Plan Review Details - Permit 20121023
Plan Review Stops For Permit 20121023
Review Stop G GAS REVIEW
Rev No 2 Status P Date 2021-01-08 Cont ID  
Sent By ccole Date 2021-01-08 Time 11:51 Rev Time 0.00
Received By ccole Date 2021-01-08 Time 09:42 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2020-12-30 Cont ID  
Sent By ccole Date 2020-12-30 Time 13:51 Rev Time 0.00
Received By ccole Date 2020-12-30 Time 11:45 Sent To  
Notes
2020-12-30 13:54:421ST REVIEW FBC-2017 RES.
 PERMIT- 20121023
 12/30/2020
  
 CODES IN EFFECT:
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH
 EDITION 2017
 FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) PROVIDE A LP TANK INSTALLATION DETAIL SHOWING THE
 REQUIRED MASONRY OR OTHER NON-COMBUSTIBLE STRUCTURAL
 SUPPORTS LOCATED ON CONCRETE OR MASONRY FOUNDATION WITH
 THE CONTAINER SUPPORTS- SECTION 6.6.3.1 NFPA 58. SHOW
 HOW THE TANK WILL BE ANCHORED TO RESIST WIND LOAD AND
 WIND PRESSURES- SECTION 6.6.3.3 (D) NFPA 58.
  
 2) INDICATE THE PIPING DOWNSTREAM OF THE 2ND STAGE
 REGULATOR WILL BE CAPPED GAS TIGHT- SECTION G2415.15
 FBC RES. PLACE A NOTE ON THE PLAN INDICATING A SEPARATE
 PERMIT AND PLANS ARE REQUIRED FOR FUTURE GAS PIPING
 CONTINUATION AND APPLIANCE INSTALLATIONS- SECTION
 107.2.1 WPB.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date   Cont ID  
Sent By   Date 2021-01-08 Time   Rev Time 0.00
Received By ccarvaja Date 2021-01-07 Time 13:53 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2020-12-30 Time   Rev Time 0.00
Received By ccarvaja Date 2020-12-22 Time 08:33 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status N Date 2021-01-08 Cont ID  
Sent By ccole Date 2021-01-08 Time 11:51 Rev Time 0.00
Received By ccole Date 2021-01-08 Time 09:42 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2020-12-30 Cont ID  
Sent By ccole Date 2020-12-30 Time 13:29 Rev Time 0.00
Received By ccole Date 2020-12-30 Time 11:45 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-01-08 Cont ID  
Sent By ccole Date 2021-01-08 Time 11:51 Rev Time 0.00
Received By ccole Date 2021-01-08 Time 09:42 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-12-30 Cont ID  
Sent By ccole Date 2020-12-30 Time 13:55 Rev Time 0.00
Received By ccole Date 2020-12-30 Time 11:45 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved