Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2021-09-16 Cont ID  
Sent By rmcphers Date 2021-09-16 Time 10:05 Rev Time 0.00
Received By rmcphers Date 2021-09-16 Time 10:05 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2021-08-12 Cont ID  
Sent By rmcphers Date 2021-08-12 Time 12:48 Rev Time 0.00
Received By rmcphers Date 2021-08-12 Time 12:33 Sent To  
Notes
2021-08-12 12:48:38360 S ROSEMARY - REVISION
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
  
 DRAWINGS AE4.02A, AE4.03A, AE4.04A, AE4.05A, AE4.06A,
 AE4.07A, AE4.08A SHOW A TOTAL OF 27 EV CHARGING STATION
 PARKING SPACES NONE OF WHICH SHOW A CHARGING STATION AT
 A MARKED ACCESSIBLE PARKING SPACE. THE SPACES FOR
 ACCESSIBILITY WILL NEED TO BE MARKED AS AN ACCESSIBLE
 SPACE (SIGNS, STRIPING ETC) THE SAME AS ANY OTHER
 ACCESSIBLE SPACE.
  
 1) THE NUMBER OF ACCESSIBLE AUTOMOBILE CHARGING
 STATIONS SHOULD BE AT LEAST ONE ACCESSIBLE EV CHARGING
 STATION FOR EVERY 25 TOTAL EV CHARGING STATIONS. - YOU
 HAVE 27 CHARGING STATIONS WHICH WILL REQUIRE 2
 ACCESSIBLE CHARGING STATIONS - FBC ACCESSIBILITY 208.2
 (THEY NEED TO BE ON AN ACCESSIBLE ROUTE INTO THE
 BUILDING FBC ACCESSIBILITY 206.2.2)

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2021-06-18 Cont ID  
Sent By rmcphers Date 2021-06-18 Time 15:03 Rev Time 0.00
Received By rmcphers Date 2021-06-17 Time 12:27 Sent To  
Notes
2021-06-18 15:14:41360 S ROSEMARY - REVISION
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) THE NUMBER OF ACCESSIBLE AUTOMOBILE CHARGING
 STATIONS SHOULD BE AT LEAST ONE ACCESSIBLE EV CHARGING
 STATION FOR EVERY 25 TOTAL EV CHARGING STATIONS. - YOU
 HAVE 27 CHARGING STATIONS WHICH WILL REQUIRE 2
 ACCESSIBLE CHARGING STATIONS - FBC ACCESSIBILITY 208.2
 (THEY NEED TO BE ON AN ACCESSIBLE ROUTE INTO THE
 BUILDING FBC ACCESSIBILITY 206.2.2)

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-03-25 Cont ID  
Sent By rmcphers Date 2021-03-25 Time 14:47 Rev Time 0.00
Received By rmcphers Date 2021-03-24 Time 16:05 Sent To  
Notes
2021-03-25 14:35:20360 S ROSEMARY - REVISION
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) THERE ARE QUITE A FEW DRAWING PAGES ADDED FOR
 REVISION - SHOWING NO CLOUDED CHANGES - PLEASE CLOUD
 ALL CHANGES. DRAWINGS SHOULD NOT BE ADDED FOR A
 REVISION REVIEW WITH NO CHANGES FROM THE CITY APPROVED
 DRAWINGS.
 2) I NOTICED THAT A NOTE WAS ADDED TO THE PARKING FLOOR
 PLANS STATING "CAR CHARGING" STATION LOCATIONS - CAR
 CHARGING STATIONS SHOULD HAVE ACCESSIBILITY ACCESS -
 SHOW THE REQUIRED ACCESS ASILE TO THE CHARGING STATION
 - FBC ACCESSIBILITY 201.4

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2021-05-25 Cont ID  
Sent By equinone Date 2021-05-25 Time 11:44 Rev Time 0.00
Received By equinone Date 2021-05-25 Time 10:12 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2021-03-04 Cont ID  
Sent By equinone Date 2021-03-04 Time 15:44 Rev Time 0.00
Received By equinone Date 2021-03-04 Time 09:02 Sent To  
Notes
2021-03-04 15:45:00CODES IN EFFECT
 CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
 FAC = FLORIDA ADMINISTRATIVE CODE
  
 ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
  
  
 1) SHEETS E6.01L AND E9.03 AND E9.04: NEW PANEL
 SCHEDULES FOR H1, L1, AND LSDP ON SHEET E6.01L DO NOT
 MATCH THE H1, L1, AND LSDP PANEL SCHEDULES SUBMITTED ON
 SHEETS E9.03 AND E9.04. SCHEDULES SHOULD BE CONSISTENT.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD
 SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER
 SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN
 THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS
 PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS
 PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR
 UPDATED.
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE
 PREVIOUSLY REVIEWED SHEETS.
 IF THE RESUBMITTAL IS NOT PREPARED BY A DESIGN
 PROFESSIONAL (ARCHITECT OR ENGINEER), AND THE PAGES ARE
 11X17 OR SMALLER, YOU MAY RESUBMIT, ALONG WITH A
 COMPLETED RESUBMITTAL FORM, VIA EMAIL TO
 [email protected]. THE EMAIL SHOULD INCLUDE THE PERMIT
 NUMBER AND "RESUBMITTAL" IN THE SUBJECT LINE. THE
 RESUBMITTAL FORM CAN BE FOUND AT THIS WEBSITE:
  
 HTTPS://WWW.WPB.ORG/GOVERNMENT/DEVELOPMENT-SERVICES/FOR
 MS
  
 ENRIQUE QUINONEZ P.E.
 ELECTRICAL PLANS EXAMINER
 561-805-6746
 [email protected]
  
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2021-04-20 Cont ID  
Sent By mgonzale Date 2021-04-20 Time   Rev Time 1.00
Received By mgonzale Date 2021-04-20 Time   Sent To Z
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 4 Status P Date 2021-09-07 Cont ID  
Sent By pleduc Date 2021-09-07 Time 1 Rev Time 0.00
Received By pleduc Date 2021-09-07 Time 13:11 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2021-08-26 Cont ID  
Sent By pleduc Date 2021-08-26 Time   Rev Time 0.00
Received By pleduc Date 2021-08-26 Time 11:46 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2021-05-25 Cont ID  
Sent By pleduc Date 2021-05-25 Time   Rev Time 0.00
Received By pleduc Date 2021-05-20 Time 10:06 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2021-02-26 Cont ID  
Sent By pleduc Date 2021-02-26 Time   Rev Time 0.00
Received By pleduc Date 2021-02-23 Time 11:46 Sent To  
Notes
2021-02-26 09:58:12THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 1) IT WAS MY UNDERSTANDING DURING A ZOOM TYPE MEETING
 WITH ALL PARTIES THAT THE CORE BUILDING WAS GOING TO
 INCLUDE THE ADDED CORRIDORS ON 9 THRU 18.
  
 PLEASE REVIEW AND CORRECT OR PROVIDE A DETAILED
 NARRATIVE OF HOWAND WHEN THE CORRIDOR CONSTRUCTION
 WHICH IS CURRENTLY BEING CONSTRUCTED IS GOING TO BE
 ACCOUNTED FOR.
  
  
 2) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2021-09-16 Cont ID  
Sent By rmcphers Date 2021-09-16 Time 10:06 Rev Time 0.00
Received By rmcphers Date 2021-08-25 Time 13:09 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2021-08-19 Cont ID  
Sent By medwards Date 2021-08-19 Time 10:03 Rev Time 0.00
Received By medwards Date 2021-07-30 Time 10:04 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-06-22 Cont ID  
Sent By jesmith Date 2021-06-22 Time 17:13 Rev Time 0.00
Received By jesmith Date 2021-06-22 Time 17:13 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-04-20 Cont ID  
Sent By lmarchan Date 2021-04-20 Time 16:24 Rev Time 0.00
Received By lmarchan Date 2021-02-08 Time 16:54 Sent To  
Notes
2021-02-19 18:04:49FEES PAID ON 02/18/21. JG.

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2021-08-19 Cont ID  
Sent By medwards Date 2021-08-19 Time 10:00 Rev Time 0.00
Received By medwards Date 2021-08-19 Time 09:39 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2021-06-08 Cont ID  
Sent By medwards Date 2021-06-08 Time 13:49 Rev Time 0.00
Received By medwards Date 2021-06-08 Time 13:49 Sent To  
Notes
2021-06-08 13:49:241ST REVIEW FBC-2020 MECHANICAL
 PERMIT-21020368
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE
 FBC M- FLORIDA MECHANICAL CODE
 FBC EC- FLORIDA ENERGY CONSERVATION
 FBC FG- FLORIDA FUEL GAS
 FBC EX- FLORIDA EXISTING BUILDING CODE
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) SHEET M6.01: THE FLOOR TOILET EXHAUST CALCULATION IN
 THE MECHANICAL ROOM IS CALLING FOR 330 CFM?S. THE
 ACTUAL SHOULD BE COUNTED AS (4) WOMEN = 200CFM; (4) MEN
 = 200 CFM?S = 400 CFM?S TOTAL.
  
 2) SHEET M2.04: THE RATED LID OVER FIRE PUMP ROOM MUST
 BE PROTECTED WHERE THE EF-1-3 PENETRATES THE LID. FBC
 M607
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM.
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2021-04-06 Cont ID  
Sent By medwards Date 2021-02-26 Time 08:53 Rev Time 0.00
Received By medwards Date 2021-02-25 Time 09:43 Sent To  
Notes
2021-04-06 16:03:111ST REVIEW FBC-2020 MECHANICAL
 PERMIT-21020368
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE
 FBC M- FLORIDA MECHANICAL CODE
 FBC EC- FLORIDA ENERGY CONSERVATION
 FBC FG- FLORIDA FUEL GAS
 FBC EX- FLORIDA EXISTING BUILDING CODE
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) SHEET M1.01: LEVEL 1B- DUCTWORK SECTION: PLEASE
 REMOVE ALL PIPING THAT IS IN STAIRWAY FBC 1023.5
  
 2) SHEET M1.01: DUCT WORK PENETRATING THE FIRE COMMAND
 ROOM (2) HOUR RATED WALL SHALL HAVE FIRE DAMPERS. FBC M
 607
  
 3) SHEET M1.01: PLEASE SHOW THE REQUIRED PROTECTION AT
 THE (2) HOUR RATED WALL WHERE THE OUTDOOR AIR DUCT
 PENETRATES THE RATED WALL. FBC M 607
  
 4) SHEET M1.01: PLEASE SHOW THE PENETRATION PROTECTION
 IN THE RATED WALL WHERE EF-1-2, EF-1-4 AND EF-1-5
 PENETRATE THE RATED WALL. FBC M 607
  
 5) SHEET M1.02: FRESH AIR INTAKE DUCT IS PENETRATING A
 RATED WALL IN ROOM 205 (STORAGE) PLEASE SHOW THE
 REQUIRED PROTECTION. FBC M 607
  
 6) PLEASE SHOW CONDENSATE DISPOSAL LOCATION FOR ALL
 CU?S IN THE GARAGE. FBC M 307
  
 7) SHEET M1.03PLEASE SHOW PROTECTION FOR ALL DUCT WORK
 PENETRATING RATED FLOOR/CEILING AREAS. FBC M 607
  
 8) SHEET M1.04: PLEASE SHOW PROTECTION WHERE DUCTWORK
 PENETRATES RATED WALLS. FBC M 607
  
 9) SHEET M1.05: PLEASE SHOW PROTECTION WHERE DUCTWORK
 PENETRATES RATED WALLS. FBC M 607
  
 10) SHEET M1.05: IT APPEARS THAT THE FRESH AIR AT UNIT
 AH-DX-4-3 IS BEING DUCTED INTO THE STAIRWAY. PLEASE
 REMOVE. FBC 1023.5
  
 11) SHEET M1.05: PLEASE EXPLAIN THE DUCTWORK
 PENETRATING THE RATED WALL IN THE ELEVATOR 7 AREA AND
 SHOW THE PROTECTION WHERE THE DUCTWORK PENETRATES THE
 RATED WALL.
  
 12) SHEET M1.05: PLEASE SHOW PROTECTION FOR THE RATED
 WALL WHERE THE O.A. DUCT PENETRATES THE RATED WALL AT
 BF-1.
  
 13) SHEET M8.01 PLEASE SHOW THE CALCULATIONS HOW THE
 POST FIRE SMOKE PURGE FANS WERE REDUCED BY 2 FANS AND A
 TOTAL OF 23,200 CFM. FBC 107.2.1
  
 14) SHEET M8.02: PLEASE SHOW HOW THE ELECTRIC DUCT
 HEATER SCHEDULE WAS REDUCED BY 3600 CFM. FBC 107.2.1
  
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM.
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  
2021-02-26 08:53:14 
  

Review Stop P PLUMBING
Rev No 3 Status P Date 2021-08-12 Cont ID  
Sent By pvalenti Date 2021-08-12 Time 17:03 Rev Time 0.00
Received By jesmith Date 2022-08-09 Time 16:10 Sent To  
Notes
2021-08-12 17:04:15PLUMBING COMMENTS: APPROVED
  
 ALL WORK PER STATE AND CITY CODES SUBJECT TO FIELD
 INSPECTOR'S APPROVAL
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 PROVIDE LEAD FREE PRESSURE REDUCING VALVES ON ALL
 SERVICE OUTLETS ON THE DISCHARGE SIDE OF THE DOMESTIC
 BOOSTER PUMPS COMPLYING WITH THE 2017 FLORIDA PLUMBING
 CODE (SEE NOTES ON P0.01, P9.01 AND P9.04).
  
 JERALD SMITH
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
 EMAIL [email protected]
 MOBILE 561-243-0882
 PLEASE NOTE THAT I TYPICALLY WORK ON TUESDAYS AND
 THURSDAYS
  
 21020368 360 S ROSEMARY AVE

Review Stop P PLUMBING
Rev No 2 Status F Date 2021-06-22 Cont ID  
Sent By jesmith Date 2021-06-22 Time 17:11 Rev Time 0.00
Received By jesmith Date 2021-05-25 Time 16:24 Sent To  
Notes
2021-06-22 17:11:37CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1
 WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL
 MANUAL REVISED 2017
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC ACC = FLORIDA ACCESSIBILITY CODE 2017 6TH EDITION
 FBC PL = FLORIDA PLUMBING CODE 2017 6TH EDITION
 FAC= FLORIDA ADMINISTRATIVE CODE
 FS = FLORIDA STATUTES
  
 21020368 360 S ROSEMARY AVE
 2ND REVIEW
 PLUMBING COMMENTS: DENIED
  
 REFER TO RED LINED PLANS P0.01 AND P903.1
  
 1. PROVIDE ON P0.01, A NOTE STATING ?PROVIDE LEAD FREE
 PRESSURE REDUCING VALVES WITH STRAINERS ON ALL SERVICE
 OUTLETS ON THE DISCHARGE SIDE OF THE DOMESTIC BOOSTER
 PUMPS COMPLYING WITH THE 2017 FLORIDA PLUMBING CODE?.
 (COMPLIED ON P9.01 AND P9.04.
  
 2. P9.03: SANITARY RISER SAN 1; NOTE, 903.1 HAS BEEN
 REVISED BUT STILL DOES NOT ACCURATELY DESCRIBE WHAT IS
 HAPPENING.
 A) VENT STACK SHALL CONNECT VERTICALLY TO THE
 HORIZONTAL DRAIN PER FBC PL 905.3 AND 905.4.
 B) SHOW AT TOP OF RISER WHERE CONNECTED TO THE
 HORIZONTAL BRANCH THAT THE WASTE STACK AND VENT STACK
 CONTINUE VERTICALLY TO SERVICE THE TYPICAL RESTROOMS
 ABOVE. REFERENCE P9.01 AND SIZE THE STACKS.
 C)CONFIRM AND INDICATE FLOOR LEVELS WHERE NOTED.
 D)ADDITIONAL CLARIFICATIONS NEEDED: SEE P4.08A FOR 6"
 HORIZONTAL BRANCH WITH LATERALS TO STACKS FOR FUTURE.
 SEE P4.09A SHOWING STACKS SAN 1A, 1B, 1C AND 1D. SEE
 P9.01 SANITARY RISER FOR SEPARATE STACKS. RECONCILE
 PLEASE.
  
  
 END OF COMMENTS.
 A COMPREHENSIVE REVIEW COULD NOT BE ACCOMPLISHED AT
 THIS TIME. PLEASE RESUBMIT CLEARLY LEGIBLE PLANS AND A
 RESPONSE NARRATIVE ADDRESSING THE PLUMBING COMMENTS
 FROM THE FIRST REVIEW.
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.ALL PLANS TO BE SIGNED
 AND SEALED BY THE DESIGNER AS REQUIRED BY FAC AND FS.
  
  
 JERALD SMITH
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
 EMAIL [email protected]
 MOBILE 561-243-0882
 PLEASE NOTE THAT I TYPICALLY WORK ON TUESDAYS AND
 THURSDAYS
  
 21020368 360 S ROSEMARY AVE
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2021-03-16 Cont ID  
Sent By jesmith Date 2021-03-16 Time 14:08 Rev Time 0.00
Received By jesmith Date 2021-03-02 Time 15:49 Sent To  
Notes
2021-03-16 14:08:51CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1
 WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL
 MANUAL REVISED 2017
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC ACC = FLORIDA ACCESSIBILITY CODE 2017 6TH EDITION
 FBC PL = FLORIDA PLUMBING CODE 2017 6TH EDITION
 FAC= FLORIDA ADMINISTRATIVE CODE
 FS = FLORIDA STATUTES
  
 21020368 360 S ROSEMARY AVE
 1ST REVIEW
 PLUMBING COMMENTS: DENIED
  
 GENERAL: PER WPB FBC 107.2.1, CLOUD AND TAG ALL
 REVISIONS ON THE PLANS.
  
 1.RE: MEPFPT
 A.P1.01 ASI#1/REV 4; UPDATED ELEVATOR SUMP PUMPS AND
 SIZES. PLAN SHOWS COLLECTION SYSTEMS FROM SUMP PUMPS TO
 A SANITARY CONNECTION. PIPING IS NOT SIZED. PER WPB FBC
 107.2.1, PROVIDE 1) SIZING OF PIPING 2) A DETAIL OF
 CONNECTION(S) TO SANITARY SYSTEM. CLOUD AND TAG.
 B.P1.02 ASI#1/REV 7; UPDATED ELEVATOR SUMP PUMPS AND
 SIZES. NOT ADDRESSED. PER WPB FBC 107.2.1, CLARIFY.
 C.P1.03 ASI#1/REV 4; UPDATED ELEVATOR SUMP PUMPS AND
 SIZES. NOT ADDRESSED. PER WPB FBC 107.2.1, CLARIFY.
 E.P-1.01 ASI#2/REV 5; A) REVISED STORM SIZE TO 12 INCH
 FOR BOTH HIGH AND LOW ZONE. NOTED HIGH ZONE IS 12 INCH,
 BUT LOW ZONE IS 8 INCH. PER WPB FBC 107.2.1, CLARIFY.
 PER WPB FBC 107.2.1, IDENTIFY PIPING SECTIONS WITH REV
 5 TAG AND CLOUD. B) ADDED CIVIL REFERENCE TO PIPING IN
 LOADING DOCK AND SKETCH OUT PIPING ON PLANS. CIVIL
 REFERENCE NOTED. SKETCHED PIPE NOTED. PLUMBING DRAWINGS
 P4.01, P1.01 AND P9.02, SHOW PIPING THAT IS ALSO SHOWN
 ON CIVIL DRAWING C5.00. CLEARLY INDICATE ON THE PLANS
 WHICH IS PART OF THE BUILDING SYSTEM AND WHICH IS PART
 OF THE SITE WORK. PER WPB FBC 107.2.1, IDENTIFY PIPING
 CONNECTION WITH REV 5 TAG AND CLOUD. C) REVISED
 PLUMBING WORK OUTSIDE OF STAIR TOWER #2. PER WPB FBC
 107.2.1, IDENTIFY PIPING WITH REV 5 TAG AND CLOUD. I
 ONLY SEE REV 3 NOTED IN THIS AREA. PER WPB FBC 107.2.1,
 IDENTIFY PIPING CONNECTION WITH REV 5 TAG AND CLOUD. D)
 ADDED CD PIPING CONNECTION OUTSIDE ELEVATOR LOBBY. DO
 NOT SEE ADDED CONNECTION. PER WPB FBC 107.2.1, IDENTIFY
 PIPING CONNECTION WITH REV 5 TAG AND CLOUD.
 F.P-1.02 ASI#2/REV 5; ASI#2/REV 5 NOT NOTED ON PLAN.
 ADD REV 5 TO PLAN AND A) REVISED PLUMBING WORK OUTSIDE
 OF STAIR TOWER #2. PER WPB FBC 107.2.1, IDENTIFY PIPING
 WITH REV 5 TAG AND CLOUD. B) ADDED CD PIPING CONNECTION
 OUTSIDE ELEVATOR LOBBY. DO NOT SEE ADDED CONNECTION.
 PER WPB FBC 107.2.1, IDENTIFY PIPING CONNECTION WITH
 REV 5 TAG.
 G.P-1.03 ASI#2/REV 2; A) REVISED PLUMBING WORK OUTSIDE
 OF STAIR TOWER #2. PER WPB FBC 107.2.1, IDENTIFY PIPING
 WITH REV 2 TAG. B) ADDED CD PIPING CONNECTION OUTSIDE
 ELEVATOR LOBBY. DO NOT SEE ADDED CONNECTION. PER WPB
 FBC 107.2.1, IDENTIFY PIPING CONNECTION WITH REV 2 TAG
 AND CLOUD.
 H.P4.01A ASI#2/REV 8; A) REVISED STORM SIZE TO 12 INCH
 FOR BOTH HIGH AND LOW ZONE. B) REVISED PLUMBING WORK
 OUTSIDE OF STAIR TOWER #2. PER WPB FBC 107.2.1,
 IDENTIFY PIPING WITH REV 2 TAG AND CLOUD. C) ADDED CD
 PIPING CONNECTION OUTSIDE ELEVATOR LOBBY. DO NOT SEE
 ADDED CONNECTION. PER WPB FBC 107.2.1, IDENTIFY PIPING
 CONNECTION WITH REV 2 TAG AND CLOUD.
 I.P4.01B ASI#2/REV 8; REVISED FUEL PIPE ROUTING.
 ASI#2/REV 8 IS NOT NOTED ON THE PLAN. PER WPB FBC
 107.2.1, ADD TO PLAN AND IDENTIFY PIPING WITH REV 8 TAG
 AND CLOUD OR MATCH UP WITH ASI#2 REV 5 NOTED ON PLANS.
 J.P4.02A ASI#2/REV 8; ASI#2/REV 8 IS NOT NOTED ON THE
 PLAN. PER WPB FBC 107.2.1, ADD TO PLAN AND A) REVISED
 PLUMBING WORK OUTSIDE OF STAIR TOWER #2. PER WPB FBC
 107.2.1, IDENTIFY PIPING WITH REV 8 TAG AND CLOUD. B)
 ADDED CD PIPING CONNECTION OUTSIDE ELEVATOR LOBBY. DO
 NOT SEE ADDED CONNECTION. PER WPB FBC 107.2.1, IDENTIFY
 PIPING CONNECTION WITH REV 8 TAG AND CLOUD. C) REVISE
 REVISION SCHEDULE TO REFLECT OR MATCH UP WITH ASI#2 REV
 5 NOTED ON PLANS, CLOUD AND TAG.
 K.P4.03A ASI#2/REV 5; ASI#2/REV 5 IS NOT NOTED ON THE
 PLAN. PER WPB FBC 107.2.1, ADD TO PLAN AND A) REVISED
 PLUMBING WORK OUTSIDE OF STAIR TOWER #2. PER WPB FBC
 107.2.1, IDENTIFY PIPING WITH REV 5 TAG AND CLOUD. B)
 ADDED CD PIPING CONNECTION OUTSIDE ELEVATOR LOBBY. DO
 NOT SEE ADDED CONNECTION. PER WPB FBC 107.2.1, IDENTIFY
 PIPING CONNECTION WITH REV 5 TAG AND CLOUD. C) REVISE
 REVISION SCHEDULE TO REFLECT OR MATCH UP WITH ASI#2 REV
 4 NOTED ON PLANS, CLOUD AND TAG.
 L.P4.04A ASI#2/REV 5; ASI#2/REV 5 IS NOT NOTED ON THE
 PLAN. PER WPB FBC 107.2.1, ADD TO PLAN AND A) REVISED
 PLUMBING WORK OUTSIDE OF STAIR TOWER #2. PER WPB FBC
 107.2.1, IDENTIFY PIPING WITH REV 5 TAG AND CLOUD. B)
 ADDED CD PIPING CONNECTION OUTSIDE ELEVATOR LOBBY. DO
 NOT SEE ADDED CONNECTION. PER WPB FBC 107.2.1, IDENTIFY
 PIPING CONNECTION WITH REV 5 TAG AND CLOUD. C) REVISE
 REVISION SCHEDULE TO REFLECT OR MATCH UP WITH ASI#2 REV
 4 NOTED ON PLANS, CLOUD AND TAG.
 M.P4.05A ASI#2/REV 4; A) REVISED PLUMBING WORK OUTSIDE
 OF STAIR TOWER #2. PER WPB FBC 107.2.1, IDENTIFY PIPING
 WITH REV 4 TAG AND CLOUD. B) ADDED CD PIPING CONNECTION
 OUTSIDE ELEVATOR LOBBY. DO NOT SEE ADDED CONNECTION.
 PER WPB FBC 107.2.1, IDENTIFY PIPING CONNECTION WITH
 REV 4 TAG AND CLOUD.
 N.P4.06A ASI#2/REV 5; A) REVISED PLUMBING WORK OUTSIDE
 OF STAIR TOWER #2. PER WPB FBC 107.2.1, IDENTIFY PIPING
 WITH REV 5 TAG AND CLOUD. B) ADDED CD PIPING CONNECTION
 OUTSIDE ELEVATOR LOBBY. DO NOT SEE ADDED CONNECTION.
 PER WPB FBC 107.2.1, IDENTIFY PIPING CONNECTION WITH
 REV 5 TAG AND CLOUD.
 O.P4.07A ASI#2/REV 5; ASI#2/REV 5 IS NOT NOTED ON THE
 PLAN. PER WPB FBC 107.2.1, ADD TO PLAN AND A) REVISED
 PLUMBING WORK OUTSIDE OF STAIR TOWER #2. PER WPB FBC
 107.2.1, IDENTIFY PIPING WITH REV 5 TAG AND CLOUD. B)
 ADDED CD PIPING CONNECTION OUTSIDE ELEVATOR LOBBY. DO
 NOT SEE ADDED CONNECTION. PER WPB FBC 107.2.1, IDENTIFY
 PIPING CONNECTION WITH REV 5 TAG AND CLOUD. C) REVISE
 REVISION SCHEDULE TO REFLECT OR MATCH UP WITH ASI#2 REV
 4 NOTED ON PLAN REVISION SCHEDULE, CLOUD AND TAG.
 P.P4.08A ASI#2/REV 4; A) REVISED PLUMBING WORK OUTSIDE
 OF STAIR TOWER #2. PER WPB FBC 107.2.1, IDENTIFY PIPING
 WITH REV 4 TAG AND CLOUD. B) ADDED CD PIPING CONNECTION
 OUTSIDE ELEVATOR LOBBY. DO NOT SEE ADDED CONNECTION.
 PER WPB FBC 107.2.1, IDENTIFY PIPING CONNECTION WITH
 REV 4 TAG AND CLOUD.
 Q.P9.04 ASI#2/REV 2; REVISED CD ISO. PER WPB FBC
 107.2.1, CLOUD CHANGES AND TAG REV 2. ADDITIONALLY,
 FILL IN MISSING SPOOLS TO PROVIDE COMPLETE DRAWING.
 R.P1.01 ASI#2R/REV 5; ASI#2R/REV 5 IS NOT NOTED ON THE
 PLAN. PER WPB FBC 107.2.1, ADD TO PLAN AND A) ADDED DAY
 TANK FOR GENERATOR. PER WPB FBC 107.2.1, IDENTIFY DAY
 TANK WITH REV 5 TAG AND CLOUD. B) ADDED CD PIPING AND
 STORM PIPING AS SHOWN ON CIVIL PLANS IN LOADING DOCK.
 DO NOT SEE ADDED CONNECTIONS. PER WPB FBC 107.2.1,
 IDENTIFY PIPING CONNECTIONS WITH REV 5 TAG AND CLOUD.
 C) NOTE ELIMINATION OF ST-1 WITH REV 5 TAG AND CLOUD.
 D) REVISE REVISION SCHEDULE TO REFLECT OR MATCH UP WITH
 ASI#2R REV 6 NOTED ON PLAN REVISION SCHEDULE, CLOUD AND
 TAG.
 S.P1.02 ASI#2R/REV 5; ASI#2R/REV 5 IS NOT NOTED ON THE
 PLAN. PER WPB FBC 107.2.1, ADD TO PLAN AND A) ADDED CD
 CONNECTION. PER WPB FBC 107.2.1, IDENTIFY CD CONNECTION
 WITH REV 5 TAG AND CLOUD. B) MOVED STORM PIPING TO
 TRENCH DRAIN. PER WPB FBC 107.2.1, IDENTIFY WITH REV 5
 TAG AND CLOUD. C) SHIFTED STORM RISERS AND ELIMINATED
 ST-9. ST-1 IS STILL SHOWN ON PLAN. CLARIFY. NOTE
 CHANGES WITH REV 5 TAG AND CLOUD. D) REVISE REVISION
 SCHEDULE TO REFLECT OR MATCH UP WITH ASI#2R REV 3 NOTED
 ON PLAN REVISION SCHEDULE, CLOUD AND TAG. PLEASE NOTE
 THAT P1.03, P1.04 AND P1.05 ARE STILL SHOWING ST-1
 STORM RISER. PER WPB FBC 107.2.1, CLARIFY.
 ADDITIONALLY, PER WPB FBC 107.2.1, REVIEW PLAN SHEETS
 P1.06, P1.07, P-1.08, P1.09 AND ANY OTHER POTENTIALLY
 AFFECTED PLANS FOR ANY NOTE OF STORM RISER ST-9, REVISE
 AND RESUBMIT AS REQUIRED.
 T.P4.01A ASI#2R/REV 5; ASI#2R/REV 5 IS NOT NOTED ON THE
 PLAN. PER WPB FBC 107.2.1, ADD TO PLAN AND PER WPB FBC
 107.2.1, IDENTIFY CHANGES WITH REV 5 TAG AND CLOUD.
 REVISE REVISION SCHEDULE TO REFLECT OR MATCH UP WITH
 ASI#2R REV 9 NOTED ON PLAN REVISION SCHEDULE, CLOUD AND
 TAG. ADDITIONALLY, ASI#2R/REV 9 IS INDICATED IN THE
 FUEL TANK ROOM. PER WPB FBC 107.2.1, CLARIFY.
 U.P4.02A ASI#2R/REV 5; ASI#2R/REV 5 IS NOT NOTED ON THE
 PLAN. PER WPB FBC 107.2.1, ADD TO PLAN AND PER WPB FBC
 107.2.1, IDENTIFY CHANGES WITH REV 5 TAG AND CLOUD.
 REVISE REVISION SCHEDULE TO REFLECT OR MATCH UP WITH
 ASI#2R REV 6 NOTED ON PLAN REVISION SCHEDULE, CLOUD AND
 TAG.
 V.P4.03A ASI#2R/REV 5; PER WPB FBC 107.2.1, IDENTIFY
 CHANGES WITH REV 5 TAG AND CLOUD.
 W.P4.04A ASI#2R/REV 5; PER WPB FBC 107.2.1, IDENTIFY
 CHANGES WITH REV 5 TAG AND CLOUD.
 X.P4.05A ASI#2R/REV 5; PER WPB FBC 107.2.1, IDENTIFY
 CHANGES WITH REV 5 TAG AND CLOUD.
 Y.P4.06A ASI#2R/REV 5; ASI#2R/REV 5 IS NOT NOTED ON THE
 PLAN. PER WPB FBC 107.2.1, ADD TO PLAN AND PER WPB FBC
 107.2.1, IDENTIFY CHANGES WITH REV 5 TAG AND CLOUD.
 REVISE REVISION SCHEDULE TO REFLECT OR MATCH UP WITH
 ASI#2R REV 6 NOTED ON PLAN REVISION SCHEDULE, CLOUD AND
 TAG.
 Z.P4.07A ASI#2R/REV 5; PER WPB FBC 107.2.1, IDENTIFY
 CHANGES WITH REV 5 TAG AND CLOUD.
 AA.P4.08A ASI#2R/REV 5; PER WPB FBC 107.2.1, IDENTIFY
 CHANGES WITH REV 5 TAG AND CLOUD.
 BB.P4.06A ASI#4/REV 7; ASI#4/REV 7 IS NOT NOTED ON THE
 PLAN. THERE IS AN ASI#5/REV 6 IN THE REVISION SCHEDULE.
 PER WPB FBC 107.2.1, CLARIFY, IDENTIFY CHANGES WITH REV
 7, TAG AND CLOUD. REVISE REVISION SCHEDULE TO REFLECT
 OR MATCH UP WITH ASI#5/REV 6 NOTED ON PLAN REVISION
 SCHEDULE, CLOUD AND TAG.
 CC.P4.07A ASI#4/REV 6; ASI#4/REV 6 IS NOT NOTED ON THE
 PLAN. THERE IS AN ASI#5/REV 6 IN THE REVISION SCHEDULE.
 PER WPB FBC 107.2.1, CLARIFY, IDENTIFY CHANGES WITH REV
 6, TAG AND CLOUD. REVISE REVISION SCHEDULE TO REFLECT
 OR MATCH UP WITH ASI#5/REV 6 NOTED ON PLAN REVISION
 SCHEDULE, CLOUD AND TAG.
 DD.P4.08A ASI#4/REV 6; ASI#4/REV 6 IS NOT NOTED ON THE
 PLAN. THERE IS AN ASI#5/REV 6 IN THE REVISION SCHEDULE.
 PER WPB FBC 107.2.1, CLARIFY, IDENTIFY CHANGES WITH REV
 6, TAG AND CLOUD. REVISE REVISION SCHEDULE TO REFLECT
 OR MATCH UP WITH ASI#5/REV 6 NOTED ON PLAN REVISION
 SCHEDULE, CLOUD AND TAG.
 EE.P4.09 ASI#4/REV 2; ASI#4/REV 2 IS NOT NOTED ON THE
 PLAN. THERE IS AN ASI#5/REV 2 IN THE REVISION SCHEDULE.
 PER WPB FBC 107.2.1, CLARIFY, IDENTIFY CHANGES WITH REV
 2, TAG AND CLOUD. REVISE REVISION SCHEDULE TO REFLECT
 OR MATCH UP WITH ASI#5/REV 2 NOTED ON PLAN REVISION
 SCHEDULE, CLOUD AND TAG.
 FF.P4.07A ASI#4/REV 6; ASI#4/REV 6 IS NOT NOTED ON THE
 PLAN. THERE IS AN ASI#5/REV 6 IN THE REVISION SCHEDULE.
 PER WPB FBC 107.2.1, CLARIFY, IDENTIFY CHANGES WITH REV
 6, TAG AND CLOUD. REVISE REVISION SCHEDULE TO REFLECT
 OR MATCH UP WITH ASI#5/REV 6 NOTED ON PLAN REVISION
 SCHEDULE, CLOUD AND TAG.
 GG.P9.02 ASI#4/REV 3; ASI#4/REV 3 IS NOT NOTED ON THE
 PLAN. THERE IS AN ASI#5/REV 3 IN THE REVISION SCHEDULE.
 PER WPB FBC 107.2.1, CLARIFY, IDENTIFY CHANGES WITH REV
 3, TAG AND CLOUD. REVISE REVISION SCHEDULE TO REFLECT
 OR MATCH UP WITH ASI#5/REV 3 NOTED ON PLAN REVISION
 SCHEDULE, CLOUD AND TAG.
 HH.P0.02 ASI#9/REV 5; PER WPB FBC 107.2.1, IDENTIFY
 CHANGES WITH REV 5 TAG AND CLOUD.
 II.P4.10 ASI#10/REV 2; PER WPB FBC 107.2.1, IDENTIFY
 CHANGES WITH REV 2 TAG AND CLOUD.
  
 2.DOMESTIC PUMP SYSTEM IS DESIGNED AT 246 TDH WHICH IS
 THE EQUIVALENT OF 107 PSI ADDED TO THE INCOMING
 PRESSURE SUPPLIED BY THE CITY AT THE PUMP.
 NOTE FBC PL 604.8 WATER PRESSURE-REDUCING VALVE OR
 REGULATOR. WHERE WATER PRESSURE WITHIN A BUILDING
 EXCEEDS 80 PSI (552 KPA) STATIC, AN APPROVED WATER
 PRESSURE-REDUCING VALVE CONFORMING TO ASSE 1003 OR CSA
 B356 WITH STRAINER SHALL BE INSTALLED TO REDUCE THE
 PRESSURE IN THE BUILDING WATER DISTRIBUTION PIPING TO
 NOT GREATER THAN 80 PSI (552 KPA) STATIC.
 EXCEPTION: SERVICE LINES TO SILL COCKS AND OUTSIDE
 HYDRANTS, AND MAIN SUPPLY RISERS WHERE PRESSURE FROM
 THE MAINS IS REDUCED TO 80 PSI (552 KPA) OR LESS AT
 INDIVIDUAL FIXTURES.
 ADDITIONALLY NOTE THAT MANY MANUFACTURER?S PRODUCT?S
 (IE. FAUCETS, FLUSH VALVES, DRINKING FOUNTAINS, WASHING
 MACHINES, SHOWER VALVES, ETC.) SPECIFICALLY STATE THAT
 IF WATER PRESSURE EXCEEDS A CERTAIN PRESSURE (IE. 65
 PSI) THEN THE WARRANTY MAY BE VOIDED. PLEASE SEE FBC PL
 303.2 INSTALLATION OF MATERIALS. ALL MATERIALS USED
 SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE
 STANDARDS UNDER WHICH THE MATERIALS ARE ACCEPTED AND
 APPROVED. IN THE ABSENCE OF SUCH INSTALLATION
 PROCEDURES, THE MANUFACTURER?S INSTRUCTIONS SHALL BE
 FOLLOWED. WHERE THE REQUIREMENTS OF REFERENCED
 STANDARDS OR MANUFACTURER?S INSTALLATION INSTRUCTIONS
 DO NOT CONFORM TO MINIMUM PROVISIONS OF THIS CODE, THE
 PROVISIONS OF THIS CODE SHALL APPLY.
 PER WPB FBC 107.2.1, INDICATE SERVICE PRESSURE AT EACH
 FLOOR ON DOMESTIC WATER RISER DIAGRAM. ADDITIONALLY,
 PROVIDE SUCTION AND DISCHARGE PRESSURES AT THE DOMESTIC
 BOOSTER PUMP. SPECIFY AND PROVIDE LEAD FREE PRESSURE
 REDUCING VALVES WITH STRAINERS AT SERVICE OUTLET(S) ON
 THE HIGH PRESSURE SIDE OF THE DOMESTIC BOOSTER PUMP
 SYSTEMS IN ACCORDANCE WITH FBC PL 604.8 AND 302.2
  
 3.WATER RISER DIAGRAM APPEARS TO BE INCOMPLETE AND/OR
 DOES NOT NECESSARILY REFLECT THE PLUMBING FLOOR
 PLAN(S). PER WPB FBC 107.2.1, PROVIDE COMPLETE RISER
 DIAGRAM(S) SHOWING ALL FLOORS AND DISTRIBUTION. IF
 NECESSARY, PROVIDE SUPPLEMENTAL SCHEMATIC(S) TO PROVIDE
 CLARIFICATION. SHOW ALL SERVICE OUTLETS BOTH FOR SHELL
 AND FUTURE. SHOW REQUIRED PRVS.THERE ARE DISCONNECTED
 SPOOLS AS WELL AS SYMBOLS WITH NO PIPING TO THEM. PER
 WPB FBC 107.2.1, REMOVE ANY DISCONNECTED ITEMS OR
 PROVIDE CONNECTIONS TO THE SAME. SHOW ALL
  
 4.INDICATE ALL FLOOR LEVELS ON ALL RISER DIAGRAMS.
  
 5.PROVIDE COMPLETE, SIZED SANITARY BUILDING RISER
 DIAGRAM TO INCLUDE ALL BUILDING DRAIN, POINT OF
 CONNECTION TO BUILDING SEWER, BRANCHES OF THE BUILDING
 DRAIN, SOIL AND WASTE STACKS, FIXTURE BRANCHES, FIXTURE
 DRAINS, INDIVIDUAL VENTS, BRANCH VENTS, VENT STACKS,
 STACK VENTS. AT TYPICAL
  
 6.LABEL RISER DIAGRAMS INDICATING FIXTURE/EQUIPMENT
 EACH INLET OR OUTLET IS SERVICING
  
 7.PROVIDE SIZED SANITARY AND WATER RISER DIAGRAMS FOR
 CORE AREA BATHROOMS/JANITOR ROOMS. PROVIDE TYPICAL FOR
 FLOORS 9, 10, 12, 13, 14 AND 16 AND A SEPARATE FOR
 FLOORS 11, 15 AND 17 IF REQUIRED; SEE NOTE*
 *JANITOR?S ROOM, FLOORS 9 THROUGH 17. SHEET AE4.10
 PRESENTS AS ALL FLOORS ARE TYPICAL, BUT AE6.02 FINISH
 SCHEDULE INDICATES JANITOR?S ROOMS ON FLOORS 9 (RM
 907), 10 (RM 1007), 12 (RM 1206), 13 (RM 1306), 14 (RM
 1406) AND 16 (RM 1606) AND NO MENTION OF JANITOR?S
 ROOMS ON FLOORS 11,15 AND 17. PER WPB FBC 107.2.1,
 CLARIFY AND RECONCILE.
  
 8.PLEASE NOTE THAT THE FOLLOWING PLUMBING PLAN SHEETS
 WHICH ARE LISTED ON SHEET G10.03 ARE NOT INCLUDED IN
 THE CURRENT SUBMITTED DRAWINGS: P0.01, P1.06, P1.07,
 P1.08, P1.09, P1.10, P1.11, P4.01, P4.02B, P4.03B,
 P4.04B, P4.07B, P4.08B, P4.13, P5.01, P5.02, P9.01, AND
 P9.03. PER WPB FBC 107.2.1, PROVIDE THE NOTED
 DOCUMENTS.
 PLEASE NOTE THERE ARE OTHER SHEETS MISSING IN OTHER
 DISCIPLINES AS WELL AND MAY BE REQUIRED TO RECEIVE A
 COMPREHENSIVE REVIEW.
  
 9.SEE PLAN SHEETS AE4.09, P4.09 AND P9.02. STORM PIPING
 PLAN VIEW AND ISOMETRIC INDICATE ROOF DRAINS WITH
 PRIMARY STORM PIPING AND OVERFLOW PIPING (SEE ST-7,
 ST-8, ST-10A AND ST-10B RISERS). PLAN VIEW ON AE4.09
 AND ON P4.09 SHOW A COMBINATION ROOF AND OVERFLOW DRAIN
 REGARDLESS OF WHETHER THE DRAIN IS DESIGNATED A PLANTER
 DRAIN (PD) OR A ROOF DRAIN (RD). PER WPB FBC 107.2.1,
 CLARIFY.
  
 10.NEED TO CLARIFY ST-9 RISER P4.01A AND P9.02
 PLAN SHEETS P4.01, P1.01, P1.02, P1.03, P1.04 AND P1.05
 SHOW RISER ST-9 (AS PREVIOUSLY NOTED, DRAWINGS P1.06
 THROUGH P1.09 ARE NOT INCLUDED IN THE SUBMITTED PLANS).
 HOWEVER, ST-9 IS NOT INDICATED ON P9.02 RISER DIAGRAM,
 ALTHOUGH THERE IS A TAG DESIGNATED ST-9. PER WPB FBC
 107.2.1, CLARIFY AND RECONCILE.
  
 11.PER WPB FBC 107.2.1, IDENTIFY ST-10A AND ST-10B ON
 P9.02 RISER DIAGRAM. CLARIFY ON P1.01 THAT ST-10 IS
 ACTUALLY ST-10B.
  
 12.ST-10A NOTED AS 8 INCH DIAMETER IS SHOWN CONNECTING
 TO ST-11 WHICH IS 6 INCH DIAMETER AND CONTINUES AS 6
 INCH TO THE POINT OF DISPOSAL SEE P9.02. PER WPB FBC
 107.2.1, SIZE BRANCH TO ACCOMMODATE THE COMBINED
 DISCHARGE OF ST-10A AND ST-11.
  
 13.ST-10B (ALSO NOTED AS ST-10 ON P1.01) APPEARS TO
 DISCHARGE DIRECTLY ONTO THE FIRST FLOOR. IS THIS THE
 POINT OF DISPOSAL? PER WPB FBC 107.2.1, CLARIFY AND
 SHOW COMPLIANCE WITH FBC PL 1101.2 DISPOSAL: RAINWATER
 FROM ROOFS AND STORM WATER FROM PAVED AREAS, YARDS,
 COURTS AND COURTYARDS SHALL DRAIN TO AN APPROVED PLACE
 OF DISPOSAL. FOR ONE- AND TWO-FAMILY DWELLINGS, AND
 WHERE APPROVED, STORM WATER IS PERMITTED TO DISCHARGE
 ONTO FLAT AREAS, SUCH AS STREETS OR LAWNS, PROVIDED
 THAT THE STORM WATER FLOWS AWAY FROM THE BUILDING.
  
 14.REGARDING STORM PIPING, PER WPB FBC 107.2.1,
 INDICATE ON BOTH PLAN VIEW SHEETS AND RISER DIAGRAM THE
 GPM OF ALL ROOF DRAINS AND PLANTER DRAINS AND ANY OTHER
 DRAIN INLETS THAT ADD RAINWATER TO THE SYSTEM. INDICATE
 ON THE SAME SHEETS THE ACCUMULATED GPM WHERE ONE
 AFFECTED BRANCH CONNECTS TO ANOTHER (IE. ST-10B
 CONNECTS TO ST-11) AND NOTE GPM AT ALL POINTS OF
 DISPOSAL
  
 15.SIZE ALL STORM PIPING MAINS AND BRANCHES ON P9.02
 AND P4.01A
  
 16.P9.02; WHAT IS THE STAND ALONE HORIZONTAL PIPING
 SPOOL ADJACENT TO THE BASE OF ST-12 AND THE OTHER
 HORIZONTAL PIPING SPOOL WITH THE WYE BELOW THAT?
  
 17.P9.02; WHAT IS THE STAND ALONE VERTICAL PIPING SPOOL
 SHOWN TO THE RIGHT OF ST-12?
  
 18.RECONCILE CIVIL AND BUILDING PLANS: P1.01 INDICATES
 16 INCH DIAMETER STORM SERVICE DRAIN AT I.E. 16.16
 (1600 GPM). CIVIL C5.00 INDICATES SAME SECTION OF
 PIPING TO BE 15 INCH HDPE. PER WPB FBC 107.2.1 CLARIFY
 AND RECONCILE.
  
 19. JANITOR?S ROOM, FLOORS 9 THROUGH 17. SHEET AE4.10
 PRESENTS AS ALL FLOORS ARE TYPICAL, BUT AE6.02 FINISH
 SCHEDULE INDICATES JANITOR?S ROOMS ON FLOORS 9 (RM
 907), 10 (RM 1007), 12 (RM 1206), 13 (RM 1306), 14 (RM
 1406) AND 16 (RM 1606) AND NO MENTION OF JANITOR?S
 ROOMS ON FLOORS 11,15 AND 17. PER WPB FBC 107.2.1,
 CLARIFY AND RECONCILE.
  
 20.NOTED JANITOR?S ROOMS PARTITION TYPE DESIGNATED SAM
 IN SHEET AE7.01 NOTES 5/8 INCH GYPSUM (GWB) ON THE
 JANITOR ROOM SIDE OF THE PARTITION. AE6.02 FINISH
 SCHEDULE FOR THE WALL INDICATES DESIGNATION PT-12
 SEMI-GLOSS PAINT. PLEASE REFER TO FBC PL 310.3 AND FBC
 1210.2.2. WALLS AND PARTITIONS WITHIN 2 FEET (610 MM)
 OF SERVICE SINKS, URINALS AND WATER CLOSETS SHALL HAVE
 A SMOOTH, HARD, NONABSORBENT SURFACE, TO A HEIGHT OF
 NOT LESS THAN 4 FEET (1219 MM) ABOVE THE FLOOR, AND
 EXCEPT FOR STRUCTURAL ELEMENTS, THE MATERIALS USED IN
 SUCH WALLS SHALL BE OF A TYPE THAT IS NOT ADVERSELY
 AFFECTED BY MOISTURE. PLEASE NOTE THAT FBC 1210.2.2
 STIPULATES THAT THE MATERIAL BE "HARD." THE INTENT OF
 THIS SECTION IS THAT THE SURROUNDING MATERIAL SHOULD
 NOT BE OF A TYPE THAT IS EASILY DAMAGED SUCH THAT THE
 MATERIAL COULD BECOME ABSORBENT AND THUS, NOT READILY
 CLEANABLE AND SANITIZED. PAINTED DRYWALL, EVEN WHERE
 COATED WITH HIGHLY DURABLE PAINTS, DOES NOT MEET THE
 INTENT OF SECTION 1210.2.2. THE TYPICAL MATERIALS USED
 FOR THIS APPLICATION ARE CERAMIC TILE, FIBERGLASS
 REINFORCED PLASTIC (FRP) PANELS, PHENOLIC PANELS,
 LAMINATED PLASTIC PANELS, PAINTED STEEL AND STAINLESS
 STEEL. PER FBC PL 310.3 AND FBC 1210.2.2, JANITOR ROOM
 WALLS AT SERVICE SINK SHALL COMPLY
  
 END OF COMMENTS.
 A COMPREHENSIVE REVIEW COULD NOT BE ACCOMPLISHED AT
 THIS TIME. PLEASE RESUBMIT CLEARLY LEGIBLE PLANS AND A
 RESPONSE NARRATIVE ADDRESSING THE PLUMBING COMMENTS
 FROM THE FIRST REVIEW.
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.ALL PLANS TO BE SIGNED
 AND SEALED BY THE DESIGNER AS REQUIRED BY FAC AND FS.
  
  
 JERALD SMITH
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
 EMAIL [email protected]
 MOBILE 561-243-0882
 PLEASE NOTE THAT I TYPICALLY WORK ON TUESDAYS AND
 THURSDAYS
  
 21020368 360 S ROSEMARY AVE
  
  
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 4 Status P Date 2021-09-16 Cont ID  
Sent By rmcphers Date 2021-09-16 Time 10:05 Rev Time 0.00
Received By rmcphers Date 2021-09-16 Time 10:05 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2021-08-19 Cont ID  
Sent By medwards Date 2021-08-19 Time 10:03 Rev Time 0.00
Received By medwards Date 2021-08-19 Time 10:03 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-06-08 Cont ID  
Sent By medwards Date 2021-06-08 Time 14:04 Rev Time 0.00
Received By medwards Date 2021-06-08 Time 14:04 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-03-25 Cont ID  
Sent By rmcphers Date 2021-03-25 Time 14:47 Rev Time 0.00
Received By rmcphers Date 2021-03-25 Time 14:47 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2021-04-01 Cont ID  
Sent By aaponte Date 2021-04-01 Time 17:12 Rev Time 0.00
Received By aaponte Date 2021-04-01 Time 17:12 Sent To  
Notes
***NONE***