Plan Review Details - Permit 20120697
| Plan Review Stops For Permit 20120697 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2021-01-14 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2021-01-14 |
Time |
09:58 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-01-14 |
Time |
09:58 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2021-01-12 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2021-01-12 |
Time |
08:14 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-01-12 |
Time |
08:14 |
Sent To |
|
|
| Notes |
| 2021-01-12 08:21:20 | PLAN | | | REVIEW COMMENTS | | | | | | 2ND REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | THE FOLLOWING COMMENT WAS NOT ADDRESSED. PLEASE CORRECT | | | THE SPANS FOR THE OPENINGS ON THE INSTALLATION SCHEDULE | | | FOR THE ARMOR SCREEN. | | | | | | 1) THE SPAN FOR THE ARMOR SCREEN IS SPECIFIED AS 80" | | | FOR ALL OF THE OPENINGS IN THE STORM PANEL SCHEDULE. | | | THE SPAN FOR THE FABRIC SCREENS IS THE CENTER TO CENTER | | | DISTANCE BETWEEN THE GROMMETS (ANCHORS) ON EACH SIDE OF | | | THE OPENING. PLEASE CORRECT. | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2020-12-22 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-12-22 |
Time |
16:33 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-12-22 |
Time |
16:33 |
Sent To |
|
|
| Notes |
| 2020-12-22 16:43:57 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) THE SPAN FOR THE ARMOR SCREEN IS SPECIFIED AS 80" | | | FOR ALL OF THE OPENINGS IN THE STORM PANEL SCHEDULE. | | | THE SPAN FOR THE FABRIC SCREENS IS THE CENTER TO CENTER | | | DISTANCE BETWEEN THE GROMMETS (ANCHORS) ON EACH SIDE OF | | | THE OPENING. PLEASE CORRECT. | | | | | | 2) THE ENGINEER'S DIGITAL SIGNATURE IS REQUIRED ON THE | | | SITE SPECIFIC ENGINEERING FOR THE ARMOR SCREEN. SEE THE | | | SIGNATURE REVIEW COMMENTS. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2021-01-14 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2021-01-14 |
Time |
09:59 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-01-12 |
Time |
09:55 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2021-01-12 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2021-01-12 |
Time |
08:21 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-01-07 |
Time |
11:12 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-12-22 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-12-22 |
Time |
16:44 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-12-15 |
Time |
15:24 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2021-01-14 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2021-01-14 |
Time |
09:58 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-01-14 |
Time |
09:58 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2021-01-08 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-01-08 |
Time |
13:48 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-01-08 |
Time |
13:48 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2020-12-22 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-12-22 |
Time |
16:33 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-12-22 |
Time |
16:33 |
Sent To |
|
|
| Notes |
| 2020-12-22 16:35:42 | THE SITE SPECIFIC ENGINEERING FOR THE ARMOR SCREEN DOES | | | NOT HAVE THE ENGINEER'S DIGITAL SIGNATURE. | | | ELECTRONICALLY SUBMITTED DRAWINGS ARE REQUIRED TO HAVE | | | THE ENGINEER'S DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE | | | THE OPTION TO SUBMIT THE SIGNED AND SEALED PAPER | | | VERSION OF DRAWINGS. AFTER THE ELECTRONIC PLANS HAVE | | | BEEN APPROVED, YOU CAN SUBMIT THE CORRESPONDING PAPER | | | DRAWINGS AT THE BUILDING DEPARTMENT TO BE VERIFIED. THE | | | ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE AND SEAL IS | | | REQUIRED TO BE ON THE DRAWINGS. NO PHOTOCOPY OR OTHER | | | FACSIMILES OF THE SIGNATURE ARE ACCEPTABLE. FS 471 & | | | 61G15 |
|
|
|