Plan Review Details - Permit 21021207
Plan Review Stops For Permit 21021207
Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2021-03-24 Cont ID  
Sent By pleduc Date 2021-03-24 Time   Rev Time 0.00
Received By pleduc Date 2021-03-24 Time 10:20 Sent To  
Notes
2021-03-24 10:21:06THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
 1) RELOCATED DROPS MAY NOT BE ABLE TO BE ISOLATED;
 HOWEVER, THE FLOOR AREA MAY AND BE TESTED AT 200PSI FOR
 2HRS.
  
 IF NOT OR LESS THAN 20 HEADS:
  
 2) TEST AT WORKING PRESSURE FOR 2 HOURS PER NFPA 13.
  
 3) USE FIRE PUMP TEST PRESSURE FOR WORKING PRESSURE
 CALCULATIONS MINUS 5 PSI PER FLOOR FOR ELEVATION
 PRESSURE LOSS.
 PER NFPA 13
  
 3.3.24 SYSTEM WORKING PRESSURE. THE MAXIMUM ANTICIPATED
 STATIC (NONFLOWING) OR FLOWING PRESSURE APPLIED TO
 SPRINKLER SYSTEM COMPONENTS EXCLUSIVE OF SURGE
 PRESSURES AND EXCLUSIVE OF PRESSURE FROM THE FIRE
 DEPARTMENT CONNECTION.
  
 25.2 ACCEPTANCE REQUIREMENTS.
  
 25.2.1* HYDROSTATIC TESTS.
 25.2.1.1 UNLESS PERMITTED BY 25.2.1.2 THROUGH 25.2.1.5,
 ALL PIPING AND ATTACHED APPURTENANCES SUBJECTED TO
 SYSTEM WORKING PRESSURE SHALL BE HYDROSTATICALLY TESTED
 AT 200 PSI (13.8 BAR) AND SHALL MAINTAIN THAT PRESSURE
 WITHOUT LOSS FOR 2 HOURS.
 25.2.1.2 PORTIONS OF SYSTEMS NORMALLY SUBJECTED TO
 SYSTEM WORKING PRESSURES IN EXCESS OF 150 PSI (10.3
 BAR) SHALL BE TESTED AS DESCRIBED IN 25.2.1.1, AT A
 PRESSURE OF 50 PSI (3.4 BAR) IN EXCESS OF SYSTEM
 WORKING PRESSURE.
 25.2.1.3 WHERE COLD WEATHER WILL NOT PERMIT TESTING
 WITH WATER, AN INTERIM AIR TEST SHALL BE PERMITTED TO
 BE CONDUCTED AS DESCRIBED IN 25.2.2. THIS PROVISION
 SHALL NOT REMOVE OR REPLACE THE REQUIREMENT FOR
 CONDUCTING THE HYDROSTATIC TEST AS DESCRIBED IN
 25.2.1.1.
 25.2.1.4 MODIFICATIONS TO EXISTING PIPING SYSTEMS SHALL
 REQUIRE TESTING AT SYSTEM WORKING PRESSURE.
 25.2.1.4.1 WHERE MODIFICATION IS MADE TO AN EXISTING
 SYSTEM AFFECTING MORE THAN 20 SPRINKLERS, THE NEW
 PORTION SHALL BE ISOLATED AND TESTED AT NOT LESS THAN
 200 PSI (13.8 BAR) FOR 2 HOURS.
 25.2.1.4.2 MODIFICATIONS THAT CANNOT BE ISOLATED, SUCH
 AS RELOCATED DROPS, SHALL REQUIRE TESTING AT SYSTEM
 WORKING PRESSURE.
 25.2.1.5* THE TEST PRESSURE SHALL BE READ FROM A GAUGE
 LOCATED AT THE LOW ELEVATION POINT OF THE SYSTEM OR
 PORTION BEING TESTED. THE PRESSURES IN PIPING AT HIGHER
 ELEVATIONS SHALL BE PERMITTED TO BE LESS THAN 200 PSI
 (13.8 BAR) WHEN ACCOUNTING FOR ELEVATION LOSSES.
 SYSTEMS OR PORTIONS OF SYSTEMS THAT CAN BE ISOLATED
 SHALL BE PERMITTED TO BE TESTED SEPARATELY.
  
 25.2.1.8* WHEN SYSTEMS ARE BEING HYDROSTATICALLY
 TESTED, TESTS SHALL BE PERMITTED TO BE CONDUCTED WITH
 PENDENT OR HORIZONTAL SIDEWALL SPRINKLERS OR PLUGS
 INSTALLED IN FITTINGS. ANY PLUGS SHALL BE REPLACED WITH
 PENDENT OR HORIZONTAL SIDEWALL SPRINKLERS AFTER THE
 TEST IS COMPLETED.
  
 25.2.1.10 PROVISION SHALL BE MADE FOR THE PROPER
 DISPOSAL OF WATER USED FOR FLUSHING OR TESTING
  
 4) PLEASE ENSURE THAT A MECHANICAL INSPECTION # 603 -
 FIRE SPRINKLER PIPE IS CALLED IN WITH FIRE SPRINKLER
 #310 ? FIRE SPRINKLER HEAD AND # 311 - PRESSURE TEST
 INSPECTIONS.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2021-03-17 Cont ID  
Sent By pleduc Date 2021-03-17 Time   Rev Time 0.00
Received By pleduc Date 2021-03-17 Time 14:21 Sent To  
Notes
2021-03-17 14:25:09THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
 1) RELOCATED DROPS MAY NOT BE ABLE TO BE ISOLATED;
 HOWEVER, THE FLOOR AREA MAY AND BE TESTED AT 200PSI FOR
 2HRS.
  
 IF NOT OR LESS THAN 20 HEADS:
  
 2) TEST AT WORKING PRESSURE FOR 2 HOURS PER NFPA 13.
  
 3) USE FIRE PUMP TEST PRESSURE FOR WORKING PRESSURE
 CALCULATIONS MINUS 5 PSI PER FLOOR FOR ELEVATION
 PRESSURE LOSS.
 PER NFPA 13
  
 3.3.24 SYSTEM WORKING PRESSURE. THE MAXIMUM ANTICIPATED
 STATIC (NONFLOWING) OR FLOWING PRESSURE APPLIED TO
 SPRINKLER SYSTEM COMPONENTS EXCLUSIVE OF SURGE
 PRESSURES AND EXCLUSIVE OF PRESSURE FROM THE FIRE
 DEPARTMENT CONNECTION.
  
 25.2 ACCEPTANCE REQUIREMENTS.
  
 25.2.1* HYDROSTATIC TESTS.
 25.2.1.1 UNLESS PERMITTED BY 25.2.1.2 THROUGH 25.2.1.5,
 ALL PIPING AND ATTACHED APPURTENANCES SUBJECTED TO
 SYSTEM WORKING PRESSURE SHALL BE HYDROSTATICALLY TESTED
 AT 200 PSI (13.8 BAR) AND SHALL MAINTAIN THAT PRESSURE
 WITHOUT LOSS FOR 2 HOURS.
 25.2.1.2 PORTIONS OF SYSTEMS NORMALLY SUBJECTED TO
 SYSTEM WORKING PRESSURES IN EXCESS OF 150 PSI (10.3
 BAR) SHALL BE TESTED AS DESCRIBED IN 25.2.1.1, AT A
 PRESSURE OF 50 PSI (3.4 BAR) IN EXCESS OF SYSTEM
 WORKING PRESSURE.
 25.2.1.3 WHERE COLD WEATHER WILL NOT PERMIT TESTING
 WITH WATER, AN INTERIM AIR TEST SHALL BE PERMITTED TO
 BE CONDUCTED AS DESCRIBED IN 25.2.2. THIS PROVISION
 SHALL NOT REMOVE OR REPLACE THE REQUIREMENT FOR
 CONDUCTING THE HYDROSTATIC TEST AS DESCRIBED IN
 25.2.1.1.
 25.2.1.4 MODIFICATIONS TO EXISTING PIPING SYSTEMS SHALL
 REQUIRE TESTING AT SYSTEM WORKING PRESSURE.
 25.2.1.4.1 WHERE MODIFICATION IS MADE TO AN EXISTING
 SYSTEM AFFECTING MORE THAN 20 SPRINKLERS, THE NEW
 PORTION SHALL BE ISOLATED AND TESTED AT NOT LESS THAN
 200 PSI (13.8 BAR) FOR 2 HOURS.
 25.2.1.4.2 MODIFICATIONS THAT CANNOT BE ISOLATED, SUCH
 AS RELOCATED DROPS, SHALL REQUIRE TESTING AT SYSTEM
 WORKING PRESSURE.
 25.2.1.5* THE TEST PRESSURE SHALL BE READ FROM A GAUGE
 LOCATED AT THE LOW ELEVATION POINT OF THE SYSTEM OR
 PORTION BEING TESTED. THE PRESSURES IN PIPING AT HIGHER
 ELEVATIONS SHALL BE PERMITTED TO BE LESS THAN 200 PSI
 (13.8 BAR) WHEN ACCOUNTING FOR ELEVATION LOSSES.
 SYSTEMS OR PORTIONS OF SYSTEMS THAT CAN BE ISOLATED
 SHALL BE PERMITTED TO BE TESTED SEPARATELY.
  
 25.2.1.8* WHEN SYSTEMS ARE BEING HYDROSTATICALLY
 TESTED, TESTS SHALL BE PERMITTED TO BE CONDUCTED WITH
 PENDENT OR HORIZONTAL SIDEWALL SPRINKLERS OR PLUGS
 INSTALLED IN FITTINGS. ANY PLUGS SHALL BE REPLACED WITH
 PENDENT OR HORIZONTAL SIDEWALL SPRINKLERS AFTER THE
 TEST IS COMPLETED.
  
 25.2.1.10 PROVISION SHALL BE MADE FOR THE PROPER
 DISPOSAL OF WATER USED FOR FLUSHING OR TESTING
  
 4) PLEASE ENSURE THAT A MECHANICAL INSPECTION # 603 -
 FIRE SPRINKLER PIPE IS CALLED IN WITH FIRE SPRINKLER
 #310 ? FIRE SPRINKLER HEAD AND # 311 - PRESSURE TEST
 INSPECTIONS.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-03-24 Cont ID  
Sent By pvalenti Date 2021-03-24 Time 16:40 Rev Time 0.00
Received By pvalenti Date 2021-03-23 Time 09:01 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-03-18 Cont ID  
Sent By pvalenti Date 2021-03-18 Time 14:41 Rev Time 0.00
Received By pvalenti Date 2021-03-12 Time 09:55 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-03-24 Cont ID  
Sent By pvalenti Date 2021-03-24 Time 16:36 Rev Time 0.00
Received By pvalenti Date 2021-03-24 Time 16:36 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2021-03-18 Cont ID  
Sent By pvalenti Date 2021-03-18 Time 14:39 Rev Time 0.00
Received By pvalenti Date 2021-03-18 Time 14:39 Sent To  
Notes
2021-03-18 14:41:11****CORRECTIONS****
  
 PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 SIGNATURE REVIEW DENIED:
  
 FS 471/FS 481 DOCUMENTS PREPARED BY AN
 ENGINEER/ARCHITECT AND SUBMITTED FOR PUBLIC RECORD ARE
 TO BE SIGNED, SEALED & DATED ORIGINALS. A SCAN OF A
 SIGNED/SEALED PLAN IS NOT CONSIDERED AN ORIGINAL.
 UPLOAD OR EMAIL A DIGITALLY SIGNED (THIRD PARTY
 VERIFIED) PLAN OR YOU CAN MAIL AN ORIGINAL
 SIGNED/SEALED PAPER ORIGINAL TO:
  
 PETER E VALENTI
 BUILDING PLANS EXAMINER II
 BUILDING DIVISION
 CITY OF WEST PALM BEACH
 401 CLEMATIS STREET, 1ST FLOOR
 WEST PALM BEACH, FL 33401
 FEEL FREE TO CONTACT ME AT 561 805 6673.
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved