Plan Review Details - Permit 21020907
Plan Review Stops For Permit 21020907
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status P Date 2021-04-21 Cont ID  
Sent By pvalenti Date 2021-04-21 Time 16:01 Rev Time 0.00
Received By pvalenti Date 2021-04-21 Time 16:01 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2021-02-22 Cont ID  
Sent By pvalenti Date 2021-02-22 Time 07:59 Rev Time 0.00
Received By pvalenti Date 2021-02-22 Time 07:30 Sent To  
Notes
2021-02-22 08:00:20ASBESTOS REQUIREMENTS:
  
 PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  
 THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO
 [email protected]. THE INFORMATION SHOULD BE IN PDF
 FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE INCLUDE
 THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT LINE.

Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status P Date 2021-07-29 Cont ID  
Sent By pvalenti Date 2021-07-29 Time 15:25 Rev Time 0.00
Received By pvalenti Date 2021-07-29 Time 15:25 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status F Date 2021-06-21 Cont ID  
Sent By pvalenti Date 2021-06-21 Time 16:20 Rev Time 0.00
Received By pvalenti Date 2021-06-21 Time 16:12 Sent To  
Notes
2021-06-21 16:21:43****CORRECTIONS****
  
 PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 BUILDING REVIEW DENIED:
  
 3. PROVIDE THE REQUIREMENTS FOR METHOD
 OF WATER DOWN DURING DEMOLITION OF STRUCTURE: A HYDRANT
 METER REQUIRES A PUBLIC UTILITIES PERMIT, A BACK FLOW
 PREVENTER REQUIRES A PLUMBING PERMIT, AND A WATER TRUCK
 REQUIRES DETAILED INFORMATION ABOUT THE TRUCK AND
 CONFIRMATION THAT TRUCK WILL BE ON-SITE DURING
 DEMOLITION OF STRUCTURE).
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2021-06-03 Cont ID  
Sent By pvalenti Date 2021-06-03 Time 07:29 Rev Time 0.00
Received By pvalenti Date 2021-06-03 Time 06:37 Sent To  
Notes
2021-06-03 07:48:04 
 3. PROVIDE THE REQUIREMENTS FOR METHOD
 OF WATER DOWN DURING DEMOLITION OF STRUCTURE: A HYDRANT
 METER REQUIRES A PUBLIC UTILITIES PERMIT, A BACK FLOW
 PREVENTER REQUIRES A PLUMBING PERMIT, AND A WATER TRUCK
 REQUIRES DETAILED INFORMATION ABOUT THE TRUCK AND
 CONFIRMATION THAT TRUCK WILL BE ON-SITE DURING
 DEMOLITION OF STRUCTURE).
  
 6. COMPLETE THE DEMO DEBRIS FORM:
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
 IF THE FORM IS NOT AVAILABLE ONLINE, SEND A REQUEST FOR
 THE FORM TO [email protected].
 (PROVIDE THE REQUESTED INFORMATION NOTED ABOVE).

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2021-04-21 Cont ID  
Sent By pvalenti Date 2021-04-21 Time 16:03 Rev Time 0.00
Received By pvalenti Date 2021-04-21 Time 16:01 Sent To  
Notes
2021-04-21 16:05:24PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 BUILDING REVIEW FAILED:
  
 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC)
 RELEASE OF SERVICE CONFIRMATION.
 (PROVIDE PERMIT INFORMATION FOR ELECTRICAL REMOVAL FROM
 STRUCTURE & PASS THE ELECTRIC REVIEW STOP FOR THIS
 DEMO).
  
  
 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS)
 RELEASE OF SERVICE CONFIRMATION
 (PROVIDE THE RELEASE FORM COMPLETED & SIGNED BY FPU
 INDICATING THAT THERE'S NO GAS AT THIS LOCATION).
  
  
 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON THEIR FORM
 "DEMOLITION APPLICATION"
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
 IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE NOTED ON THEIR FORM.
 IF BACKFLOW PREVENTER OPTION IS CHOSEN - BEFORE
 SCHEDULING THE 703, THE BACKFLOW DEVICE NEEDS TO BE
 TESTED AND CERTIFIED BY THE CITY?S UTILITIES DEPT,
 561-822-2244.
 FAX THE COMPLETED "DEMOLITION APPLICATION" FORM TO
 561-822-2183.
 (PROVIDE THE COMPLETED, BY PUBLIC UTILITIES, DEMOLITION
 APPLICATION. ALSO PROVIDE THE REQUIREMENTS FOR METHOD
 OF WATER DOWN DURING DEMOLITION OF STRUCTURE: HYDRANT
 METER REQUIRES A PUBLIC UTILITIES PERMIT, BACK FLOW
 PREVENTER REQUIRES A PLUMBING PERMIT OR A WATER TRUCK
 REQUIRES DETAILED INFORMATION ABOUT THE TRUCK AND
 CONFIRMATION THAT TRUCK WILL BE ON-SITE DURING
 DEMOLITION OF STRUCTURE).
  
  
 6. COMPLETE THE DEMO DEBRIS FORM:
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
 IF THE FORM IS NOT AVAILABLE ONLINE, SEND A REQUEST FOR
 THE FORM TO [email protected].
 (PROVIDE THE REQUESTED INFORMATION NOTED ABOVE).

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-02-22 Cont ID  
Sent By pvalenti Date 2021-02-22 Time 08:01 Rev Time 0.00
Received By pvalenti Date 2021-02-22 Time 07:30 Sent To  
Notes
2021-02-22 08:07:29PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING CODE, BUILDING 3303:
  
 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC)
 RELEASE OF SERVICE CONFIRMATION
  
 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS)
 RELEASE OF SERVICE CONFIRMATION
  
 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON THEIR FORM
 "DEMOLITION APPLICATION"
  
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
  IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE NOTED ON THEIR FORM.
  IF BACKFLOW PREVENTER OPTION IS CHOSEN - BEFORE
 SCHEDULING THE 703, THE BACKFLOW DEVICE NEEDS TO BE
 TESTED AND CERTIFIED BY THE CITY?S UTILITIES DEPT,
 561-822-2244.
  
 FAX THE COMPLETED "DEMOLITION APPLICATION" FORM TO
 561-822-2183.
  
 6. COMPLETE THE DEMO DEBRIS FORM:
  
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
 IF THE FORM IS NOT AVAILABLE ONLINE, SEND A REQUEST FOR
 THE FORM TO [email protected].
  
  
  
  

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2021-05-25 Cont ID  
Sent By jleahy Date 2021-05-25 Time 18:55 Rev Time 0.00
Received By jleahy Date 2021-05-25 Time 18:55 Sent To  
Notes
2021-05-25 18:55:57SEE PERMIT 21050469
  

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2021-04-23 Cont ID  
Sent By jleahy Date 2021-04-23 Time 14:23 Rev Time 0.00
Received By jleahy Date 2021-04-23 Time 14:22 Sent To  
Notes
2021-04-23 14:24:15ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 FLORIDA BUILDING CODE 2020 7TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 7TH ED
 NFPA 70 2017 EDITION
  
 JAKE LEAHY BN, BU, PX
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 ELECTRICAL PERMIT REQUIRED FOR DEMO.
  
 ELECTRICAL PLAN REVIEW NEEDS AN ELECTRICAL PERMIT
 APPLICATION FOR APPROVAL. PLEASE EMAIL THE ELECTRICAL
 PERMIT APPLICATION TO [email protected] AND CC
 [email protected] SO I RECEIVE IT ALSO. WHEN THIS EMAIL
 IS RECEIVED ONE OF THE REVIEWERS WILL APPROVE THE PLAN
 REVIEW.

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2021-04-08 Cont ID  
Sent By ppetty Date 2021-04-08 Time 10:16 Rev Time 0.00
Received By ppetty Date 2021-04-08 Time 10:07 Sent To  
Notes
2021-04-08 10:19:53ELECTRICAL CONTRACTOR REQUIRED FOR REMOVAL OF ALL
 WIREING TO BUILDING PROVIDE RECEPT

Review Stop ENG ENGINEERING CSD
Rev No 3 Status P Date 2021-06-03 Cont ID  
Sent By rrossano Date 2021-06-03 Time   Rev Time 0.00
Received By rrossano Date 2021-06-03 Time   Sent To I
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2021-04-22 Cont ID  
Sent By rrossano Date 2021-04-22 Time   Rev Time 0.00
Received By rrossano Date 2021-04-22 Time   Sent To  
Notes
2021-04-22 08:39:39PLEASE ADDRESS BUILDING COMMENTS.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2021-03-05 Cont ID  
Sent By rrossano Date 2021-03-05 Time   Rev Time  
Received By rrossano Date 2021-03-05 Time   Sent To  
Notes
2021-03-05 07:35:30PLEASE ADDRESS BUILDING DEPT. COMMENTS.

Review Stop HIST HISTORICAL
Rev No 2 Status P Date 2021-04-20 Cont ID  
Sent By aborngra Date 2021-04-20 Time 11:56 Rev Time 0.00
Received By aborngra Date 2021-04-20 Time 11:56 Sent To  
Notes
***NONE***

Review Stop HIST HISTORICAL
Rev No 1 Status F Date 2021-02-23 Cont ID  
Sent By aborngra Date 2021-02-23 Time 13:15 Rev Time 0.00
Received By aborngra Date 2021-02-23 Time 13:15 Sent To  
Notes
2021-02-23 13:15:48THE DEMOLITION OF THE STRUCTURE CANNOT BE APPROVED
 UNTIL PLANS FOR NEW CONSTRUCTION HAVE BEEN APPROVED AND
 READY TO BE ISSUED. THE NEW CONSTRUCTION IS PENDING
 APPROVAL FROM THE HISTORIC PRESERVATION BOARD.

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2021-06-21 Cont ID  
Sent By pvalenti Date 2021-06-21 Time 16:22 Rev Time 0.00
Received By pvalenti Date 2021-06-07 Time 13:04 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2021-06-03 Cont ID  
Sent By pvalenti Date 2021-06-03 Time 08:12 Rev Time 0.00
Received By pvalenti Date 2021-06-02 Time 15:53 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-04-23 Cont ID  
Sent By jleahy Date 2021-04-23 Time 14:24 Rev Time 0.00
Received By jleahy Date 2021-04-19 Time 08:10 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-03-09 Cont ID  
Sent By shill Date 2021-03-09 Time 11:33 Rev Time 0.00
Received By shill Date 2021-02-18 Time 12:43 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2021-02-22 Cont ID  
Sent By pvalenti Date 2021-02-22 Time 08:01 Rev Time 0.00
Received By pvalenti Date 2021-02-22 Time 07:30 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status N Date 2021-04-20 Cont ID  
Sent By aborngra Date 2021-04-20 Time 11:56 Rev Time 0.00
Received By aborngra Date 2021-04-20 Time 11:56 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2021-02-23 Cont ID  
Sent By aborngra Date 2021-02-23 Time 13:16 Rev Time 0.00
Received By aborngra Date 2021-02-23 Time 13:15 Sent To  
Notes
***NONE***