Plan Review Details - Permit 21020417
Plan Review Stops For Permit 21020417
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2021-02-16 Cont ID  
Sent By chtroop Date 2021-02-16 Time 13:36 Rev Time 0.00
Received By cthroop Date 2021-02-16 Time 13:34 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-02-16 Cont ID  
Sent By cthroop Date 2021-02-16 Time 11:19 Rev Time 0.00
Received By cthroop Date 2021-02-11 Time 14:34 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2021-02-16 Cont ID  
Sent By cthroop Date 2021-02-16 Time 13:15 Rev Time 0.00
Received By cthroop Date 2021-02-11 Time 14:35 Sent To  
Notes
2021-02-16 13:25:02PLAN REVIEW / PLUMBING / FUEL GAS
  
 CHRISTOPHER S. THROOP, C.B.O.
 PLANS EXAMINER BUILDING - PX3169
 PLANS EXAMINER 1&2 FAMILY - SFP306
 CONSTRUCTION SERVICES DIVISION
 TEL: 561-805-6726
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
 CODES IN EFFECT:
 2017 FLORIDA BUILDING CODE, 6TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 2014 NEC
  
 PROVISO ON PLAN SHEET A3.00.
  
 NOTICE: A SEPERATE GAS PERMIT IS REQUIRED.
  
  
 1. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE
 LENGTH OF ALL CUT SECTIONS OF PIPE PER 2017 FBC FUEL
 GAS, SECS. 402.4.1, 402.4.2. OR 2017 FBC FUEL GAS RES
 SECS. G2413.4.1, G2413.4.2.
  
 2. SUBMIT APPLICABLE GAS TABLES.
  
 3. SUBMIT MANUFACTURERS SPECIFICATION
 SHEETS/INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO
 VERIFY COMPLIANCE WITH 2017 FBC FUEL GAS SEC.305.1 OR
 2017 FBC FUEL GAS RES. SEC. G2408.1.
  
 4. SUBMIT GAS REGULATOR SPECIFICATIONS. 2017 FBC FUEL
 GAS SEC.305.1 OR 2017 FBC FUEL GAS RES. SEC. G2408.1.
  
 5. REGULATORS SHALL HAVE A UNION INSTALLED WITHIN 1
 FOOT OF EITHER SIDE OF THE REGULATOR FBC FG 410.2
  
 6. SUBMIT A COPY OF A HOUSE PLAN SHOWING THE LOCATION
 OF ALL PROPOSED GAS APPLIANCES. THE HOUSE PLAN CAN BE
 HAND DRAWN. WPB AMENDMENTS TO THE FBC SEC. 107.2.1.
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 7. SUBMIT COMBUSTION AIR CALCULATIONS FOR THE PROPOSED
 GAS APPLIANCES. WHERE IS COMBUSTION AIR PROVIDED BY THE
 BUILDINGS MECHANICAL VENTILATION SYSTEM, THE SYSTEM
 SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE IN
 ADDITION TO THE REQUIRED VENTILATION AIR? 2017 FGC
 SEC.304.9.3 OR 2017 FBC R G2407.9.3. COMBINED
 COMBUSTION AIR AND VENTILATION AIR SYSTEM.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
  
  
  
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-02-17 Cont ID  
Sent By lmarchan Date 2021-02-17 Time 15:38 Rev Time 0.00
Received By lmarchan Date 2021-02-08 Time 11:16 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2021-02-17 Cont ID  
Sent By medwards Date 2021-02-17 Time 06:36 Rev Time 0.00
Received By medwards Date 2021-02-17 Time 06:28 Sent To  
Notes
2021-02-17 06:45:50 
  

Review Stop P PLUMBING
Rev No 1 Status P Date 2021-02-16 Cont ID  
Sent By cthroop Date 2021-02-16 Time 13:15 Rev Time 0.00
Received By cthroop Date 2021-02-11 Time 14:35 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-02-17 Cont ID  
Sent By jgomez Date 2021-02-16 Time 13:33 Rev Time 0.00
Received By cthroop Date 2021-02-16 Time 13:33 Sent To  
Notes
2021-02-09 18:46:05HARD COPY DRAWINGS S-1, S-2 AND S-3 HAVE ENGINEER'S
 ORIGINAL/SEAL/SIGNATURE. JG.

Review Stop Z ZONING
Rev No 1 Status P Date 2021-02-17 Cont ID  
Sent By kalexand Date 2021-02-17 Time   Rev Time 0.00
Received By rthermid Date 2021-02-17 Time   Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved