| 2021-02-24 12:39:24 | 02/24/21 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. A CONTAINMENT REDUCED PRINCIPAL ZONE BACKFLOW WILL |
| | BE REQUIRED AT THE WATER METER TO HAVE A UP TO DATE |
| | CERTIFICATION PER THE CITY OF WEST PALM BEACH UTILITIES |
| | DEPARTMENT AND THE CROSS CONNECTION CONTROL MANUAL PAGE |
| | 11 (C). THIS IS DUE TO THE AUTOFILL, WHICH WILL REQUIRE |
| | A BACKFLOW (PVB WITH A SEPARATE PERMIT APPICATION) IN |
| | FRONT OF THE AUTOFILL. THIS IS AN ISOLATION BACKFLOW, |
| | AND IT WILL BE REQUIRED TO BE CERTIFIED BY A LICENSED |
| | BACKFLOW CONTRACTOR. A REPORT MUST BE FILLED OUT AND BE |
| | WITH THE PERMIT AT FINAL AS THE INSPECTOR MUST TAKE FOR |
| | CITY RECORDS. |
| | |
| | 2. SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE |
| | MAXIMUM SYSTEM FLOW. THE PUMP'S MAXIMUM FLOW FROM ITS |
| | PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN |
| | DETERMINING THE MAXIMUM SYSTEM FLOW RATE PER |
| | ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 |
| | EDITION ADDRESSES THE FLOW RATE IN GALLONS PER MINUTE |
| | (GPM). IT REQUIRES THAT THE MAXIMUM SYSTEM FLOW RATE |
| | DOES NOT EXCEED THE LISTED MAXIMUM FLOW RATE OF THE |
| | SUCTION OUTLET FITTING ASSEMBLY (DRAIN COVER). THE TDH |
| | CALCULATIONS MUST INCLUDE ALL THE SYSTEM COMPONENTS, |
| | INCLUDING SUCTION AND RETURN PIPING, FITTINGS, VALVES, |
| | HEATER, FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS |
| | EXCEPT THE PUMP. |
| | |
| | 3. SUBMIT THE POOL PUMP CURVE. IDENTIFY THE PUMP CURVE |
| | WHICH CURVE KEY IS SPECIFIC TO THE PUMP BEING INSTALLED |
| | ON THIS POOL. THIS IS NEEDED TO CONFIRM THE MAXIMUM |
| | SYSTEM FLOW FROM THE TDH CALCULATIONS PER THE |
| | ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1. |
| | |
| | 4. SUBMIT THE MANUFACTURER'S SPECIFICATIONS FOR THE GAS |
| | HEATER, CHLORINATOR, CARTRIDGE FILTER, AND PUMP PER THE |
| | WPB AMENDMENTS TO FBC SEC. 107.2.1. |
| | |
| | 5. THE POOL HEATER SHALL HAVE A MINIMUM THERMAL |
| | EFFICIENCY OF 82% PER THE 2017 FBC-ENERGY SEC. |
| | R403.10.4. |
| | |
| | 6. SOLAR COVER REQUIRED, HEATED SWIMMING POOLS, AND |
| | INGROUND PERMANENTLY INSTALLED SPAS SHALL BE EQUIPPED |
| | WITH A VAPOR-RETARDANT COVER ON OR AT THE WATER SURFACE |
| | OR A LIQUID COVER OR OTHER MEANS PROVEN TO REDUCE HEAT |
| | LOSS PER THE 2017 FBC- ENERGY- SEC. R 403.10.3. |
| | |
| | WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. |
| | A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW |
| | COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION |
| | MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| | THE CHANGES CAN BE FOUND WILL HELP EXPEDITE YOUR |
| | PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA |
| | |
| | LUIS A. CRESPO |
| | PLUMBING PLAN EXAMINER / INSPECTOR |
| | EMAIL: [email protected] OFFICE: 561 805-6720 |
| | |