| 2021-03-16 14:08:51 | CODES IN EFFECT: |
| | FBC = FLORIDA BUILDING CODE 2017 6TH EDITION |
| | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 |
| | 6TH ED, CHAPTER 1 |
| | WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL |
| | MANUAL REVISED 2017 |
| | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 |
| | 6TH EDITION |
| | FBC ACC = FLORIDA ACCESSIBILITY CODE 2017 6TH EDITION |
| | FBC PL = FLORIDA PLUMBING CODE 2017 6TH EDITION |
| | FAC= FLORIDA ADMINISTRATIVE CODE |
| | FS = FLORIDA STATUTES |
| | |
| | 21020368 360 S ROSEMARY AVE |
| | 1ST REVIEW |
| | PLUMBING COMMENTS: DENIED |
| | |
| | GENERAL: PER WPB FBC 107.2.1, CLOUD AND TAG ALL |
| | REVISIONS ON THE PLANS. |
| | |
| | 1.RE: MEPFPT |
| | A.P1.01 ASI#1/REV 4; UPDATED ELEVATOR SUMP PUMPS AND |
| | SIZES. PLAN SHOWS COLLECTION SYSTEMS FROM SUMP PUMPS TO |
| | A SANITARY CONNECTION. PIPING IS NOT SIZED. PER WPB FBC |
| | 107.2.1, PROVIDE 1) SIZING OF PIPING 2) A DETAIL OF |
| | CONNECTION(S) TO SANITARY SYSTEM. CLOUD AND TAG. |
| | B.P1.02 ASI#1/REV 7; UPDATED ELEVATOR SUMP PUMPS AND |
| | SIZES. NOT ADDRESSED. PER WPB FBC 107.2.1, CLARIFY. |
| | C.P1.03 ASI#1/REV 4; UPDATED ELEVATOR SUMP PUMPS AND |
| | SIZES. NOT ADDRESSED. PER WPB FBC 107.2.1, CLARIFY. |
| | E.P-1.01 ASI#2/REV 5; A) REVISED STORM SIZE TO 12 INCH |
| | FOR BOTH HIGH AND LOW ZONE. NOTED HIGH ZONE IS 12 INCH, |
| | BUT LOW ZONE IS 8 INCH. PER WPB FBC 107.2.1, CLARIFY. |
| | PER WPB FBC 107.2.1, IDENTIFY PIPING SECTIONS WITH REV |
| | 5 TAG AND CLOUD. B) ADDED CIVIL REFERENCE TO PIPING IN |
| | LOADING DOCK AND SKETCH OUT PIPING ON PLANS. CIVIL |
| | REFERENCE NOTED. SKETCHED PIPE NOTED. PLUMBING DRAWINGS |
| | P4.01, P1.01 AND P9.02, SHOW PIPING THAT IS ALSO SHOWN |
| | ON CIVIL DRAWING C5.00. CLEARLY INDICATE ON THE PLANS |
| | WHICH IS PART OF THE BUILDING SYSTEM AND WHICH IS PART |
| | OF THE SITE WORK. PER WPB FBC 107.2.1, IDENTIFY PIPING |
| | CONNECTION WITH REV 5 TAG AND CLOUD. C) REVISED |
| | PLUMBING WORK OUTSIDE OF STAIR TOWER #2. PER WPB FBC |
| | 107.2.1, IDENTIFY PIPING WITH REV 5 TAG AND CLOUD. I |
| | ONLY SEE REV 3 NOTED IN THIS AREA. PER WPB FBC 107.2.1, |
| | IDENTIFY PIPING CONNECTION WITH REV 5 TAG AND CLOUD. D) |
| | ADDED CD PIPING CONNECTION OUTSIDE ELEVATOR LOBBY. DO |
| | NOT SEE ADDED CONNECTION. PER WPB FBC 107.2.1, IDENTIFY |
| | PIPING CONNECTION WITH REV 5 TAG AND CLOUD. |
| | F.P-1.02 ASI#2/REV 5; ASI#2/REV 5 NOT NOTED ON PLAN. |
| | ADD REV 5 TO PLAN AND A) REVISED PLUMBING WORK OUTSIDE |
| | OF STAIR TOWER #2. PER WPB FBC 107.2.1, IDENTIFY PIPING |
| | WITH REV 5 TAG AND CLOUD. B) ADDED CD PIPING CONNECTION |
| | OUTSIDE ELEVATOR LOBBY. DO NOT SEE ADDED CONNECTION. |
| | PER WPB FBC 107.2.1, IDENTIFY PIPING CONNECTION WITH |
| | REV 5 TAG. |
| | G.P-1.03 ASI#2/REV 2; A) REVISED PLUMBING WORK OUTSIDE |
| | OF STAIR TOWER #2. PER WPB FBC 107.2.1, IDENTIFY PIPING |
| | WITH REV 2 TAG. B) ADDED CD PIPING CONNECTION OUTSIDE |
| | ELEVATOR LOBBY. DO NOT SEE ADDED CONNECTION. PER WPB |
| | FBC 107.2.1, IDENTIFY PIPING CONNECTION WITH REV 2 TAG |
| | AND CLOUD. |
| | H.P4.01A ASI#2/REV 8; A) REVISED STORM SIZE TO 12 INCH |
| | FOR BOTH HIGH AND LOW ZONE. B) REVISED PLUMBING WORK |
| | OUTSIDE OF STAIR TOWER #2. PER WPB FBC 107.2.1, |
| | IDENTIFY PIPING WITH REV 2 TAG AND CLOUD. C) ADDED CD |
| | PIPING CONNECTION OUTSIDE ELEVATOR LOBBY. DO NOT SEE |
| | ADDED CONNECTION. PER WPB FBC 107.2.1, IDENTIFY PIPING |
| | CONNECTION WITH REV 2 TAG AND CLOUD. |
| | I.P4.01B ASI#2/REV 8; REVISED FUEL PIPE ROUTING. |
| | ASI#2/REV 8 IS NOT NOTED ON THE PLAN. PER WPB FBC |
| | 107.2.1, ADD TO PLAN AND IDENTIFY PIPING WITH REV 8 TAG |
| | AND CLOUD OR MATCH UP WITH ASI#2 REV 5 NOTED ON PLANS. |
| | J.P4.02A ASI#2/REV 8; ASI#2/REV 8 IS NOT NOTED ON THE |
| | PLAN. PER WPB FBC 107.2.1, ADD TO PLAN AND A) REVISED |
| | PLUMBING WORK OUTSIDE OF STAIR TOWER #2. PER WPB FBC |
| | 107.2.1, IDENTIFY PIPING WITH REV 8 TAG AND CLOUD. B) |
| | ADDED CD PIPING CONNECTION OUTSIDE ELEVATOR LOBBY. DO |
| | NOT SEE ADDED CONNECTION. PER WPB FBC 107.2.1, IDENTIFY |
| | PIPING CONNECTION WITH REV 8 TAG AND CLOUD. C) REVISE |
| | REVISION SCHEDULE TO REFLECT OR MATCH UP WITH ASI#2 REV |
| | 5 NOTED ON PLANS, CLOUD AND TAG. |
| | K.P4.03A ASI#2/REV 5; ASI#2/REV 5 IS NOT NOTED ON THE |
| | PLAN. PER WPB FBC 107.2.1, ADD TO PLAN AND A) REVISED |
| | PLUMBING WORK OUTSIDE OF STAIR TOWER #2. PER WPB FBC |
| | 107.2.1, IDENTIFY PIPING WITH REV 5 TAG AND CLOUD. B) |
| | ADDED CD PIPING CONNECTION OUTSIDE ELEVATOR LOBBY. DO |
| | NOT SEE ADDED CONNECTION. PER WPB FBC 107.2.1, IDENTIFY |
| | PIPING CONNECTION WITH REV 5 TAG AND CLOUD. C) REVISE |
| | REVISION SCHEDULE TO REFLECT OR MATCH UP WITH ASI#2 REV |
| | 4 NOTED ON PLANS, CLOUD AND TAG. |
| | L.P4.04A ASI#2/REV 5; ASI#2/REV 5 IS NOT NOTED ON THE |
| | PLAN. PER WPB FBC 107.2.1, ADD TO PLAN AND A) REVISED |
| | PLUMBING WORK OUTSIDE OF STAIR TOWER #2. PER WPB FBC |
| | 107.2.1, IDENTIFY PIPING WITH REV 5 TAG AND CLOUD. B) |
| | ADDED CD PIPING CONNECTION OUTSIDE ELEVATOR LOBBY. DO |
| | NOT SEE ADDED CONNECTION. PER WPB FBC 107.2.1, IDENTIFY |
| | PIPING CONNECTION WITH REV 5 TAG AND CLOUD. C) REVISE |
| | REVISION SCHEDULE TO REFLECT OR MATCH UP WITH ASI#2 REV |
| | 4 NOTED ON PLANS, CLOUD AND TAG. |
| | M.P4.05A ASI#2/REV 4; A) REVISED PLUMBING WORK OUTSIDE |
| | OF STAIR TOWER #2. PER WPB FBC 107.2.1, IDENTIFY PIPING |
| | WITH REV 4 TAG AND CLOUD. B) ADDED CD PIPING CONNECTION |
| | OUTSIDE ELEVATOR LOBBY. DO NOT SEE ADDED CONNECTION. |
| | PER WPB FBC 107.2.1, IDENTIFY PIPING CONNECTION WITH |
| | REV 4 TAG AND CLOUD. |
| | N.P4.06A ASI#2/REV 5; A) REVISED PLUMBING WORK OUTSIDE |
| | OF STAIR TOWER #2. PER WPB FBC 107.2.1, IDENTIFY PIPING |
| | WITH REV 5 TAG AND CLOUD. B) ADDED CD PIPING CONNECTION |
| | OUTSIDE ELEVATOR LOBBY. DO NOT SEE ADDED CONNECTION. |
| | PER WPB FBC 107.2.1, IDENTIFY PIPING CONNECTION WITH |
| | REV 5 TAG AND CLOUD. |
| | O.P4.07A ASI#2/REV 5; ASI#2/REV 5 IS NOT NOTED ON THE |
| | PLAN. PER WPB FBC 107.2.1, ADD TO PLAN AND A) REVISED |
| | PLUMBING WORK OUTSIDE OF STAIR TOWER #2. PER WPB FBC |
| | 107.2.1, IDENTIFY PIPING WITH REV 5 TAG AND CLOUD. B) |
| | ADDED CD PIPING CONNECTION OUTSIDE ELEVATOR LOBBY. DO |
| | NOT SEE ADDED CONNECTION. PER WPB FBC 107.2.1, IDENTIFY |
| | PIPING CONNECTION WITH REV 5 TAG AND CLOUD. C) REVISE |
| | REVISION SCHEDULE TO REFLECT OR MATCH UP WITH ASI#2 REV |
| | 4 NOTED ON PLAN REVISION SCHEDULE, CLOUD AND TAG. |
| | P.P4.08A ASI#2/REV 4; A) REVISED PLUMBING WORK OUTSIDE |
| | OF STAIR TOWER #2. PER WPB FBC 107.2.1, IDENTIFY PIPING |
| | WITH REV 4 TAG AND CLOUD. B) ADDED CD PIPING CONNECTION |
| | OUTSIDE ELEVATOR LOBBY. DO NOT SEE ADDED CONNECTION. |
| | PER WPB FBC 107.2.1, IDENTIFY PIPING CONNECTION WITH |
| | REV 4 TAG AND CLOUD. |
| | Q.P9.04 ASI#2/REV 2; REVISED CD ISO. PER WPB FBC |
| | 107.2.1, CLOUD CHANGES AND TAG REV 2. ADDITIONALLY, |
| | FILL IN MISSING SPOOLS TO PROVIDE COMPLETE DRAWING. |
| | R.P1.01 ASI#2R/REV 5; ASI#2R/REV 5 IS NOT NOTED ON THE |
| | PLAN. PER WPB FBC 107.2.1, ADD TO PLAN AND A) ADDED DAY |
| | TANK FOR GENERATOR. PER WPB FBC 107.2.1, IDENTIFY DAY |
| | TANK WITH REV 5 TAG AND CLOUD. B) ADDED CD PIPING AND |
| | STORM PIPING AS SHOWN ON CIVIL PLANS IN LOADING DOCK. |
| | DO NOT SEE ADDED CONNECTIONS. PER WPB FBC 107.2.1, |
| | IDENTIFY PIPING CONNECTIONS WITH REV 5 TAG AND CLOUD. |
| | C) NOTE ELIMINATION OF ST-1 WITH REV 5 TAG AND CLOUD. |
| | D) REVISE REVISION SCHEDULE TO REFLECT OR MATCH UP WITH |
| | ASI#2R REV 6 NOTED ON PLAN REVISION SCHEDULE, CLOUD AND |
| | TAG. |
| | S.P1.02 ASI#2R/REV 5; ASI#2R/REV 5 IS NOT NOTED ON THE |
| | PLAN. PER WPB FBC 107.2.1, ADD TO PLAN AND A) ADDED CD |
| | CONNECTION. PER WPB FBC 107.2.1, IDENTIFY CD CONNECTION |
| | WITH REV 5 TAG AND CLOUD. B) MOVED STORM PIPING TO |
| | TRENCH DRAIN. PER WPB FBC 107.2.1, IDENTIFY WITH REV 5 |
| | TAG AND CLOUD. C) SHIFTED STORM RISERS AND ELIMINATED |
| | ST-9. ST-1 IS STILL SHOWN ON PLAN. CLARIFY. NOTE |
| | CHANGES WITH REV 5 TAG AND CLOUD. D) REVISE REVISION |
| | SCHEDULE TO REFLECT OR MATCH UP WITH ASI#2R REV 3 NOTED |
| | ON PLAN REVISION SCHEDULE, CLOUD AND TAG. PLEASE NOTE |
| | THAT P1.03, P1.04 AND P1.05 ARE STILL SHOWING ST-1 |
| | STORM RISER. PER WPB FBC 107.2.1, CLARIFY. |
| | ADDITIONALLY, PER WPB FBC 107.2.1, REVIEW PLAN SHEETS |
| | P1.06, P1.07, P-1.08, P1.09 AND ANY OTHER POTENTIALLY |
| | AFFECTED PLANS FOR ANY NOTE OF STORM RISER ST-9, REVISE |
| | AND RESUBMIT AS REQUIRED. |
| | T.P4.01A ASI#2R/REV 5; ASI#2R/REV 5 IS NOT NOTED ON THE |
| | PLAN. PER WPB FBC 107.2.1, ADD TO PLAN AND PER WPB FBC |
| | 107.2.1, IDENTIFY CHANGES WITH REV 5 TAG AND CLOUD. |
| | REVISE REVISION SCHEDULE TO REFLECT OR MATCH UP WITH |
| | ASI#2R REV 9 NOTED ON PLAN REVISION SCHEDULE, CLOUD AND |
| | TAG. ADDITIONALLY, ASI#2R/REV 9 IS INDICATED IN THE |
| | FUEL TANK ROOM. PER WPB FBC 107.2.1, CLARIFY. |
| | U.P4.02A ASI#2R/REV 5; ASI#2R/REV 5 IS NOT NOTED ON THE |
| | PLAN. PER WPB FBC 107.2.1, ADD TO PLAN AND PER WPB FBC |
| | 107.2.1, IDENTIFY CHANGES WITH REV 5 TAG AND CLOUD. |
| | REVISE REVISION SCHEDULE TO REFLECT OR MATCH UP WITH |
| | ASI#2R REV 6 NOTED ON PLAN REVISION SCHEDULE, CLOUD AND |
| | TAG. |
| | V.P4.03A ASI#2R/REV 5; PER WPB FBC 107.2.1, IDENTIFY |
| | CHANGES WITH REV 5 TAG AND CLOUD. |
| | W.P4.04A ASI#2R/REV 5; PER WPB FBC 107.2.1, IDENTIFY |
| | CHANGES WITH REV 5 TAG AND CLOUD. |
| | X.P4.05A ASI#2R/REV 5; PER WPB FBC 107.2.1, IDENTIFY |
| | CHANGES WITH REV 5 TAG AND CLOUD. |
| | Y.P4.06A ASI#2R/REV 5; ASI#2R/REV 5 IS NOT NOTED ON THE |
| | PLAN. PER WPB FBC 107.2.1, ADD TO PLAN AND PER WPB FBC |
| | 107.2.1, IDENTIFY CHANGES WITH REV 5 TAG AND CLOUD. |
| | REVISE REVISION SCHEDULE TO REFLECT OR MATCH UP WITH |
| | ASI#2R REV 6 NOTED ON PLAN REVISION SCHEDULE, CLOUD AND |
| | TAG. |
| | Z.P4.07A ASI#2R/REV 5; PER WPB FBC 107.2.1, IDENTIFY |
| | CHANGES WITH REV 5 TAG AND CLOUD. |
| | AA.P4.08A ASI#2R/REV 5; PER WPB FBC 107.2.1, IDENTIFY |
| | CHANGES WITH REV 5 TAG AND CLOUD. |
| | BB.P4.06A ASI#4/REV 7; ASI#4/REV 7 IS NOT NOTED ON THE |
| | PLAN. THERE IS AN ASI#5/REV 6 IN THE REVISION SCHEDULE. |
| | PER WPB FBC 107.2.1, CLARIFY, IDENTIFY CHANGES WITH REV |
| | 7, TAG AND CLOUD. REVISE REVISION SCHEDULE TO REFLECT |
| | OR MATCH UP WITH ASI#5/REV 6 NOTED ON PLAN REVISION |
| | SCHEDULE, CLOUD AND TAG. |
| | CC.P4.07A ASI#4/REV 6; ASI#4/REV 6 IS NOT NOTED ON THE |
| | PLAN. THERE IS AN ASI#5/REV 6 IN THE REVISION SCHEDULE. |
| | PER WPB FBC 107.2.1, CLARIFY, IDENTIFY CHANGES WITH REV |
| | 6, TAG AND CLOUD. REVISE REVISION SCHEDULE TO REFLECT |
| | OR MATCH UP WITH ASI#5/REV 6 NOTED ON PLAN REVISION |
| | SCHEDULE, CLOUD AND TAG. |
| | DD.P4.08A ASI#4/REV 6; ASI#4/REV 6 IS NOT NOTED ON THE |
| | PLAN. THERE IS AN ASI#5/REV 6 IN THE REVISION SCHEDULE. |
| | PER WPB FBC 107.2.1, CLARIFY, IDENTIFY CHANGES WITH REV |
| | 6, TAG AND CLOUD. REVISE REVISION SCHEDULE TO REFLECT |
| | OR MATCH UP WITH ASI#5/REV 6 NOTED ON PLAN REVISION |
| | SCHEDULE, CLOUD AND TAG. |
| | EE.P4.09 ASI#4/REV 2; ASI#4/REV 2 IS NOT NOTED ON THE |
| | PLAN. THERE IS AN ASI#5/REV 2 IN THE REVISION SCHEDULE. |
| | PER WPB FBC 107.2.1, CLARIFY, IDENTIFY CHANGES WITH REV |
| | 2, TAG AND CLOUD. REVISE REVISION SCHEDULE TO REFLECT |
| | OR MATCH UP WITH ASI#5/REV 2 NOTED ON PLAN REVISION |
| | SCHEDULE, CLOUD AND TAG. |
| | FF.P4.07A ASI#4/REV 6; ASI#4/REV 6 IS NOT NOTED ON THE |
| | PLAN. THERE IS AN ASI#5/REV 6 IN THE REVISION SCHEDULE. |
| | PER WPB FBC 107.2.1, CLARIFY, IDENTIFY CHANGES WITH REV |
| | 6, TAG AND CLOUD. REVISE REVISION SCHEDULE TO REFLECT |
| | OR MATCH UP WITH ASI#5/REV 6 NOTED ON PLAN REVISION |
| | SCHEDULE, CLOUD AND TAG. |
| | GG.P9.02 ASI#4/REV 3; ASI#4/REV 3 IS NOT NOTED ON THE |
| | PLAN. THERE IS AN ASI#5/REV 3 IN THE REVISION SCHEDULE. |
| | PER WPB FBC 107.2.1, CLARIFY, IDENTIFY CHANGES WITH REV |
| | 3, TAG AND CLOUD. REVISE REVISION SCHEDULE TO REFLECT |
| | OR MATCH UP WITH ASI#5/REV 3 NOTED ON PLAN REVISION |
| | SCHEDULE, CLOUD AND TAG. |
| | HH.P0.02 ASI#9/REV 5; PER WPB FBC 107.2.1, IDENTIFY |
| | CHANGES WITH REV 5 TAG AND CLOUD. |
| | II.P4.10 ASI#10/REV 2; PER WPB FBC 107.2.1, IDENTIFY |
| | CHANGES WITH REV 2 TAG AND CLOUD. |
| | |
| | 2.DOMESTIC PUMP SYSTEM IS DESIGNED AT 246 TDH WHICH IS |
| | THE EQUIVALENT OF 107 PSI ADDED TO THE INCOMING |
| | PRESSURE SUPPLIED BY THE CITY AT THE PUMP. |
| | NOTE FBC PL 604.8 WATER PRESSURE-REDUCING VALVE OR |
| | REGULATOR. WHERE WATER PRESSURE WITHIN A BUILDING |
| | EXCEEDS 80 PSI (552 KPA) STATIC, AN APPROVED WATER |
| | PRESSURE-REDUCING VALVE CONFORMING TO ASSE 1003 OR CSA |
| | B356 WITH STRAINER SHALL BE INSTALLED TO REDUCE THE |
| | PRESSURE IN THE BUILDING WATER DISTRIBUTION PIPING TO |
| | NOT GREATER THAN 80 PSI (552 KPA) STATIC. |
| | EXCEPTION: SERVICE LINES TO SILL COCKS AND OUTSIDE |
| | HYDRANTS, AND MAIN SUPPLY RISERS WHERE PRESSURE FROM |
| | THE MAINS IS REDUCED TO 80 PSI (552 KPA) OR LESS AT |
| | INDIVIDUAL FIXTURES. |
| | ADDITIONALLY NOTE THAT MANY MANUFACTURER?S PRODUCT?S |
| | (IE. FAUCETS, FLUSH VALVES, DRINKING FOUNTAINS, WASHING |
| | MACHINES, SHOWER VALVES, ETC.) SPECIFICALLY STATE THAT |
| | IF WATER PRESSURE EXCEEDS A CERTAIN PRESSURE (IE. 65 |
| | PSI) THEN THE WARRANTY MAY BE VOIDED. PLEASE SEE FBC PL |
| | 303.2 INSTALLATION OF MATERIALS. ALL MATERIALS USED |
| | SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE |
| | STANDARDS UNDER WHICH THE MATERIALS ARE ACCEPTED AND |
| | APPROVED. IN THE ABSENCE OF SUCH INSTALLATION |
| | PROCEDURES, THE MANUFACTURER?S INSTRUCTIONS SHALL BE |
| | FOLLOWED. WHERE THE REQUIREMENTS OF REFERENCED |
| | STANDARDS OR MANUFACTURER?S INSTALLATION INSTRUCTIONS |
| | DO NOT CONFORM TO MINIMUM PROVISIONS OF THIS CODE, THE |
| | PROVISIONS OF THIS CODE SHALL APPLY. |
| | PER WPB FBC 107.2.1, INDICATE SERVICE PRESSURE AT EACH |
| | FLOOR ON DOMESTIC WATER RISER DIAGRAM. ADDITIONALLY, |
| | PROVIDE SUCTION AND DISCHARGE PRESSURES AT THE DOMESTIC |
| | BOOSTER PUMP. SPECIFY AND PROVIDE LEAD FREE PRESSURE |
| | REDUCING VALVES WITH STRAINERS AT SERVICE OUTLET(S) ON |
| | THE HIGH PRESSURE SIDE OF THE DOMESTIC BOOSTER PUMP |
| | SYSTEMS IN ACCORDANCE WITH FBC PL 604.8 AND 302.2 |
| | |
| | 3.WATER RISER DIAGRAM APPEARS TO BE INCOMPLETE AND/OR |
| | DOES NOT NECESSARILY REFLECT THE PLUMBING FLOOR |
| | PLAN(S). PER WPB FBC 107.2.1, PROVIDE COMPLETE RISER |
| | DIAGRAM(S) SHOWING ALL FLOORS AND DISTRIBUTION. IF |
| | NECESSARY, PROVIDE SUPPLEMENTAL SCHEMATIC(S) TO PROVIDE |
| | CLARIFICATION. SHOW ALL SERVICE OUTLETS BOTH FOR SHELL |
| | AND FUTURE. SHOW REQUIRED PRVS.THERE ARE DISCONNECTED |
| | SPOOLS AS WELL AS SYMBOLS WITH NO PIPING TO THEM. PER |
| | WPB FBC 107.2.1, REMOVE ANY DISCONNECTED ITEMS OR |
| | PROVIDE CONNECTIONS TO THE SAME. SHOW ALL |
| | |
| | 4.INDICATE ALL FLOOR LEVELS ON ALL RISER DIAGRAMS. |
| | |
| | 5.PROVIDE COMPLETE, SIZED SANITARY BUILDING RISER |
| | DIAGRAM TO INCLUDE ALL BUILDING DRAIN, POINT OF |
| | CONNECTION TO BUILDING SEWER, BRANCHES OF THE BUILDING |
| | DRAIN, SOIL AND WASTE STACKS, FIXTURE BRANCHES, FIXTURE |
| | DRAINS, INDIVIDUAL VENTS, BRANCH VENTS, VENT STACKS, |
| | STACK VENTS. AT TYPICAL |
| | |
| | 6.LABEL RISER DIAGRAMS INDICATING FIXTURE/EQUIPMENT |
| | EACH INLET OR OUTLET IS SERVICING |
| | |
| | 7.PROVIDE SIZED SANITARY AND WATER RISER DIAGRAMS FOR |
| | CORE AREA BATHROOMS/JANITOR ROOMS. PROVIDE TYPICAL FOR |
| | FLOORS 9, 10, 12, 13, 14 AND 16 AND A SEPARATE FOR |
| | FLOORS 11, 15 AND 17 IF REQUIRED; SEE NOTE* |
| | *JANITOR?S ROOM, FLOORS 9 THROUGH 17. SHEET AE4.10 |
| | PRESENTS AS ALL FLOORS ARE TYPICAL, BUT AE6.02 FINISH |
| | SCHEDULE INDICATES JANITOR?S ROOMS ON FLOORS 9 (RM |
| | 907), 10 (RM 1007), 12 (RM 1206), 13 (RM 1306), 14 (RM |
| | 1406) AND 16 (RM 1606) AND NO MENTION OF JANITOR?S |
| | ROOMS ON FLOORS 11,15 AND 17. PER WPB FBC 107.2.1, |
| | CLARIFY AND RECONCILE. |
| | |
| | 8.PLEASE NOTE THAT THE FOLLOWING PLUMBING PLAN SHEETS |
| | WHICH ARE LISTED ON SHEET G10.03 ARE NOT INCLUDED IN |
| | THE CURRENT SUBMITTED DRAWINGS: P0.01, P1.06, P1.07, |
| | P1.08, P1.09, P1.10, P1.11, P4.01, P4.02B, P4.03B, |
| | P4.04B, P4.07B, P4.08B, P4.13, P5.01, P5.02, P9.01, AND |
| | P9.03. PER WPB FBC 107.2.1, PROVIDE THE NOTED |
| | DOCUMENTS. |
| | PLEASE NOTE THERE ARE OTHER SHEETS MISSING IN OTHER |
| | DISCIPLINES AS WELL AND MAY BE REQUIRED TO RECEIVE A |
| | COMPREHENSIVE REVIEW. |
| | |
| | 9.SEE PLAN SHEETS AE4.09, P4.09 AND P9.02. STORM PIPING |
| | PLAN VIEW AND ISOMETRIC INDICATE ROOF DRAINS WITH |
| | PRIMARY STORM PIPING AND OVERFLOW PIPING (SEE ST-7, |
| | ST-8, ST-10A AND ST-10B RISERS). PLAN VIEW ON AE4.09 |
| | AND ON P4.09 SHOW A COMBINATION ROOF AND OVERFLOW DRAIN |
| | REGARDLESS OF WHETHER THE DRAIN IS DESIGNATED A PLANTER |
| | DRAIN (PD) OR A ROOF DRAIN (RD). PER WPB FBC 107.2.1, |
| | CLARIFY. |
| | |
| | 10.NEED TO CLARIFY ST-9 RISER P4.01A AND P9.02 |
| | PLAN SHEETS P4.01, P1.01, P1.02, P1.03, P1.04 AND P1.05 |
| | SHOW RISER ST-9 (AS PREVIOUSLY NOTED, DRAWINGS P1.06 |
| | THROUGH P1.09 ARE NOT INCLUDED IN THE SUBMITTED PLANS). |
| | HOWEVER, ST-9 IS NOT INDICATED ON P9.02 RISER DIAGRAM, |
| | ALTHOUGH THERE IS A TAG DESIGNATED ST-9. PER WPB FBC |
| | 107.2.1, CLARIFY AND RECONCILE. |
| | |
| | 11.PER WPB FBC 107.2.1, IDENTIFY ST-10A AND ST-10B ON |
| | P9.02 RISER DIAGRAM. CLARIFY ON P1.01 THAT ST-10 IS |
| | ACTUALLY ST-10B. |
| | |
| | 12.ST-10A NOTED AS 8 INCH DIAMETER IS SHOWN CONNECTING |
| | TO ST-11 WHICH IS 6 INCH DIAMETER AND CONTINUES AS 6 |
| | INCH TO THE POINT OF DISPOSAL SEE P9.02. PER WPB FBC |
| | 107.2.1, SIZE BRANCH TO ACCOMMODATE THE COMBINED |
| | DISCHARGE OF ST-10A AND ST-11. |
| | |
| | 13.ST-10B (ALSO NOTED AS ST-10 ON P1.01) APPEARS TO |
| | DISCHARGE DIRECTLY ONTO THE FIRST FLOOR. IS THIS THE |
| | POINT OF DISPOSAL? PER WPB FBC 107.2.1, CLARIFY AND |
| | SHOW COMPLIANCE WITH FBC PL 1101.2 DISPOSAL: RAINWATER |
| | FROM ROOFS AND STORM WATER FROM PAVED AREAS, YARDS, |
| | COURTS AND COURTYARDS SHALL DRAIN TO AN APPROVED PLACE |
| | OF DISPOSAL. FOR ONE- AND TWO-FAMILY DWELLINGS, AND |
| | WHERE APPROVED, STORM WATER IS PERMITTED TO DISCHARGE |
| | ONTO FLAT AREAS, SUCH AS STREETS OR LAWNS, PROVIDED |
| | THAT THE STORM WATER FLOWS AWAY FROM THE BUILDING. |
| | |
| | 14.REGARDING STORM PIPING, PER WPB FBC 107.2.1, |
| | INDICATE ON BOTH PLAN VIEW SHEETS AND RISER DIAGRAM THE |
| | GPM OF ALL ROOF DRAINS AND PLANTER DRAINS AND ANY OTHER |
| | DRAIN INLETS THAT ADD RAINWATER TO THE SYSTEM. INDICATE |
| | ON THE SAME SHEETS THE ACCUMULATED GPM WHERE ONE |
| | AFFECTED BRANCH CONNECTS TO ANOTHER (IE. ST-10B |
| | CONNECTS TO ST-11) AND NOTE GPM AT ALL POINTS OF |
| | DISPOSAL |
| | |
| | 15.SIZE ALL STORM PIPING MAINS AND BRANCHES ON P9.02 |
| | AND P4.01A |
| | |
| | 16.P9.02; WHAT IS THE STAND ALONE HORIZONTAL PIPING |
| | SPOOL ADJACENT TO THE BASE OF ST-12 AND THE OTHER |
| | HORIZONTAL PIPING SPOOL WITH THE WYE BELOW THAT? |
| | |
| | 17.P9.02; WHAT IS THE STAND ALONE VERTICAL PIPING SPOOL |
| | SHOWN TO THE RIGHT OF ST-12? |
| | |
| | 18.RECONCILE CIVIL AND BUILDING PLANS: P1.01 INDICATES |
| | 16 INCH DIAMETER STORM SERVICE DRAIN AT I.E. 16.16 |
| | (1600 GPM). CIVIL C5.00 INDICATES SAME SECTION OF |
| | PIPING TO BE 15 INCH HDPE. PER WPB FBC 107.2.1 CLARIFY |
| | AND RECONCILE. |
| | |
| | 19. JANITOR?S ROOM, FLOORS 9 THROUGH 17. SHEET AE4.10 |
| | PRESENTS AS ALL FLOORS ARE TYPICAL, BUT AE6.02 FINISH |
| | SCHEDULE INDICATES JANITOR?S ROOMS ON FLOORS 9 (RM |
| | 907), 10 (RM 1007), 12 (RM 1206), 13 (RM 1306), 14 (RM |
| | 1406) AND 16 (RM 1606) AND NO MENTION OF JANITOR?S |
| | ROOMS ON FLOORS 11,15 AND 17. PER WPB FBC 107.2.1, |
| | CLARIFY AND RECONCILE. |
| | |
| | 20.NOTED JANITOR?S ROOMS PARTITION TYPE DESIGNATED SAM |
| | IN SHEET AE7.01 NOTES 5/8 INCH GYPSUM (GWB) ON THE |
| | JANITOR ROOM SIDE OF THE PARTITION. AE6.02 FINISH |
| | SCHEDULE FOR THE WALL INDICATES DESIGNATION PT-12 |
| | SEMI-GLOSS PAINT. PLEASE REFER TO FBC PL 310.3 AND FBC |
| | 1210.2.2. WALLS AND PARTITIONS WITHIN 2 FEET (610 MM) |
| | OF SERVICE SINKS, URINALS AND WATER CLOSETS SHALL HAVE |
| | A SMOOTH, HARD, NONABSORBENT SURFACE, TO A HEIGHT OF |
| | NOT LESS THAN 4 FEET (1219 MM) ABOVE THE FLOOR, AND |
| | EXCEPT FOR STRUCTURAL ELEMENTS, THE MATERIALS USED IN |
| | SUCH WALLS SHALL BE OF A TYPE THAT IS NOT ADVERSELY |
| | AFFECTED BY MOISTURE. PLEASE NOTE THAT FBC 1210.2.2 |
| | STIPULATES THAT THE MATERIAL BE "HARD." THE INTENT OF |
| | THIS SECTION IS THAT THE SURROUNDING MATERIAL SHOULD |
| | NOT BE OF A TYPE THAT IS EASILY DAMAGED SUCH THAT THE |
| | MATERIAL COULD BECOME ABSORBENT AND THUS, NOT READILY |
| | CLEANABLE AND SANITIZED. PAINTED DRYWALL, EVEN WHERE |
| | COATED WITH HIGHLY DURABLE PAINTS, DOES NOT MEET THE |
| | INTENT OF SECTION 1210.2.2. THE TYPICAL MATERIALS USED |
| | FOR THIS APPLICATION ARE CERAMIC TILE, FIBERGLASS |
| | REINFORCED PLASTIC (FRP) PANELS, PHENOLIC PANELS, |
| | LAMINATED PLASTIC PANELS, PAINTED STEEL AND STAINLESS |
| | STEEL. PER FBC PL 310.3 AND FBC 1210.2.2, JANITOR ROOM |
| | WALLS AT SERVICE SINK SHALL COMPLY |
| | |
| | END OF COMMENTS. |
| | A COMPREHENSIVE REVIEW COULD NOT BE ACCOMPLISHED AT |
| | THIS TIME. PLEASE RESUBMIT CLEARLY LEGIBLE PLANS AND A |
| | RESPONSE NARRATIVE ADDRESSING THE PLUMBING COMMENTS |
| | FROM THE FIRST REVIEW. |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS.ALL PLANS TO BE SIGNED |
| | AND SEALED BY THE DESIGNER AS REQUIRED BY FAC AND FS. |
| | |
| | |
| | JERALD SMITH |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | EMAIL [email protected] |
| | MOBILE 561-243-0882 |
| | PLEASE NOTE THAT I TYPICALLY WORK ON TUESDAYS AND |
| | THURSDAYS |
| | |
| | 21020368 360 S ROSEMARY AVE |
| | |
| | |
| | |
| | |