| 2021-01-12 15:02:49 | SFR ADDITION |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 |
| | AMENDMENTS |
| | |
| | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| | 1) PLEASE SHOW THE LOCATION OF THE SMOKE ALARMS PER FBC |
| | R314.2.2 ALTERATIONS, REPAIRS AND ADDITIONS. |
| | WHERE ALTERATIONS, REPAIRS OR ADDITIONS REQUIRING A |
| | PERMIT OCCUR, OR WHERE ONE OR MORE SLEEPING ROOMS ARE |
| | ADDED OR CREATED IN EXISTING DWELLINGS, THE INDIVIDUAL |
| | DWELLING UNIT SHALL BE EQUIPPED WITH SMOKE ALARMS |
| | LOCATED AS REQUIRED FOR NEW DWELLINGS. |
| | 2) PLEASE PROVIDE COMPLETE MIAMI DADE OR FLORIDA STATE |
| | PRODUCT APPROVALS FOR THE NEW EXTERIOR WINDOWS AND |
| | DOORS. |
| | 3) PLEASE PROVIDE COMPLETE MIAMI DADE OR FLORIDA STATE |
| | PRODUCT APPROVALS FOR THE ROOFING SYSTEM. PLEASE CIRCLE |
| | THE ROOFING ATTACHMENT TO BE USED IN THE ROOFING SYSTEM |
| | PRODUCT APPROVAL. |
| | 4) ALL PRODUCT APPROVALS NEED TO BE REVIEWED AND MARKED |
| | APPROVED BY THE BUILDING DESIGNER OF RECORD OR BE |
| | LISTED BY PRODUCT APPROVAL NUMBER ON THE DRAWINGS. |
| | 5) JOB VALUE AS DETERMINED IN THE ICC VALUATION DATA = |
| | 318 SQ. FT. X $122.46 = $38,942.00 - PLEASE REVISE THE |
| | BUILDING PERMIT APPLICATION TO SHOW THE CORRECTED JOB |
| | VALUE FBC WPB 109.3 BUILDING PERMIT VALUATIONS. IF, IN |
| | THE OPINION OF THE BUILDING OFFICIAL, THE CLAIMED |
| | VALUATION |
| | OF BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS, |
| | MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE |
| | UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE |
| | DENIED, UNLESS THE APPLICANT CAN SHOW |
| | DETAILED, QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED |
| | CONTRACTS (EXCLUDING LAND VALUE) TO MEET THE |
| | APPROVAL OF THE BUILDING OFFICIAL. FOR PERMITTING |
| | PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL |
| | BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING |
| | ONLY LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE |
| | LATEST PUBLISHED DATA OF NATIONAL |
| | CONSTRUCTION COST ANALYSIS SERVICES (MARSHALL-SWIFT, |
| | MEANS, ETC.), AS PUBLISHED BY INTERNATIONAL |
| | CODE CONGRESS. FINAL BUILDING PERMIT VALUATION SHALL BE |
| | SET BY THE BUILDING OFFICIAL. |
| | 6) ROOFING AND WINDOW AND DOOR PRODUCT APPROVALS MAY BE |
| | DEFERRED SUBMITTALS BY LISTING ITEMS TO BE DEFERRED ON |
| | THE CONSTRUCTION DOCUMENTS - 107.3.4.1 DEFERRED |
| | SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, DEFERRED |
| | SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF THE DESIGN |
| | THAT ARE NOT SUBMITTED AT THE TIME OF THE APPLICATION |
| | AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL |
| | WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL |
| | ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE BUILDING |
| | OFFICIAL. THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE SHALL LIST THE DEFERRED SUBMITTALS |
| | ON THE CONSTRUCTION DOCUMENTS FOR REVIEW BY THE |
| | BUILDING OFFICIAL. DOCUMENTS FOR DEFERRED SUBMITTAL |
| | ITEMS SHALL BE SUBMITTED TO THE REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW |
| | THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A |
| | NOTATION INDICATING THAT THE DEFERRED SUBMITTAL |
| | DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL |
| | CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED |
| | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE |
| | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE |
| | BUILDING OFFICIAL. |
| | |