| 2021-02-24 09:45:54 | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. |
| | |
| | FLORIDA BUILDING CODE 2017 6TH EDITION |
| | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED |
| | NFPA 70 2014 EDITION |
| | |
| | JAKE LEAHY BN, BU, PX |
| | ELECTRICAL PLANS EXAMINER II |
| | 561-805-6713 |
| | [email protected] |
| | |
| | 1) PLEASE SHOW A ONE LINE DIAGRAM SHOWING THE |
| | DISCONNECTING MEANS AT EACH BUILDING. 225.32 |
| | |
| | 225.32 LOCATION. THE DISCONNECTING MEANS SHALL BE |
| | INSTALLED EITHER INSIDE OR OUTSIDE OF THE BUILDING OR |
| | STRUCTURE SERVED OR WHERE THE CONDUCTORS PASS THROUGH |
| | THE BUILDING OR STRUCTURE. THE DISCONNECTING MEANS |
| | SHALL BE AT A READILY ACCESSIBLE LOCATION NEAREST THE |
| | POINT OF ENTRANCE OF THE CONDUCTORS. FOR THE PURPOSES |
| | OF THIS SECTION, THE REQUIREMENTS IN 230.6 SHALL BE |
| | UTILIZED. |
| | |
| | 2) PLEASE SHOW THE GROUNDING AT EACH BUILDING FOR EACH |
| | SYSTEM WHERE MULTIPLE SYSTEMS ARE LOCATED IN EACH |
| | BUILDING 690.47 |
| | |
| | 690.47 GROUNDING ELECTRODE SYSTEM. (A) BUILDINGS OR |
| | STRUCTURES SUPPORTING A PV ARRAY. A BUILDING OR |
| | STRUCTURE SUPPORTING A PV ARRAY SHALL HAVE A GROUNDING |
| | ELECTRODE SYSTEM INSTALLED IN ACCORDANCE WITH PART III |
| | OF ARTICLE?250. PV ARRAY EQUIPMENT GROUNDING CONDUCTORS |
| | SHALL BE CONNECTED TO THE GROUNDING ELECTRODE SYSTEM OF |
| | THE BUILDING OR STRUCTURE SUPPORTING THE PV ARRAY IN |
| | ACCORDANCE WITH PART VII OF ARTICLE 250. THIS |
| | CONNECTION SHALL BE IN ADDITION TO ANY OTHER EQUIPMENT |
| | GROUNDING CONDUCTOR REQUIREMENTS IN 690.43(C). THE PV |
| | ARRAY EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED IN |
| | ACCORDANCE WITH 690.45 |
| | |
| | 3) I'M NOT SURE HOW TO DETERMINE THE NUMBER OF ARRAYS |
| | ON EACH BUILDING 740,750,760 (750 STATES 229, -177?) |
| | (740 20, 99?) (760 14, 78?) |
| | |
| | 4) PLEASE INDICATE HOW THE REQUIREMENTS OF LABELING PER |
| | 690.56 (B) AND (C) |
| | |
| | 690.56 IDENTIFICATION OF POWER SOURCES. |
| | (B) FACILITIES WITH UTILITY SERVICES AND PHOTOVOLTAIC |
| | SYSTEMS. PLAQUES OR DIRECTORIES SHALL BE INSTALLED IN |
| | ACCORDANCE WITH 705.10. |
| | (C) BUILDINGS WITH RAPID SHUTDOWN. BUILDINGS WITH PV |
| | SYSTEMS SHALL HAVE PERMANENT LABELS AS DESCRIBED IN |
| | 690.56(C)(1) THROUGH (C)(3). (1) RAPID SHUTDOWN TYPE. |
| | THE TYPE OF PV SYSTEM RAPID SHUTDOWN SHALL BE LABELED |
| | AS DESCRIBED IN 690.56(C)(1)(A) OR (1)(B): |
| | (3) RAPID SHUTDOWN SWITCH. A RAPID SHUTDOWN SWITCH |
| | SHALL HAVE A LABEL LOCATED ON OR NO MORE THAN 1 M (3 |
| | FT) FROM THE SWITCH THAT INCLUDES THE FOLLOWING |
| | WORDING: RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM |
| | |
| | 5) PLEASE INDICATE ON THE PLANS OF EACH BUILDING |
| | INVOLVED FOR THIS SYSTEM THE LOCATION OF THE |
| | DISCONNECTS AND THE IDENTIFICATION OF THEM PER 225.37, |
| | AND 705.10 |
| | |
| | 225.37 IDENTIFICATION. WHERE A BUILDING OR STRUCTURE |
| | HAS ANY COMBINATION OF FEEDERS, BRANCH CIRCUITS, OR |
| | SERVICES PASSING THROUGH IT OR SUPPLYING IT, A |
| | PERMANENT PLAQUE OR DIRECTORY SHALL BE INSTALLED AT |
| | EACH FEEDER AND BRANCH-CIRCUIT DISCONNECT LOCATION |
| | DENOTING ALL OTHER SERVICES, FEEDERS, OR BRANCH |
| | CIRCUITS SUPPLYING THAT BUILDING OR STRUCTURE OR |
| | PASSING THROUGH THAT BUILDING OR STRUCTURE AND THE AREA |
| | SERVED BY EACH. |
| | |
| | 705.10 DIRECTORY. A PERMANENT PLAQUE OR DIRECTORY |
| | DENOTING THE LOCATION OF ALL ELECTRIC POWER SOURCE |
| | DISCONNECTING MEANS ON OR IN THE PREMISES SHALL BE |
| | INSTALLED AT EACH SERVICE EQUIPMENT LOCATION AND AT THE |
| | LOCATION(S) OF THE SYSTEM DISCONNECT(S) FOR ALL |
| | ELECTRIC POWER PRODUCTION SOURCES CAPABLE OF BEING |
| | INTERCONNECTED. THE MARKING SHALL COMPLY WITH |
| | 110.21(B). |
| | |
| | |