| Plan Review Stops For Permit 21020990 |
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
3 |
Status |
P |
Date |
2021-03-25 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2021-03-25 |
Time |
14:53 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2021-03-25 |
Time |
14:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
2 |
Status |
F |
Date |
2021-03-23 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2021-03-23 |
Time |
08:19 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2021-03-23 |
Time |
08:15 |
Sent To |
|
|
| Notes |
| 2021-03-23 08:20:36 | ****CORRECTIONS**** | | | | | | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | | | | ASBESTOS REQUIREMENTS: | | | | | | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | | COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE | | | GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS | | | REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE: | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | | RENOVATION.HTML | | | | | | THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO | | | [email protected]. THE INFORMATION SHOULD BE IN PDF | | | FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE INCLUDE | | | THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT LINE. |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
1 |
Status |
F |
Date |
2021-02-22 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-02-22 |
Time |
16:05 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-02-22 |
Time |
16:05 |
Sent To |
|
|
| Notes |
| 2021-02-22 16:06:27 | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | | COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE | | | GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS | | | REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE: | | | | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | | RENOVATION.HTML | | | | | | THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO | | | [email protected]. THE INFORMATION SHOULD BE IN | | | PDF FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE | | | INCLUDE THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT | | | LINE. | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2021-04-15 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2021-04-15 |
Time |
09:13 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2021-04-15 |
Time |
09:13 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2021-04-09 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2021-04-09 |
Time |
16:47 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2021-04-09 |
Time |
16:47 |
Sent To |
|
|
| Notes |
| 2021-04-09 16:55:25 | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | | | | BUILDING REVIEW DENIED: | | | | | | FS 553.79/FBC B 107, SHEET 101.0, SECTIONS PROJECT DATA | | | AND CODES FOR REFERENCE INDICATE THE 2017 6TH EDITION | | | OF THE FLORIDA BUILDING CODE. THIS NEEDS TO BE CHANGED | | | TO THE 2020 7TH EDITION OF THE FLORIDA BUILDING CODE. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2021-04-09 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2021-04-09 |
Time |
16:04 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2021-04-09 |
Time |
12:50 |
Sent To |
|
|
| Notes |
| 2021-04-09 16:07:23 | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2021-04-09 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2021-04-09 |
Time |
14:53 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2021-04-09 |
Time |
11:41 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2021-03-22 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2021-03-22 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2021-03-22 |
Time |
10:28 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2021-02-23 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2021-02-23 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2021-02-23 |
Time |
14:19 |
Sent To |
|
|
| Notes |
| 2021-02-23 14:23:17 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | 1) THERE ARE INDICATIONS OF FLOOR TILE WORK BUT NO | | | SPECIFICATIONS SHEETS THAT INDICATE MEETING THE | | | REQUIREMENTS PER NFPA' | | | | | | PER NFPA 101, CH 32 | | | | | | 30.3.3.2 INTERIOR WALL AND CEILING FINISH. INTERIOR | | | WALL AND | | | CEILING FINISH MATERIALS COMPLYING WITH SECTION 10.2 | | | SHALL BE | | | PERMITTED AS FOLLOWS: | | | (1) EXIT ENCLOSURES ? CLASS A | | | (2) LOBBIES AND CORRIDORS ? CLASS A OR CLASS B | | | (3) OTHER SPACES ? CLASS A, CLASS B, OR CLASS C | | | | | | 30.3.3.3 INTERIOR FLOOR FINISH. | | | 30.3.3.3.1 INTERIOR FLOOR FINISH SHALL COMPLY WITH | | | SECTION 10.2. | | | 30.3.3.3.2 INTERIOR FLOOR FINISH IN EXIT ENCLOSURES AND | | | EXIT ACCESS | | | CORRIDORS AND SPACES NOT SEPARATED FROM THEM BY WALLS | | | COMPLYING | | | WITH 30.3.6 SHALL BE NOT LESS THAN CLASS II. | | | 30.3.3.3.3 INTERIOR FLOOR FINISH SHALL COMPLY WITH | | | 10.2.7.1 OR | | | 10.2.7.2, AS APPLICABLE | | | | | | | | | 10.2.1.1 CLASSIFICATION OF INTERIOR FINISH MATERIALS | | | SHALL BE IN | | | ACCORDANCE WITH TESTS MADE UNDER CONDITIONS SIMULATING | | | ACTUAL | | | INSTALLATIONS, PROVIDED THAT THE AUTHORITY HAVING | | | JURISDICTION IS | | | PERMITTED TO ESTABLISH THE CLASSIFICATION OF ANY | | | MATERIAL FOR WHICH | | | CLASSIFICATION BY A STANDARD TEST IS NOT AVAILABLE, | | | UNLESS OTHERWISE | | | PROVIDED IN 10.2.1.2 OR 10.2.1.4. | | | 10.2.1.2 THE PROVISIONS OF 10.2.1.1 SHALL NOT APPLY TO | | | MATERIALS HAVING | | | A TOTAL THICKNESS OF LESS THAN 1?28 IN. (0.9 MM) THAT | | | ARE APPLIED DIRECTLY | | | TO THE SURFACE OF WALLS AND CEILINGS WHERE BOTH OF THE | | | FOLLOWING | | | CONDITIONS ARE MET: | | | (1) THE WALL OR CEILING SURFACE IS A NONCOMBUSTIBLE OR | | | LIMITED COMBUSTIBLE | | | MATERIAL. | | | (2) THE MATERIALS APPLIED MEET THE REQUIREMENTS OF | | | CLASS A INTERIOR | | | WALL OR CEILING FINISH WHEN TESTED IN ACCORDANCE WITH | | | 10.2.3, | | | USING FIBER CEMENT BOARD AS THE SUBSTRATE MATERIAL. | | | | | | 10.2.7* INTERIOR FLOOR FINISH TESTING AND | | | CLASSIFICATION. | | | 10.2.7.1* CARPET AND CARPET LIKE INTERIOR FLOOR | | | FINISHES SHALL | | | COMPLY WITH ASTM D 2859, STANDARD TEST METHOD FOR | | | IGNITION | | | CHARACTERISTICS OF FINISHED TEXTILE FLOOR COVERING | | | MATERIALS. | | | 10.2.7.2* FLOOR COVERINGS, OTHER THAN CARPET FOR WHICH | | | 10.2.2.2 | | | ESTABLISHES REQUIREMENTS FOR FIRE PERFORMANCE, SHALL | | | HAVE A | | | MINIMUM CRITICAL RADIANT FLUX OF 0.1 W/CM2. | | | | | | PLEASE REVIEW AND PROVIDE SPEC SHEETS. | | | | | | | | | 2) THERE ARE INDICATIONS OF CEILING, WALL & VANITY | | | REPLACEMENT AND PAINTING. | | | | | | ANY WORK INVOLVING FIRE SPRINKLERS/FIRE ALARM SYSTEMS | | | OR EQUIPMENT SHALL BE DONE UNDER SEPARATE PERMITS AND | | | SHOP DRAWINGS. | | | | | | FIRE SPRINKLERS AND FIRE ALARM EQUIPMENT SHALL BE | | | PROTECTED FROM PAINTING OR DAMAGE. | | | | | | THE FIRE SPRINKLER/FIRE ALARM SYSTEMS SHALL BE | | | MAINTAINED THROUGHOUT DEMO AND RECONSTRUCTION. | | | | | | PLEASE INDICATE IF THEIR IS FIRE SPRINKLER HEADS OF | | | FIRE ALARM EQUIPMENT WITHIN THE PROPOSED AREA AND | | | PROVIDE A NOTE OF ACKNOWLEDGEMENT AND ENSURE | | | COMPLIANCE. | | | | | | | | | 3) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET | | | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE | | | ABOVE. | | | | | | | | | 4) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | | RE-SUBMITTAL OF THE ABOVE. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2021-04-16 |
Time |
|
Rev Time |
0.00 |
| Received By |
ccarvaja |
Date |
2021-04-02 |
Time |
12:21 |
Sent To |
|
|
| Notes |
| 2021-03-24 18:28:31 | TO BLDG DIV AUDIT | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2021-03-24 |
|
|
Cont ID |
|
| Sent By |
dbattles |
Date |
2021-03-24 |
Time |
09:34 |
Rev Time |
0.00 |
| Received By |
dbattles |
Date |
2021-03-18 |
Time |
09:07 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2021-03-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-03-01 |
Time |
07:14 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-02-19 |
Time |
16:04 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
1 |
Status |
N |
Date |
2021-02-19 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-02-19 |
Time |
14:45 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-02-19 |
Time |
14:45 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
N |
Date |
2021-04-09 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-04-09 |
Time |
13:41 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-04-09 |
Time |
12:47 |
Sent To |
|
|
| Notes |
| 2021-04-09 13:42:29 | NO MECHANICAL WORK SHOWN ON THE DRAWINGS FOR THIS | | | PROJECT. ME |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2021-04-16 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2021-04-16 |
Time |
15:59 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2021-04-16 |
Time |
15:40 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
3 |
Status |
P |
Date |
2021-04-08 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-04-08 |
Time |
08:48 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-04-08 |
Time |
08:48 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
2 |
Status |
F |
Date |
2021-03-24 |
|
|
Cont ID |
|
| Sent By |
dbattles |
Date |
2021-03-24 |
Time |
09:33 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-03-24 |
Time |
09:33 |
Sent To |
|
|
| Notes |
| 2021-03-24 18:27:38 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. FS553, THE PLAN REVIEW AFFIDAVIT DOES NOT INCLUDE | | | THE SUPPORTING DOCUMENTS UPLOADED ON 3/18/21. HAVE THE | | | PRIVATE PROVIDER REVIEW THE NEW DOCUMENTS AND PROVIDE A | | | NEW PLAN REVIEW AFFIDAVIT. | | | | | | 2. FS553.791(4)(B). A RESUME WAS PROVIDED FOR DOUG | | | TAYLOR; IT IS NOT CLEAR WHICH TRADE INSPECTIONS THIS | | | PRIVATE PROVIDER WILL BE PERFORMING, WILL IT BE ALL | | | TRADES? IF THAT IS THE CASE, PROVIDE A STATEMENT TO | | | THAT EFFECT. IF NOT, SUBMIT RESUMES FOR THE ALL PRIVATE | | | PROVIDERS ON THIS PROJECT. | | | | | | A COPY OF THE LICENSE FOR RICHARD BENNETT, STANDARD | | | INSPECTOR, BUILDING, WAS SUBMITTED. A RESUME WAS NOT | | | SUBMITTED. WILL THIS PRIVATE PROVIDER BE PERFORMING | | | BUILDING INSPECTIONS FOR THIS PERMIT? IF YES, PROVIDE A | | | RESUME AND A STATEMENT TO THAT EFFECT. | | | | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
1 |
Status |
F |
Date |
2021-03-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-03-01 |
Time |
07:13 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-03-01 |
Time |
07:13 |
Sent To |
|
|
| Notes |
| 2021-03-01 07:14:07 | NEW AFFIDAVITS REQUIRED, FAILED FIRE | | | | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
N |
Date |
2021-03-23 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2021-03-23 |
Time |
08:15 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2021-03-23 |
Time |
08:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
N |
Date |
2021-02-22 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-02-22 |
Time |
17:16 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-02-22 |
Time |
17:14 |
Sent To |
|
|
| Notes |
|
|