| 2021-04-22 09:02:14 | 1) SHT. A-1.3.01 - ONE OF THE TREATMENT ROOMS AND ONE |
| | OF THE COUPLE'S SUITES AT THE SPA SHALL COMPLY WITH |
| | FBC-ACCESSIBILITY SEC. 201.1 AND THE SINK IN THESE |
| | ROOMS SHALL COMPLY WITH FBC-ACCESSIBILITY SECS.212.3, |
| | 606.1. |
| | 2) SHT.A-1.3.01 - THE MEN'S AND WOMEN'S STEAM ROOMS |
| | (M-1206 & W-1224) SHALL COMPLY WITH THE |
| | FBC-ACCESSIBILITY SEC.241 & 612. CONTROLS FOR THE STEAM |
| | ROOM SHALL COMPLY WITH FBC=ACCESS. SEC.309. |
| | 3) SHT. A-1.3.0.7 - THE SIZING OF THE DOWNSPOUTS AND |
| | GUTTERS IS BASED ON THE GALLONS PER MINUTE FLOW THROUGH |
| | THE GUTTER AND DOWNSPOUT PER THE FBC-PLUMBING SECS. |
| | 1106.3, 1106.6 AND TABLES 1106.3 & 1106.6. SUBMIT |
| | SIZING CALLCULATIONS BASED ON THESE TABLES.THE |
| | DOWNSPOUTS SHALL DISCHARGE A MINIMUM OF 1 FOOT FROM THE |
| | EXTERIOR BUILDING WALL. FBC-BUILDING SEC. 1503.7. SHOW |
| | THE DIMENSIONS OF THE GUTTERS & DOWNSPOUTS ON SHTS. |
| | A-1.3.07 & A-4.4.0.3. |
| | 4) THE PLUMBING SHEETS SHALL BEAR THE DIGITAL SIGNATURE |
| | AND SEAL OF THE DESIGN PROFESSIONAL PER F.A.C. |
| | 61G15-23.001, 61G15-23.004. |
| | 5) SHT.P-1.1.00 - INDDICATE ON THE PLAN WHAT STANDARD |
| | WAS USED FOR THE SIZING OF THE GREASE |
| | INTERCEPTOR.FBC-PLUMBING SECS.1003.2, 1003.3.4, |
| | 6) SHT. P-1.1.00 - SPECIFY ON THE PLAN THE SPECIFIC |
| | CIVIL DRAWING FOR THE CCONTINUATION OF THE STORM AND |
| | SANITARY LINES. WPB AMEND. TO FBC SEC. 107.2.1. |
| | 7) SHT. P-1.3.01A - THERE IS A NOTE ON THE PLAN THAT |
| | STATES "NOT FOR CONSTRUCTION.' CLARIFY. |
| | 8) PLACE MATCHLINES ON THE PLUMBING DRAWINGS FOR THE |
| | CONTINUATION OF THE PLUMBING SYSTEMS. WPB AMEND. TO FBC |
| | SEC. 107.2.1. |
| | 9)) SHT. P-1.5.0.1 - ENLARGED GUESTROOM - DOUBLE 7 - |
| | CLEAN UP THE DRAWING AS THERE ARE SSTRUCTURAL ELEMENT |
| | OVERLAYS ON THE PLUMBING SYTEM AND IS DIFFICULT TO |
| | REVIEW. WPB AMEND. TO FBC SEC. 107.2.1. |
| | 10) SHT.P-1.5.04 - DETAIL #2 - THERE ARE SECTIONS OF |
| | PIPING MISSING FROM YHE SANITARY RISER. CLARIFY. |
| | 11) SHT.P-1.5.05 - THE SANITARY RISER SHOWS THE HAND |
| | SINKS DISCHARGING TO THE GREASE WASTE SYSTEM. THE HAND |
| | SINKS SHALL DISCHARGE TO THE SANITARY SYSTEM |
| | FBC-PLUMBING SEC. 1003.3.1. |
| | 12) SHT. P-1.5.05 - A HOT WATER RECIRCULATION LINE IS |
| | REQUIRED IN THE BANQUET KITCHEN. FFBC-PLUMBING |
| | SEC.607.2. |
| | 13) SHT.P-1.05.06 - DETAIL #4 SHOWS AN ISLAND VENT FOR |
| | A FLLOR SINK. ISLAND VENTS ARE ONLY PERMITTED TO BE |
| | USED ON SINKS AND LAVATORIES, NOT ON FLOOR |
| | SINKS.ANOTHER METHOD OF VENTING SHALL BE USED. |
| | FBC-PLUMBING SEC.916.1.THIS COMMENT APPLIES TO ALL |
| | FLOOR SINKS WITH AN ISLAND VENT. |
| | 14) SHT. P-1.5.06 - THE COFFEE/TEA BREWERS AND WATER |
| | FILTER SHALL BE EQUIPPED WITH BACKFLOW DEVICES |
| | COMPLYING WITH ASSE 1024. THE SODA DISPENSER SHALL BE |
| | EQUIPPED WITH A BACFLOW PREVENTER COMPLYING WITH ASSE |
| | 1022. |
| | 15) SHT. P-1.5.07 - DETAIL #2 - ENLARGED 1129 KITCHEN - |
| | THERE IS AN ARROW AT THE TOP LEFT CORNER OF THE PLAN |
| | THAT STATES "2 INCH FORCE MAIN FROM SUMP PUMP" BUT |
| | THERE IS NO PIPING SHOWN. CLARIFY. |
| | 16) SHT. P-1.5.07 - DETAILS #2 & #3 - THE HAND SINKS |
| | SHALL DISCHARGE TO THE SANITARY, NOT TO THE GREASE |
| | WASTE SYSTEM.FBC-PLUMBING SEC. 1003.3.1. |
| | 17) SHT. P-1.5.07 - DETAILL #4 - ITEM #304 IS NOT SHOWN |
| | ON THE PRESSURE RISER DIAGRAM. CLARIFY. |
| | 18) SHT. P-1.5.09 - DETAIL #4 - THERE AR SECTIONS OF |
| | PIPING MISSING FROM THE GRAVITY RISER. REFER TO L-2, |
| | FLOR DRAINS,SANITARY AND VENT PIPING FOR LAVATORIES. |
| | CLARIFY. |
| | 19) SHT. P-1.5.10 - DETAIL #4 - WHERE DOES THE DRAIN |
| | FROM FIXTURE L-2 CONNECT O THE SYSTEM? |
| | 20) SHT. P-1.5.06.1 - DETAIL #4 - ITEMS C202, C203 & |
| | C204 ARE NOT SHOWN ON THE WATER DISTRIBUTION ISOMETRIC. |
| | CLARIFY. |
| | 21) SHT. P-1.5.06.1 - DETAIL #1 APPEARS TO SHOW A FLOOR |
| | SINK IN THE CLUBROOM PANTRY DISCHARGING TO THE |
| | SANITARY. CLARIFY. WHAT IS BEING DISCHARGED INTO THIS |
| | FLOOR SINK? ALSO, HAND SINKS SHALL DISCHARGE TO THE |
| | SANITARY, NOT THE GREASE WASTE SYSTEM. |
| | 22) SHT. P-3.0.00 - SPECIFY THE SPECIFIC CIVIL DRAWING |
| | ON THE PLAN FOR THE CONTINUATION OF THE 6 INCH SANITARY |
| | LINE. WPB AMEND. TO FBC SEC. 107.2.1. |
| | 23) SHT. P-3.0.00 - THE RISER DIAGRAM DOES NOT SHOW THE |
| | BRANCH DRAINS FOR ROOMS F-1108 & M-1107. CLARIFY. |
| | 24) SHT.P-3.0.00 - ONE BRANCCH DRAIN IS SHOWN UPSTREAM |
| | OF THE GREASE INTERCEPTORS ON THE RISER DIAGRAM BBUT |
| | TWO ARE SHOWN ON SHT. P-1.3.01A. CLARIFY. |
| | 25) SHT.P-3.0.01 - THE 3 INCH FLOOR SINK ON THE GREASE |
| | WASTE AND FLOOR DRAIN IN WHAT APPEARS TO BE THE |
| | DISPENSER AREAARE NOT SHOWN ON SHT. P-1.3.01B. CLARIFY. |
| | 26) SHT. P-3.0.01 SHOWS A 3 INCH FLOOR DRAIN ON THE |
| | EXTERIOR OF THE BUILDING BY STAIR 3 (#300) DISCHARGING |
| | TO THE GREASE WASTE SYSTEM. THIS FLOOR DRAIN WILL |
| | COLLLECT STORMWATER IF IT IS LOCATED ON THE EXTERIOR OF |
| | THE BUILDING WHICH VIOLATES FBC-PLUMBING SEC.1101.3. |
| | 27) SHT. P-3.0.09 - SPECIFY THE SPECIFIC CIVIL DRAWING |
| | ON THE PLAN FOR THE CONTINUATION OF THE STORM DRAINS. |
| | WPB AMEND. TO FBC SEC. 107.2.1. |
| | 28) SHT. P-3.0.09 - THE PIPING IS MISSING FOR THE |
| | TRENCH DRAINS. CLARIFY. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |