER FBC ACC 604.2 |
| | . B. CLEARANCE AROUND A WATER CLOSET SHALL BE 60 INCHES |
| | MINIMUM MEASURED PERPENDICULAR FROM THE SIDE WALL AND |
| | 56 INCHES MINIMUM MEASURED PERPENDICULAR FROM THE REAR |
| | WALL PER FBC ACC 604.3.1 |
| | . C. THE SIDE WALL GRAB BAR SHALL BE 42 INCHES LONG |
| | MINIMUM, LOCATED 12 INCHES (305 MM) MAXIMUM FROM THE |
| | REAR WALL AND EXTENDING 54 INCHES MINIMUM FROM THE REAR |
| | WALL PER FBC ACC 604.5.1 |
| | . D. THE REAR WALL GRAB BAR SHALL BE 36 INCHES LONG |
| | MINIMUM AND EXTEND FROM THE CENTERLINE OF THE WATER |
| | CLOSET 12 INCHES MINIMUM ON ONE SIDE AND 24 INCHES |
| | MINIMUM ON THE OTHER SIDE PER FBC ACC 604.5.2 |
| | . E. FLUSH CONTROLS SHALL BE HAND OPERATED OR |
| | AUTOMATIC. HAND OPERATED FLUSH CONTROLS SHALL COMPLY |
| | WITH 309. FLUSH CONTROLS SHALL BE LOCATED ON THE OPEN |
| | SIDE OF THE WATER CLOSET PER FBC ACC 604.6 |
| | . F. TOILET PAPER DISPENSERS SHALL COMPLY WITH 309.4 |
| | AND SHALL BE 7 INCHES MINIMUM AND 9 INCHES MAXIMUM IN |
| | FRONT OF THE WATER CLOSET MEASURED TO THE CENTERLINE OF |
| | THE DISPENSER. THE OUTLET OF THE DISPENSER SHALL BE 15 |
| | INCHES MINIMUM AND 48 INCHES MAXIMUM ABOVE THE FINISH |
| | FLOOR AND SHALL NOT BE LOCATED BEHIND GRAB BARS PER FBC |
| | ACC 604.8. |
| | . G. THE SEAT HEIGHT OF A WATER CLOSET ABOVE THE FINISH |
| | FLOOR SHALL BE 17 INCHES (430 MM) MINIMUM AND 19 INCHES |
| | (485 MM) MAXIMUM MEASURED TO THE TOP OF THE SEAT. SEATS |
| | SHALL NOT BE SPRUNG TO RETURN TO A LIFTED POSITION PER |
| | FBC ACC 604.4. |
| | . H. PER FBC ACC 609.4, GRAB BARS SHALL BE INSTALLED IN |
| | A HORIZONTAL POSITION, 33 INCHES MINIMUM AND 36 INCHES |
| | MAXIMUM ABOVE THE FINISH FLOOR MEASURED TO THE TOP (NOT |
| | THE CENTER) OF THE GRIPPING SURFACE. |
| | . I. LAVATORIES AND SINKS SHALL BE INSTALLED WITH THE |
| | FRONT OF THE HIGHER OF THE RIM OR COUNTER SURFACE 34 |
| | INCHES MAXIMUM ABOVE THE FINISH FLOOR OR GROUND PER FBC |
| | ACC 606.3, ADDITIONALLY SHOW TOE AND KNEE CLEARANCE AS |
| | REQUIRED BY FBC ACC 306.2 AND 306.3 |
| | . J. SHOW TURNING SPACE COMPLYING WITH FBC ACC 304.3.1 |
| | OR 304.3.2. |
| | . K. PER FBC 606.5 EXPOSED PIPES AND SURFACES. WATER |
| | SUPPLY & DRAINPIPES UNDER LAVATORIES AND SINKS SHALL BE |
| | INSULATED OR OTHERWISE CONFIGURED TO PROTECT AGAINST |
| | CONTACT. |
| | . L. UNITS SHALL HAVE A CLEAR FLOOR OR GROUND SPACE |
| | COMPLYING WITH 305 POSITIONED FOR A FORWARD APPROACH |
| | AND CENTERED ON THE UNIT. KNEE AND TOE CLEARANCE |
| | COMPLYING WITH 306 SHALL BE PROVIDED PER FBC ACC 602.2. |
| | . M. MIRRORS LOCATED ABOVE LAVATORIES OR COUNTERTOPS |
| | SHALL BE INSTALLED WITH THE BOTTOM EDGE OF THE |
| | REFLECTING SURFACE40 INCHES (1015 MM) MAXIMUM ABOVE THE |
| | FINISH FLOOR OR GROUND. MIRRORS NOT LOCATED ABOVE |
| | LAVATORIES OR COUNTERTOPS SHALL BE INSTALLED WITH THE |
| | BOTTOM EDGE OF THE REFLECTING SURFACE 35 INCHES (890 |
| | MM) MAXIMUM ABOVE THE FINISH FLOOR OR GROUND PER FBC |
| | ACC 603.3. |
| | |
| | 8. A4.1: REGARDING THE THREE-COMPARTMENT SINK, PLEASE |
| | NOTE WHERE SINKS ARE PROVIDED, AT LEAST 5 PERCENT, BUT |
| | NO FEWER THAN ONE, OF EACH TYPE PROVIDED IN EACH |
| | ACCESSIBLE ROOM OR SPACE SHALL COMPLY WITH 606 PER FBC |
| | ACC 212.3. PER WPB FBC 107.2.1, PROVIDE ON DETAIL 9, |
| | THE REQUIRED DIMENSIONS TO SHOW COMPLIANCE WITH FBC ACC |
| | 606.3. |
| | |
| | 9. PER WPB FBC 107.2.1, TO SHOW COMPLIANCE WITH FBC ACC |
| | 611.4, PROVIDE DETAIL FOR ACCESSIBLE CLOTHES WASHER. |
| | TOP LOADING MACHINES SHALL HAVE THE DOOR TO THE LAUNDRY |
| | COMPARTMENT LOCATED 36 INCHES (915 MM) MAXIMUM ABOVE |
| | THE FINISH FLOOR. FRONT LOADING MACHINES SHALL HAVE THE |
| | BOTTOM OF THE OPENING TO THE LAUNDRY COMPARTMENT |
| | LOCATED 15 INCHES (380 MM) MINIMUM AND 36 INCHES (915 |
| | MM) MAXIMUM ABOVE THE FINISH FLOOR. |
| | |
| | 10.PER WPB FBC 107.2.1, PROVIDE DETAILS OF UL |
| | ASSEMBLIES FOR HORIZONTAL AND VERTICAL PIPE |
| | PENETRATIONS IN FIRE RATED STRUCTURES. ASSEMBLIES SHALL |
| | BE APPLICABLE TO THE SPECIFIED PIPESIZES, MATERIALS AND |
| | AFFECTED STRUCTURES. COMPLY WITH FBC CHAPTER 7. |
| | |
| | 11.P3.1 PLUMBING FIXTURE CONNECTION SCHEDULE |
| | . A. REVISE NOTE 1 TO STATE "PER FBC PL 412.3, |
| | INDIVIDUAL SHOWER AND TUB-SHOWER COMBINATION VALVES |
| | SHALL BE BALANCED-PRESSURE, THERMOSTATIC OR COMBINATION |
| | BALANCED-PRESSURE/THERMOSTATIC VALVES THAT CONFORM TO |
| | THE REQUIREMENTS OF ASSE 1016/ASME A112.1016/CSA |
| | B125.16 OR ASME A112.18.1/CSA B125.1 AND SHALL BE |
| | INSTALLED AT THE POINT OF USE. THEY SHALL BE EQUIPPED |
| | WITH A MEANS TO LIMIT THE MAXIMUM SETTING OF THE VALVE |
| | TO 120F (49C), WHICH SHALL BE FIELD ADJUSTED IN |
| | ACCORDANCE WITH THE MANUFACTURER?S INSTRUCTIONS. |
| | IN-LINE THERMOSTATIC VALVES SHALL NOT BE UTILIZED FOR |
| | COMPLIANCE WITH THIS SECTION." |
| | . B. NOTE 4 PERTAINS TO BIDET, NONE SHOWN IN SCHEDULE. |
| | PER WPB FBC 107.2.1, CLARIFY. ADDITIONALLY, DELETE ANY |
| | REFERENCE TO THE FBC RES CODE AS THIS PROJECT IS |
| | REQUIRED TO COMPLY WITH THE FLORIDA BUILDING CODE, |
| | PLUMBING 2020. |
| | . C. GRAB & GO COFFEE BAR: A THREE COMPARTMENT SINK IS |
| | SHOWN ON ARCHITECTURAL AND PLUMBING FLOOR PLANS BUT IS |
| | NOT NOTED ON THE PLUMBING FIXTURE SCHEDULE. PER WPB FBC |
| | 107.2.1, NOTE ON SCHEDULE AND IDENTIFY ON WATER AND |
| | SANITARY RISER DIAGRAMS. |
| | . E. FIXTURES P-1H AND P-2H ARE NOTED ON THE PLUMBING |
| | PLANS BUT NOT ON THE PLUMBING FIXTURE CONNECTION |
| | SCHEDULE. PER WPB FBC 107.2.1, CLARIFY. |
| | . F. THERE IS A MOP SINK LOCATED IN THE GRAB & GO |
| | COFFEE BAR TOILET ROOM. NOTHING IS SHOWN IN THE |
| | PLUMBING FIXTURE CONNECTION SCHEDULE AND THERE IS NO |
| | PIPING SHOWN FOR WATER AND SANITARY. PER WPB FBC |
| | 107.2.1, CLARIFY. A MANUFACTURER'S SPECIFICATION IS |
| | REQUIRED FOR SINK AND FAUCET. |
| | . G. PROVIDE MANUFACTURER'S SPECIFICATION FOR ALL |
| | SCHEDULED PLUMBING FIXTURES. |
| | |
| | 12. GRAB & GO COFFEE BAR: PER FBC PL 419.5, COLD OR |
| | TEMPERED WATER SHALL BE DELIVERED FROM LAVATORIES AND |
| | GROUP WASH FIXTURES LOCATED IN PUBLIC TOILET FACILITIES |
| | PROVIDED FOR CUSTOMERS, PATRONS AND VISITORS. TEMPERED |
| | WATER SHALL BE DELIVERED THROUGH AN APPROVED |
| | WATER-TEMPERATURE LIMITING DEVICE THAT CONFORMS TO ASSE |
| | 1070 OR CSA B125.3. SHOULD TEMPERED WATER BE PROVIDED, |
| | THEN PER WPB FBC 107.2.1, PROVIDE A SPECIFICATION AND A |
| | DETAIL. |
| | |
| | 13. DOMESTIC WATER MATERIAL SPECIFICATION CALLS FOR |
| | TYPE L COPPER WITH SWEAT FITTINGS AND NOTES THAT CPVC |
| | WILL BE ACCEPTABLE ONLY WITH OWNERSHIP APPROVAL. THESE |
| | PLANS WILL NOT BE APPROVED WITH CONTINGENCY FOR OWNER |
| | APPROVAL. IF CPVC IS TO BE ALLOWED THEN PER WPB FBC |
| | 107.2.1, PROVIDE A SPECIFICATION FOR HANGERS AND |
| | SUPPORTS THAT WILL MEET THE CRITERIA OF CPVC |
| | MANUFACTURER?S REQUIREMENTS FOR MATERIALS THAT MAY |
| | PHYSICALLY CONTACT THE CPVC MATERIAL AS WELL AS A |
| | SPECIFICATION FOR VALVES. OTHERWISE, REMOVE THE NOTE |
| | THAT MIGHT ALLOW CPVC. THE SPECIFICATION FOR VALVES |
| | SHALL INCLUDE THE WORDS "LEAD FREE". |
| | |
| | 14. PROVIDE A NOTE STATING ALL MATERIALS USED IN THE |
| | DOMESTIC WATER SYSTEM SHALL BE LEAD FREE. |
| | |
| | 15. HORIZONTAL/VERTICAL SUPPORT PER WPB FBC 107.2.1, |
| | SPECIFY HANGER TYPE FOR EACH SPECIFIED MATERIAL AND |
| | SYSTEM. INCLUDE COATINGS FOR NON-FERROUS METAL PIPING. |
| | PROVIDE NOTE AT HANGER DETAIL "AS REQUIRED BY FBC PL |
| | 308.5, INTERVAL SUPPORT, PIPE SHALL BE SUPPORTED IN |
| | ACCORDANCE WITH TABLE 308.5." |
| | |
| | 16. P1.1: PER WPB FBC 107.2.1, SIZE ALL PIPING. |
| | |
| | 17. P1.1: PER FBC PL 708.1.4, A CLEANOUT IS REQUIRED AT |
| | THE CHANGE IN DIRECTION IN THE SANITARY BUILDING DRAIN |
| | IN UNIT 102. PER WPB FBC 107.2.1, SHOW ON FLOOR PLAN |
| | AND RISER DIAGRAM; PROVIDE DETAIL AND ADD TO DRAIN |
| | SCHEDULE. |
| | |
| | 18. P1.2: NOTE REFERS TO P1.0 TO CONTINUE. THERE IS NO |
| | P1.0. PER WPB FBC 107.2.1, CLARIFY. |
| | |
| | 19. P1.2: PER WPB FBC 107.2.1, SIZE ALL PIPING. |
| | |
| | 20. P2.0: PLUMBING RISER DIAGRAMS; DRAWINGS AND TEXT |
| | ARE NOT VERY CLEAR. PER WPB FBC 107.2.1.3, PROVIDE |
| | CLEAR, PRECISE INFORMATION. |
| | |
| | 21. P2.0: SANITARY RISER DIAGRAM; IDENTIFY CLOTHES |
| | WASHER AND SHOW FIXTURE DRAIN PIPING, TRAP, WASTE |
| | BRANCH PIPING, VENT PIPING AND SIZE OF PIPING. |
| | |
| | 22. P2.0: SANITARY RISER DIAGRAM; 2-1/2 INCH SIZE |
| | SANITARY PIPING IS SHOWN. MANUFACTURERS OF PVC DWV PIPE |
| | AND FITTINGS SUCH AS SUCH AS CHARLOTTE, NIBCO AND |
| | SPEARS DO NOT MANUFACTURE THIS SIZE PIPE AND FITTINGS |
| | THAT WOULD COMPLY WITH THE MATERIAL REQUIREMENTS OF FBC |
| | PL CHAPTER 7. PER WPB FBC 107.2.1, SIZE ACCORDINGLY. |
| | |
| | 23. PROVIDE WATER HAMMER ARRESTOR SCHEDULE WITH |
| | MANUFACTURER AND MODEL NUMBER; CLEARLY IDENTIFY ON |
| | WATER RISER DIAGRAM ALL WATER HAMMER ARRESTORS. |
| | |
| | 24. PER WPB FBC 107.2.1, PROVIDE DETAIL AND |
| | SPECIFICATION FOR TRAP SEAL PROTECTION AS REQUIRED BY |
| | FBC PL 1002.4.1 FOR THE FLOOR DRAIN LOCATED IN THE GRAB |
| | & GO COFFEE BAR TOILET ROOM. SHOW COMPLIANCE WITH ONE |
| | OF THE FOLLOWING: FBC PL 1002.4.1.1, 1002.4.1.2, |
| | 1002.4.1.3 OR 1002.4.1.4. IF OTHER THAN 1002.4.1.4, |
| | SHOW PRIMER LINE INTO FLOOR DRAIN TRAP AND SOURCE |
| | LOCATION ON THE APPROPRIATE RISER DIAGRAMS AND FLOOR |
| | PLAN. |
| | |
| | 25. WHEN REFERRING TO CIVIL DRAWINGS, PROVIDE CIVIL |
| | DRAWING PLAN SHEET NUMBER. IN THE CASE OF THE POTABLE |
| | WATER, SHOW THE BACKFLOW PREVENTER, REFER TO THE |
| | CORRECT CIVIL DRAWINGS FOR EXACT LOCATION AND FOR |
| | INSTALLATION DETAIL; NOTE TO PROVIDE BY OTHERS. A |
| | SEPARATE PERMIT IS REQUIRED FOR THE BACKFLOW PREVENTER; |
| | PLEASE ACKNOWLEDGE THIS ON THE DRAWINGS. |
| | |
| | 26. FBC PL 314 (M) 314.2, PLEASE PROVIDE NOTES ON THE |
| | CONDENSATE DRAWING INDICATING THE PIPING MAINTAIN A |
| | MINIMUM HORIZONTAL SLOPE IN THE DIRECTION OF DISCHARGE |
| | OF NOT LESS THAN ONE-EIGHTH UNIT IN 12 UNITS HORIZONTAL |
| | (1 PERCENT SLOPE). |
| | |
| | 27. PER FBC PL 314 (M) 314.2.4.1, PLEASE SHOW THE |
| | INLINE CHECK VALVE OR TRAP AT EACH FCU CONDENSATE LINE. |
| | |
| | 28. PER FBC PL 314 (M) 314.2.5, MAIN PIPING SHALL BE |
| | SIZED AND FITTINGS SHALL BE CONFIGURED (I.E. |
| | COMMERCIALLY MANUFACTURED DRAINAGE PATTERN) TO ALLOW |
| | RODDING BY COMMERCIALLY MANUFACTURED DRAIN CLEARING |
| | EQUIPMENT. SHOW LOCATIONS OF ALL CLEANOUTS. SPACE |
| | CLEANOUTS AT INTERVALS THAT WILL ACCOMMODATE SAID |
| | EQUIPMENT. |
| | |
| | 29. PER FBC PL 314 (M) 314.2, PLEASE INDICATE WHICH |
| | CIVIL SHEET AND THE DETAIL SHOWING THE LOCATION OF THE |
| | CONDENSATE DRAINAGE LOCATION AT THE EXTERIOR. FBC M |
| | 307.2.1 |
| | |
| | 30. PER FBC PL 314 (M) 314.2.3, (M) 314.2.3.1, PLEASE |
| | SHOW THE SECONDARY DRAIN OR SHOW THE WATER MONITORING |
| | DEVICE FOR EACH FCU. |
| | |
| | 31. PER WPB FBC 107.2.1, PROVIDE CALCULATIONS USED IN |
| | SIZING OF STORM DRAINS (TABLES FROM FBC PL 1106.2, |
| | INDICATE SLOPE OF HORIZONTAL DRAINS AND NOTE HOW MUCH |
| | SQUARE FOOTAGE IS ATTRIBUTED TO PARAPET WALLS) |
| | |
| | 32. P1.3: THE SCUPPERS CALCULATION TABLE BASED ON 2014 |
| | FBC-PL TABLE 1106.7 SHALL NOT BE USED. FBC PL 1106.5 |
| | STATES WHERE SCUPPERS ARE USED FOR PRIMARY ROOF |
| | DRAINAGE OR FOR SECONDARY (EMERGENCY OVERFLOW) ROOF |
| | DRAINAGE OR BOTH, THE QUANTITY, SIZE, LOCATION AND |
| | INLET ELEVATION OF THE SCUPPERS SHALL BE CHOSEN TO |
| | PREVENT THE DEPTH OF PONDING WATER ON THE ROOF FROM |
| | EXCEEDING THE MAXIMUM WATER DEPTH THAT THE ROOF WAS |
| | DESIGNED FOR AS DETERMINED BY SECTION 1611.1 OF THE |
| | FLORIDA BUILDING CODE, BUILDING. SCUPPER OPENINGS SHALL |
| | BE NOT LESS THAN 4 INCHES (102 MM) IN HEIGHT AND HAVE A |
| | WIDTH THAT IS EQUAL TO OR GREATER THAN THE |
| | CIRCUMFERENCE OF A ROOF DRAIN SIZED FOR THE SAME ROOF |
| | AREA. THE FLOW THROUGH THE PRIMARY SYSTEM SHALL NOT BE |
| | CONSIDERED WHEN LOCATING AND SIZING SECONDARY SCUPPERS. |
| | PER WPB FBC 107.2.1 PROVIDE CALCULATIONS IN COMPLIANCE |
| | WITH FBC PL 1106.5 AND FBC 1611.1. |
| | |
| | 33. A2.3 ROOF PLAN NOTES SCUPPER LOCATION AND REFERS TO |
| | A8.4/DETAIL 9. THIS PLAN IS NOT PART OF THE DOCUMENTS. |
| | PER WPB FBC 107.2.1, PROVIDE THE PLAN OR PROVIDE DETAIL |
| | ON AN EXISTING PLAN. |
| | |
| | 34. A2.3 AND P1.3 ROOF PLAN SHEETS SHOW SCUPPERS IN |
| | DIFFERENT LOCATIONS FROM EACH OTHER. PER WPB FBC |
| | 107.2., CLARIFY AND RECONCILE. |
| | |
| | |
| | END OF COMMENTS. |
| | |
| | AN ATTEMPT HAS BEEN MADE TO MAKE THE MOST COMPREHENSIVE |
| | REVIEW POSSIBLE USING THE PLANS PROVIDED. A REVIEW OF |
| | RESUBMITTED PLANS MAY RESULT IN ADDITIONAL COMMENTS. |
| | PLEASE RESUBMIT CLEARLY LEGIBLE PLANS; A RESPONSE |
| | NARRATIVE ADDRESSING THE COMMENTS FROM THE PRIOR REVIEW |
| | WILL GREATLY HELP WITH THE REVIEW PROCESS AND IS VERY |
| | MUCH APPRECIATED. |
| | |
| | |
| | JERALD SMITH |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | EMAIL [email protected] |
| | MOBILE 561-246-0882 |
| | PLEASE NOTE THAT I TYPICALLY WORK ON TUESDAYS AND |
| | THURSDAYS |
| | |
| | 21021445 3404 BROADWAY |
| | |