| Plan Review Stops For Permit 20120587 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
P |
Date |
2020-12-14 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-12-14 |
Time |
12:48 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-12-14 |
Time |
12:48 |
Sent To |
|
|
| Notes |
| 2020-12-14 12:48:42 | SEE 18100526 | | | |
|
|
| Review Stop |
AIPP |
ART IN PUBLIC PLACES |
| Rev No |
1 |
Status |
P |
Date |
2021-05-11 |
|
|
Cont ID |
|
| Sent By |
scwelter |
Date |
2021-05-11 |
Time |
15:34 |
Rev Time |
0.00 |
| Received By |
scwelter |
Date |
2021-05-11 |
Time |
15:36 |
Sent To |
|
|
| Notes |
| 2021-05-11 15:36:09 | DEVELOPER SUBMITTED APPLICATION PASS CONTINGENT ON | | | REVIEW BY ART COMMITTEE |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
9 |
Status |
P |
Date |
2023-05-03 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-05-03 |
Time |
15:44 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-05-03 |
Time |
15:44 |
Sent To |
|
|
| Notes |
| 2023-05-03 16:17:49 | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | THE BEACH CLUB WAS PREVIOUSLY REVIEWED UNDER PERMIT | | | #18100526. SOME OF THE CONSTRUCTION DOCUMENTS ARE WITH | | | PERMIT #18100526. | | | | | | BUILDING PROVISO: | | | | | | 1) PROPERTY TO BE REPLATTED PRIOR TO ISSUANCE OF THE | | | FIRST C.O. PER SECTION 6(2)(E)(II) OF RESOLUTION NO. | | | 185-18 (THE "DEVELOPMENT ORDER"). | | | | | | 2) SUBMIT A BUILDING UNDER CONSTRUCTION ELEVATION | | | CERTIFICATE WHEN THE FOUNDATION IS FORMED AND A | | | FINISHED CONSTRUCTION ELEVATION CERTIFICATE BEFORE THE | | | FINAL INSPECTION. | | | | | | 3) FLOOD PROOFING CERTIFICATE AND FINAL SURVEY TO BE | | | SUBMITTED BEFORE FINAL INSPECTION. | | | | | | 4) A SEPARATE ROOF PERMIT IS REQUIRED. PRIOR TO | | | INSTALLATION, SUBMIT ROOF PERMIT APPLICATION WITH | | | PRODUCT APPROVALS REVIEWED BY DESIGNER OF RECORD AND | | | ENGINEERING (IF APPLICABLE). | | | | | | 5) DEFERRED SUBMITTALS REQUESTED BY ARCHITECT. | | | DOCUMENTS SHOWING COMPLIANCE ARE TO BE REVIEWED BY | | | DESIGNER OF RECORD PRIOR TO SUBMITTAL (ARCHITECT OR | | | ENGINEER FOR PRODUCT APPROVALS AND OTHER SPECIFICATION | | | DOCUMENTS, STRUCTURAL ENGINEER OF RECORD APPROVAL AND | | | REVIEW IS REQUIRED FOR DELEGATED ENGINEERING). | | | SUBMITTAL, REVIEW AND APPROVAL ARE REQUIRED PRIOR TO | | | INSTALLATION. | | | | | | 6) COMPONENT & CLADDING PRODUCT APPROVALS REVIEWED BY | | | DESIGNER OF RECORD ARE TO BE SUBMITTED TO THE BUILDING | | | DIVISION, REVIEWED AND ISSUED PRIOR TO INSTALLATION. | | | CONFIRM COMPLIANCE WITH PRESSURES SHOWN ON SHEET S6.0 - | | | S6.3 PRIOR TO SUBMITTAL. IF PRODUCT APPROVAL OFFERS | | | OPTIONS, INDICATE OPTION PROPOSED, ESPECIALLY IF NOT | | | ALL OPTIONS COMPLY WITH MINIMUM DESIGN PRESSURES. | | | | | | 7) SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES) ARE | | | REQUIRED FOR: | | | LIGHT POLES/SITE LIGHTING | | | FIRE ALARM | | | FIRE SPRINKLER | | | LOW VOLTAGE | | | ACCESS | | | LANDSCAPING | | | IRRIGATION | | | PARKING LOT | | | SWIMMING POOLS AND SPAS | | | GENERATORS | | | ALL OTHER ITEMS OTHER THAN BMEP | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
8 |
Status |
F |
Date |
2023-04-24 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-04-24 |
Time |
08:51 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-04-21 |
Time |
16:25 |
Sent To |
|
|
| Notes |
| 2023-04-24 08:41:25 | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | 6TH REVIEW | | | | | | DENIED - * NOTE: THE BEACH CLUB WAS PREVIOUSLY REVIEWED | | | UNDER PERMIT #18100526. SOME OF THE CONSTRUCTION | | | DOCUMENTS ARE WITH PERMIT #18100526. | | | | | | 1) PROVISO. PROPERTY TO BE REPLATTED PRIOR TO ISSUANCE | | | OF THE FIRST C.O. PER SECTION 6(2)(E)(II) OF RESOLUTION | | | NO. 185-18 (THE "DEVELOPMENT ORDER"). | | | | | | 2) NOT RESOLVED. IN ORDER TO BE APPROVED FOR PERMIT, | | | THE PRE-CONSTRUCTION WILL NEED TO BE CORRECTED. THE | | | FLOOD PROOFING CERTIFICATE CAN BE DEFERRED UNTIL THE | | | FINAL INSPECTION. ( FLOOD PROOFING CERTIFICATE AND | | | FINAL SURVEY ARE BEING DEFERRED ) | | | | | | ******************************************************* | | | ******************************************************* | | | ******************************************************* | | | ******************************************************* | | | ******************************************************* | | | ******************************************************* | | | ************************************************** | | | ( THE PRE-CONSTRUCTION ELEVATION CERTIFICATE THAT WAS | | | SUBMITTED HAS THE FOLLOWING ERRORS: | | | -1 SECTION C1 IS MARKED FOR FINISH CONSTRUCTION. THIS | | | IS THE PRE-CONSTRUCTION E.C. WHICH IS BASED ON THE | | | CONSTRUCTION DRAWINGS AND IS SUPPOSED TO BE SUBMITTED | | | AND APPROVED BEFORE THE PERMIT IS ISSUED. | | | -2 SECTION C2. E) IS FOR THE LOWEST EQUIPMENT THAT IS | | | SERVICING THE BUILDING WHICH IS REQUIRED TO BE AT 9'-0" | | | NAVD AND 7.3' IS SPECIFIED. THE COMMENT SECTION STATES | | | THAT THIS IS FOR THE POOL EQUIPMENT PAD. THE POOL | | | EQUIPMENT DOES NOT SERVICE THE BEACH CLUB BUILDING. | | | THIS SHOULD BE EQUIPMENT FOR THE BUILDING ITSELF LIKE | | | A/C. | | | -3 THIS IS A PRE-CONSTRUCTION E.C. SO REMOVE THE PHOTOS | | | OF THE BUILDING FROM THIS ONE, PHOTOS SHOULD ONLY BE | | | ATTACHED TO THE UNDER CONSTRUCTION AND FINISHED | | | CONSTRUCTION ELEVATION CERTIFICATES. ) | | | | | | ******************************************************* | | | ******************************************************* | | | ******************************************************* | | | ******************************************************* | | | ******************************************************* | | | ******************************************************* | | | ************************************************** | | | | | | CORRECTIONS REQUIRED FOR PRE-CONSTRUCTION ELEVATION | | | CERTIFICATE: | | | A) RESOLVED. SECTION A1. THE BUILDING OWNER IS RD IMV | | | OWNER, LLC | | | B) RESOLVED. SECTION A2. THE BUILDING STREET ADDRESS IS | | | 4328 N. FLAGLER DR. | | | C) RESOLVED. SECTION C2 A) MAKE A NOTE IN THE COMMENTS | | | SECTION THAT THE BUILDING IS TO BE DRY FLOOD PROOFED UP | | | TO THE DFE OF 9'-0" NAVD | | | | | | CORRECTIONS REQUIRED FOR THE FLOODPROOFING CERTIFICATE: | | | NOTE: FLOOD PROOFING CERTIFICATE TO BE SUBMITTED PRIOR | | | TO RECIEVING THE CERTIFICATE OF OCCUPANCY. | | | A) THE DRAWING NUMBER 1 OF 2 IN THE PACKAGE WILL NEED | | | TO BE REPLACE BY THE CORRECTED DRAWING 1'-6" WATER | | | HEIGHT TO THE DFE OF 9.00" NAVD. THE CORRECTED DRAWING | | | IS REQUIRED TO BE DIGITALLY SIGNED AND SEALED BY THE | | | ENGINEER PREPARING THE FLOODPROOFING CERTIFICATE. | | | | | | WHEN THE BUILDING IS COMPLETED IN ORDER TO RECIEVE THE | | | C.O. SUBMIT A COMPLETED ELEVATION CERTIFICATE FOR THE | | | FINISHED CONSTRUCTION ALONG WITH A FINAL BOUNDARY | | | SURVEY WITH ELEVATIONS THAT MATCHES THE E.C. AND THE | | | FLOODPROOFING CERTIFICATE. | | | | | | [SUBMIT A CORRECTED FLOOD PROOFING FOR 9.0' NAVD AND A | | | CORRECTED PRECONSTRUCTION ELEVATION CERTIFICATE. SEE | | | THE NFIP REVIEW COMMENTS.] THE FLOOD PROOFING | | | CERTIFICATE AND CALCULATIONS ARE FOR ONE FOOT ABOVE THE | | | BFE WHICH IS 7.0 ' NAVD 88. THE CITY OF WEST PALM | | | BEACH'S FLOOD ORDINANCE REQUIRES A TWO FOOT FREE BOARD. | | | THIS SETS THE DFE AT 9.0' NAVD 88. YOU WILL NEED TO | | | REVISE THE FLOOD PROOFING CERTIFICATE AND CALCULATIONS | | | TO COMPLY WITH THE CITY'S TWO FOOT FREEBOARD | | | REQUIREMENT. | | | | | | (OLD COMMENTS) YOU HAVE INDICATED THAT YOU WISH TO DRY | | | FLOOD PROOF THE BEACH CLUB, PLEASE SUBMIT THE FOLLOWING | | | ITEMS. FBC 1612 | | | | | | [CORRECTIONS REQUIRED TO PRECONSTRUCTION ELEVATION | | | CERTIFICATE. SEE NFIP REVIEW.] A) A NEW | | | PRE-CONSTRUCTION ELEVATION CERTIFICATE FOR THE DRY | | | FLOOD PROOFING. | | | | | | 3) PROVISO. A SEPARATE ROOF PERMIT IS REQUIRED. PRIOR | | | TO INSTALLATION, SUBMIT ROOF PERMIT APPLICATION WITH | | | PRODUCT APPROVALS REVIEWED BY DESIGNER OF RECORD AND | | | ENGINEERING (IF APPLICABLE). | | | | | | 4) PROVISO. DEFERRED SUBMITTALS REQUESTED BY ARCHITECT. | | | DOCUMENTS SHOWING COMPLIANCE ARE TO BE REVIEWED BY | | | DESIGNER OF RECORD PRIOR TO SUBMITTAL (ARCHITECT OR | | | ENGINEER FOR PRODUCT APPROVALS AND OTHER SPECIFICATION | | | DOCUMENTS, STRUCTURAL ENGINEER OF RECORD APPROVAL AND | | | REVIEW IS REQUIRED FOR DELEGATED ENGINEERING). | | | SUBMITTAL, REVIEW AND APPROVAL ARE REQUIRED PRIOR TO | | | INSTALLATION. | | | | | | 5) PROVISO. COMPONENT & CLADDING PRODUCT APPROVALS | | | REVIEWED BY DESIGNER OF RECORD ARE TO BE SUBMITTED TO | | | THE BUILDING DIVISION, REVIEWED AND ISSUED PRIOR TO | | | INSTALLATION. CONFIRM COMPLIANCE WITH PRESSURES SHOWN | | | ON SHEET S6.0 - S6.3 PRIOR TO SUBMITTAL. IF PRODUCT | | | APPROVAL OFFERS OPTIONS, INDICATE OPTION PROPOSED, | | | ESPECIALLY IF NOT ALL OPTIONS COMPLY WITH MINIMUM | | | DESIGN PRESSURES. | | | | | | 6) PROVISO. SEPARATE PERMITS (APPLICATIONS, PLANS, AND | | | FEES) ARE REQUIRED FOR: | | | LIGHT POLES/SITE LIGHTING | | | FIRE ALARM | | | FIRE SPRINKLER | | | LOW VOLTAGE | | | ACCESS | | | LANDSCAPING | | | IRRIGATION | | | PARKING LOT | | | SWIMMING POOLS AND SPAS | | | GENERATORS | | | ALL OTHER ITEMS OTHER THAN BMEP | | | | | | 7) CONSTRUCTION HOURS - 7AM TO 7PM MON-FRI, 8AM TO 8PM | | | SAT-SUN | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
7 |
Status |
F |
Date |
2023-04-11 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-04-11 |
Time |
16:51 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-04-11 |
Time |
16:50 |
Sent To |
|
|
| Notes |
| 2023-04-11 16:50:50 | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | 6TH REVIEW | | | | | | DENIED - * NOTE: THE BEACH CLUB WAS PREVIOUSLY REVIEWED | | | UNDER PERMIT #18100526. SOME OF THE CONSTRUCTION | | | DOCUMENTS ARE WITH PERMIT #18100526. | | | | | | 1) PROVISO. PROPERTY TO BE REPLATTED PRIOR TO ISSUANCE | | | OF THE FIRST C.O. PER SECTION 6(2)(E)(II) OF RESOLUTION | | | NO. 185-18 (THE "DEVELOPMENT ORDER"). | | | | | | 2) NOT RESOLVED. IN ORDER TO BE APPROVED FOR PERMIT, | | | THE PRE-CONSTRUCTION WILL NEED TO BE CORRECTED. THE | | | FLOOD PROOFING CERTIFICATE CAN BE DEFERRED UNTIL THE | | | FINAL INSPECTION. | | | | | | CORRECTIONS REQUIRED FOR PRE-CONSTRUCTION ELEVATION | | | CERTIFICATE: | | | A) SECTION A1. THE BUILDING OWNER IS RD IMV OWNER, LLC | | | B) SECTION A2. THE BUILDING STREET ADDRESS IS 4328 N. | | | FLAGLER DR. | | | C) SECTION C2 A) MAKE A NOTE IN THE COMMENTS SECTION | | | THAT THE BUILDING IS TO BE DRY FLOOD PROOFED UP TO THE | | | DFE OF 9'-0" NAVD | | | | | | CORRECTIONS REQUIRED FOR THE FLOODPROOFING CERTIFICATE: | | | A) THE DRAWING NUMBER 1 OF 2 IN THE PACKAGE WILL NEED | | | TO BE REPLACE BY THE CORRECTED DRAWING 1'-6" WATER | | | HEIGHT TO THE DFE OF 9.00" NAVD. THE CORRECTED DRAWING | | | IS REQUIRED TO BE DIGITALLY SIGNED AND SEALED BY THE | | | ENGINEER PREPARING THE FLOODPROOFING CERTIFICATE. | | | | | | WHEN THE BUILDING IS COMPLETED IN ORDER TO RECIEVE THE | | | C.O. SUBMIT A COMPLETED ELEVATION CERTIFICATE FOR THE | | | FINISHED CONSTRUCTION ALONG WITH A FINAL BOUNDARY | | | SURVEY WITH ELEVATIONS THAT MATCHES THE E.C. AND THE | | | FLOODPROOFING CERTIFICATE. | | | | | | [SUBMIT A CORRECTED FLOOD PROOFING FOR 9.0' NAVD AND A | | | CORRECTED PRECONSTRUCTION ELEVATION CERTIFICATE. SEE | | | THE NFIP REVIEW COMMENTS.] THE FLOOD PROOFING | | | CERTIFICATE AND CALCULATIONS ARE FOR ONE FOOT ABOVE THE | | | BFE WHICH IS 7.0 ' NAVD 88. THE CITY OF WEST PALM | | | BEACH'S FLOOD ORDINANCE REQUIRES A TWO FOOT FREE BOARD. | | | THIS SETS THE DFE AT 9.0' NAVD 88. YOU WILL NEED TO | | | REVISE THE FLOOD PROOFING CERTIFICATE AND CALCULATIONS | | | TO COMPLY WITH THE CITY'S TWO FOOT FREEBOARD | | | REQUIREMENT. | | | | | | (OLD COMMENTS) YOU HAVE INDICATED THAT YOU WISH TO DRY | | | FLOOD PROOF THE BEACH CLUB, PLEASE SUBMIT THE FOLLOWING | | | ITEMS. FBC 1612 | | | | | | [CORRECTIONS REQUIRED TO PRECONSTRUCTION ELEVATION | | | CERTIFICATE. SEE NFIP REVIEW.] A) A NEW | | | PRE-CONSTRUCTION ELEVATION CERTIFICATE FOR THE DRY | | | FLOOD PROOFING. | | | | | | 3) PROVISO. A SEPARATE ROOF PERMIT IS REQUIRED. PRIOR | | | TO INSTALLATION, SUBMIT ROOF PERMIT APPLICATION WITH | | | PRODUCT APPROVALS REVIEWED BY DESIGNER OF RECORD AND | | | ENGINEERING (IF APPLICABLE). | | | | | | 4) PROVISO. DEFERRED SUBMITTALS REQUESTED BY ARCHITECT. | | | DOCUMENTS SHOWING COMPLIANCE ARE TO BE REVIEWED BY | | | DESIGNER OF RECORD PRIOR TO SUBMITTAL (ARCHITECT OR | | | ENGINEER FOR PRODUCT APPROVALS AND OTHER SPECIFICATION | | | DOCUMENTS, STRUCTURAL ENGINEER OF RECORD APPROVAL AND | | | REVIEW IS REQUIRED FOR DELEGATED ENGINEERING). | | | SUBMITTAL, REVIEW AND APPROVAL ARE REQUIRED PRIOR TO | | | INSTALLATION. | | | | | | 5) PROVISO. COMPONENT & CLADDING PRODUCT APPROVALS | | | REVIEWED BY DESIGNER OF RECORD ARE TO BE SUBMITTED TO | | | THE BUILDING DIVISION, REVIEWED AND ISSUED PRIOR TO | | | INSTALLATION. CONFIRM COMPLIANCE WITH PRESSURES SHOWN | | | ON SHEET S6.0 - S6.3 PRIOR TO SUBMITTAL. IF PRODUCT | | | APPROVAL OFFERS OPTIONS, INDICATE OPTION PROPOSED, | | | ESPECIALLY IF NOT ALL OPTIONS COMPLY WITH MINIMUM | | | DESIGN PRESSURES. | | | | | | 6) PROVISO. SEPARATE PERMITS (APPLICATIONS, PLANS, AND | | | FEES) ARE REQUIRED FOR: | | | LIGHT POLES/SITE LIGHTING | | | FIRE ALARM | | | FIRE SPRINKLER | | | LOW VOLTAGE | | | ACCESS | | | LANDSCAPING | | | IRRIGATION | | | PARKING LOT | | | SWIMMING POOLS AND SPAS | | | GENERATORS | | | ALL OTHER ITEMS OTHER THAN BMEP | | | | | | 7) CONSTRUCTION HOURS - 7AM TO 7PM MON-FRI, 8AM TO 8PM | | | SAT-SUN | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
6 |
Status |
F |
Date |
2023-03-30 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-03-30 |
Time |
11:27 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-03-30 |
Time |
10:57 |
Sent To |
|
|
| Notes |
| 2023-03-30 11:27:04 | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | 5TH REVIEW | | | | | | DENIED - * NOTE: THE BEACH CLUB WAS PREVIOUSLY REVIEWED | | | UNDER PERMIT #18100526. SOME OF THE CONSTRUCTION | | | DOCUMENTS ARE WITH PERMIT #18100526. | | | | | | 1) PROVISO. PROPERTY TO BE REPLATTED PRIOR TO ISSUANCE | | | OF THE FIRST C.O. PER SECTION 6(2)(E)(II) OF RESOLUTION | | | NO. 185-18 (THE "DEVELOPMENT ORDER"). | | | | | | 2) NOT RESOLVED. [SUBMIT A CORRECTED FLOOD PROOFING FOR | | | 9.0' NAVD AND A CORRECTED PRECONSTRUCTION ELEVATION | | | CERTIFICATE. SEE THE NFIP REVIEW COMMENTS.] THE FLOOD | | | PROOFING CERTIFICATE AND CALCULATIONS ARE FOR ONE FOOT | | | ABOVE THE BFE WHICH IS 7.0 ' NAVD 88. THE CITY OF WEST | | | PALM BEACH'S FLOOD ORDINANCE REQUIRES A TWO FOOT FREE | | | BOARD. THIS SETS THE DFE AT 9.0' NAVD 88. YOU WILL NEED | | | TO REVISE THE FLOOD PROOFING CERTIFICATE AND | | | CALCULATIONS TO COMPLY WITH THE CITY'S TWO FOOT | | | FREEBOARD REQUIREMENT. | | | | | | (OLD COMMENTS) YOU HAVE INDICATED THAT YOU WISH TO DRY | | | FLOOD PROOF THE BEACH CLUB, PLEASE SUBMIT THE FOLLOWING | | | ITEMS. FBC 1612 | | | | | | [CORRECTIONS REQUIRED TO PRECONSTRUCTION ELEVATION | | | CERTIFICATE. SEE NFIP REVIEW.] A) A NEW | | | PRE-CONSTRUCTION ELEVATION CERTIFICATE FOR THE DRY | | | FLOOD PROOFING. | | | | | | 3) PROVISO. A SEPARATE ROOF PERMIT IS REQUIRED. PRIOR | | | TO INSTALLATION, SUBMIT ROOF PERMIT APPLICATION WITH | | | PRODUCT APPROVALS REVIEWED BY DESIGNER OF RECORD AND | | | ENGINEERING (IF APPLICABLE). | | | | | | 4) PROVISO. DEFERRED SUBMITTALS REQUESTED BY ARCHITECT. | | | DOCUMENTS SHOWING COMPLIANCE ARE TO BE REVIEWED BY | | | DESIGNER OF RECORD PRIOR TO SUBMITTAL (ARCHITECT OR | | | ENGINEER FOR PRODUCT APPROVALS AND OTHER SPECIFICATION | | | DOCUMENTS, STRUCTURAL ENGINEER OF RECORD APPROVAL AND | | | REVIEW IS REQUIRED FOR DELEGATED ENGINEERING). | | | SUBMITTAL, REVIEW AND APPROVAL ARE REQUIRED PRIOR TO | | | INSTALLATION. | | | | | | 5) PROVISO. COMPONENT & CLADDING PRODUCT APPROVALS | | | REVIEWED BY DESIGNER OF RECORD ARE TO BE SUBMITTED TO | | | THE BUILDING DIVISION, REVIEWED AND ISSUED PRIOR TO | | | INSTALLATION. CONFIRM COMPLIANCE WITH PRESSURES SHOWN | | | ON SHEET S6.0 - S6.3 PRIOR TO SUBMITTAL. IF PRODUCT | | | APPROVAL OFFERS OPTIONS, INDICATE OPTION PROPOSED, | | | ESPECIALLY IF NOT ALL OPTIONS COMPLY WITH MINIMUM | | | DESIGN PRESSURES. | | | | | | 6) PROVISO. SEPARATE PERMITS (APPLICATIONS, PLANS, AND | | | FEES) ARE REQUIRED FOR: | | | LIGHT POLES/SITE LIGHTING | | | FIRE ALARM | | | FIRE SPRINKLER | | | LOW VOLTAGE | | | ACCESS | | | LANDSCAPING | | | IRRIGATION | | | PARKING LOT | | | SWIMMING POOLS AND SPAS | | | GENERATORS | | | ALL OTHER ITEMS OTHER THAN BMEP | | | | | | 7) CONSTRUCTION HOURS - 7AM TO 7PM MON-FRI, 8AM TO 8PM | | | SAT-SUN | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
5 |
Status |
F |
Date |
2023-02-21 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-02-21 |
Time |
14:55 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-02-21 |
Time |
14:55 |
Sent To |
|
|
| Notes |
| 2023-02-21 14:55:13 | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | 5TH REVIEW | | | | | | DENIED - * NOTE: THE BEACH CLUB WAS PREVIOUSLY REVIEWED | | | UNDER PERMIT #18100526. SOME OF THE CONSTRUCTION | | | DOCUMENTS ARE WITH PERMIT #18100526. | | | | | | 1) WILL COMPLY. PROPERTY TO BE REPLATTED PRIOR TO | | | ISSUANCE OF THE FIRST C.O. PER SECTION 6(2)(E)(II) OF | | | RESOLUTION NO. 185-18 (THE "DEVELOPMENT ORDER"). | | | | | | 2) NOT RESOLVED. THE FLOOD PROOFING CERTIFICATE AND | | | CALCULATIONS ARE FOR ONE FOOT ABOVE THE BFE WHICH IS | | | 7.0 ' NAVD 88. THE CITY OF WEST PALM BEACH'S FLOOD | | | ORDINANCE REQUIRES A TWO FOOT FREE BOARD. THIS SETS THE | | | DFE AT 9.0' NAVD 88. YOU WILL NEED TO REVISE THE FLOOD | | | PROOFING CERTIFICATE AND CALCULATIONS TO COMPLY WITH | | | THE CITY'S TWO FOOT FREEBOARD REQUIREMENT. | | | | | | (OLD COMMENTS) YOU HAVE INDICATED THAT YOU WISH TO DRY | | | FLOOD PROOF THE BEACH CLUB, PLEASE SUBMIT THE FOLLOWING | | | ITEMS. FBC 1612 | | | | | | [CORRECTIONS REQUIRED TO PRECONSTRUCTION ELEVATION | | | CERTIFICATE. SEE NFIP REVIEW.] A) A NEW | | | PRE-CONSTRUCTION ELEVATION CERTIFICATE FOR THE DRY | | | FLOOD PROOFING. | | | | | | COMPLIED. B) PROVIDE A DRY FLOOD PROOFING PLAN THAT | | | INCLUDES WHERE THE PANELS ARE TO BE STORED AND WHO WILL | | | BE RESPONSIBLE FOR INSTALLING THEM WHEN A FLOOD EVENT | | | IS EXPECTED. | | | | | | [WATERPROOFING FOR THE WALLS IS NOT SHOWN OR SPECIFIED | | | ON THE PLANS.] C) SHOW HOW THE WALLS WILL BE WATER | | | PROOFED UP TO THE DESIGN FLOOD ELEVATION OF 9.0' NAVD | | | 88. | | | | | | [ ANY EQUIPMENT THAT CAN BE DAMAGED FROM FLOOD WATERS | | | ARE REQUIRED TO BE PROTECTED.] D) THE PLANS SHOW | | | KITCHEN EQUIPMENT AND A MEDIA CABINET IN THE OUTSIDE | | | BAR AREA. SPECIFY HOW THAT AREA WILL BE PROTECTED FROM | | | FLOOD WATERS. | | | | | | [ THERE IS NOTHING SHOWN ON THE PLANS OR ANY ENGINEER'S | | | CALCULATIONS TO SHOW THAT THE WALLS ARE CAPABLE OF | | | WITHSTANDING THE FORCES OF FLOOD WATERS. ] E) PROVIDE | | | ENGINEERING TO SHOW THAT THE WALLS OF THE BEACH CLUB | | | WILL BE ABLE TO WITHSTAND THE STATIC AND DYNAMIC | | | PRESSURES FROM FLOOD WATERS UP TO THE DESIGN FLOOD | | | ELEVATION OF 9.0' NAVD 88. | | | | | | I WILL SEND YOU THE REQUIRED FLOOD PROOFING CERTIFICATE | | | FORM AND THE NFPI TECHNICAL BULLETIN ON THE | | | REQUIREMENTS FOR DESIGN AND CERTIFICATION OF DRY FLOOD | | | PROOFING... JUST LET ME KNOW WHERE TO SEND IT. | | | | | | (PREVIOUS COMMENT) SHEET A1.420 SPECIFIES THE FINISH | | | FLOOR ELEVATION FOR THE BEACH CLUB AS 7.64' NAVD 88. | | | SUBMIT THE PRE-CONSTRUCTION ELEVATION CERTIFICATE THAT | | | WAS SUBMITTED FOR THE BEACH CLUB UNDER PERMIT #18100526 | | | HAS THE FFE AS 9.0' NAVD 88. PLEASE CLARIFY. | | | THE PROPERTY IS LOCATED IN AN AE FLOOD ZONE WITH A BASE | | | FLOOD ELEVATION OF 7' NAVD88. THE CITY'S FLOOD | | | ORDINANCE REQUIRES A 2' FREEBOARD WHICH MAKES THE | | | DESIGN FLOOD ELEVATION FOR THIS PROJECT 9.0'. ALL | | | EQUIPMENT SERVICING THE BUILDING IS REQUIRED TO BE AT | | | OR ABOVE 9' NAVD. ELEVATION CERTIFICATES WILL BE | | | REQUIRED TO SHOW COMPLIANCE WITH THE CITY'S FLOOD | | | POLICY. THE CITY REQUIRES THREE ELEVATION CERTIFICATES. | | | THE PRECONSTRUCTION ELEV. CERT. BASED ON THE | | | CONSTRUCTION DRAWING HAS BEEN SUBMITTED. THE SECOND, A | | | CONSTRUCTION ELEV. CERT. BASED ON THE LOWEST FLOOR | | | FORMS AND THE THIRD A FINAL ELEV. CERT. BASED ON THE | | | FINISHED BUILDING ARE TO BE SUBMITTED IN A TIMELY | | | MANNER. THE CITY'S FLOOD ORDINANCE ARTICLE XVII - FLOOD | | | PREVENTION AND CONTROL SEC. 94-546 - PROVISIONS FOR | | | FLOOD HAZARD REDUCTION. | | | | | | 3) WILL COMPLY. A SEPARATE ROOF PERMIT IS REQUIRED. | | | PRIOR TO INSTALLATION, SUBMIT ROOF PERMIT APPLICATION | | | WITH PRODUCT APPROVALS REVIEWED BY DESIGNER OF RECORD | | | AND ENGINEERING (IF APPLICABLE). | | | | | | 4) WILL COMPLY. DEFERRED SUBMITTALS REQUESTED BY | | | ARCHITECT. DOCUMENTS SHOWING COMPLIANCE ARE TO BE | | | REVIEWED BY DESIGNER OF RECORD PRIOR TO SUBMITTAL | | | (ARCHITECT OR ENGINEER FOR PRODUCT APPROVALS AND OTHER | | | SPECIFICATION DOCUMENTS, STRUCTURAL ENGINEER OF RECORD | | | APPROVAL AND REVIEW IS REQUIRED FOR DELEGATED | | | ENGINEERING). SUBMITTAL, REVIEW AND APPROVAL ARE | | | REQUIRED PRIOR TO INSTALLATION. | | | | | | 5) WILL COMPLY. COMPONENT & CLADDING PRODUCT APPROVALS | | | REVIEWED BY DESIGNER OF RECORD ARE TO BE SUBMITTED TO | | | THE BUILDING DIVISION, REVIEWED AND ISSUED PRIOR TO | | | INSTALLATION. CONFIRM COMPLIANCE WITH PRESSURES SHOWN | | | ON SHEET S6.0 - S6.3 PRIOR TO SUBMITTAL. IF PRODUCT | | | APPROVAL OFFERS OPTIONS, INDICATE OPTION PROPOSED, | | | ESPECIALLY IF NOT ALL OPTIONS COMPLY WITH MINIMUM | | | DESIGN PRESSURES. | | | | | | 6) WILL COMPLY. SEPARATE PERMITS (APPLICATIONS, PLANS, | | | AND FEES) ARE REQUIRED FOR: | | | LIGHT POLES/SITE LIGHTING | | | FIRE ALARM | | | FIRE SPRINKLER | | | LOW VOLTAGE | | | ACCESS | | | LANDSCAPING | | | IRRIGATION | | | PARKING LOT | | | SWIMMING POOLS AND SPAS | | | GENERATORS | | | ALL OTHER ITEMS OTHER THAN BMEP | | | | | | 7) WILL COMPLY. CONSTRUCTION HOURS - 7AM TO 7PM | | | MON-FRI, 8AM TO 8PM SAT-SUN | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
F |
Date |
2022-12-22 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-12-22 |
Time |
11:17 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-12-22 |
Time |
06:22 |
Sent To |
|
|
| Notes |
| 2022-12-22 11:15:49 | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | | | | DENIED - * NOTE: THE BEACH CLUB WAS PREVIOUSLY REVIEWED | | | UNDER PERMIT #18100526. SOME OF THE CONSTRUCTION | | | DOCUMENTS ARE WITH PERMIT #18100526. | | | | | | 1) WILL COMPLY. PROPERTY TO BE REPLATTED PRIOR TO | | | ISSUANCE OF THE FIRST C.O. PER SECTION 6(2)(E)(II) OF | | | RESOLUTION NO. 185-18 (THE "DEVELOPMENT ORDER"). | | | | | | 2) NOT RESOLVED. YOU HAVE INDICATED THAT YOU WISH TO | | | DRY FLOOD PROOF THE BEACH CLUB, PLEASE SUBMIT THE | | | FOLLOWING ITEMS. FBC 1612 | | | | | | [CORRECTIONS REQUIRED TO PRECONSTRUCTION ELEVATION | | | CERTIFICATE. SEE NFIP REVIEW.] A) A NEW | | | PRE-CONSTRUCTION ELEVATION CERTIFICATE FOR THE DRY | | | FLOOD PROOFING. | | | | | | COMPLIED. B) PROVIDE A DRY FLOOD PROOFING PLAN THAT | | | INCLUDES WHERE THE PANELS ARE TO BE STORED AND WHO WILL | | | BE RESPONSIBLE FOR INSTALLING THEM WHEN A FLOOD EVENT | | | IS EXPECTED. | | | | | | [WATERPROOFING FOR THE WALLS IS NOT SHOWN OR SPECIFIED | | | ON THE PLANS.] C) SHOW HOW THE WALLS WILL BE WATER | | | PROOFED UP TO THE DESIGN FLOOD ELEVATION OF 9.0' NAVD | | | 88. | | | | | | [ ANY EQUIPMENT THAT CAN BE DAMAGED FROM FLOOD WATERS | | | ARE REQUIRED TO BE PROTECTED.] D) THE PLANS SHOW | | | KITCHEN EQUIPMENT AND A MEDIA CABINET IN THE OUTSIDE | | | BAR AREA. SPECIFY HOW THAT AREA WILL BE PROTECTED FROM | | | FLOOD WATERS. | | | | | | [ THERE IS NOTHING SHOWN ON THE PLANS OR ANY ENGINEER'S | | | CALCULATIONS TO SHOW THAT THE WALLS ARE CAPABLE OF | | | WITHSTANDING THE FORCES OF FLOOD WATERS. ] E) PROVIDE | | | ENGINEERING TO SHOW THAT THE WALLS OF THE BEACH CLUB | | | WILL BE ABLE TO WITHSTAND THE STATIC AND DYNAMIC | | | PRESSURES FROM FLOOD WATERS UP TO THE DESIGN FLOOD | | | ELEVATION OF 9.0' NAVD 88. | | | | | | I WILL SEND YOU THE REQUIRED FLOOD PROOFING CERTIFICATE | | | FORM AND THE NFPI TECHNICAL BULLETIN ON THE | | | REQUIREMENTS FOR DESIGN AND CERTIFICATION OF DRY FLOOD | | | PROOFING... JUST LET ME KNOW WHERE TO SEND IT. | | | | | | (PREVIOUS COMMENT) SHEET A1.420 SPECIFIES THE FINISH | | | FLOOR ELEVATION FOR THE BEACH CLUB AS 7.64' NAVD 88. | | | SUBMIT THE PRE-CONSTRUCTION ELEVATION CERTIFICATE THAT | | | WAS SUBMITTED FOR THE BEACH CLUB UNDER PERMIT #18100526 | | | HAS THE FFE AS 9.0' NAVD 88. PLEASE CLARIFY. | | | THE PROPERTY IS LOCATED IN AN AE FLOOD ZONE WITH A BASE | | | FLOOD ELEVATION OF 7' NAVD88. THE CITY'S FLOOD | | | ORDINANCE REQUIRES A 2' FREEBOARD WHICH MAKES THE | | | DESIGN FLOOD ELEVATION FOR THIS PROJECT 9.0'. ALL | | | EQUIPMENT SERVICING THE BUILDING IS REQUIRED TO BE AT | | | OR ABOVE 9' NAVD. ELEVATION CERTIFICATES WILL BE | | | REQUIRED TO SHOW COMPLIANCE WITH THE CITY'S FLOOD | | | POLICY. THE CITY REQUIRES THREE ELEVATION CERTIFICATES. | | | THE PRECONSTRUCTION ELEV. CERT. BASED ON THE | | | CONSTRUCTION DRAWING HAS BEEN SUBMITTED. THE SECOND, A | | | CONSTRUCTION ELEV. CERT. BASED ON THE LOWEST FLOOR | | | FORMS AND THE THIRD A FINAL ELEV. CERT. BASED ON THE | | | FINISHED BUILDING ARE TO BE SUBMITTED IN A TIMELY | | | MANNER. THE CITY'S FLOOD ORDINANCE ARTICLE XVII - FLOOD | | | PREVENTION AND CONTROL SEC. 94-546 - PROVISIONS FOR | | | FLOOD HAZARD REDUCTION. | | | | | | 3) WILL COMPLY. A SEPARATE ROOF PERMIT IS REQUIRED. | | | PRIOR TO INSTALLATION, SUBMIT ROOF PERMIT APPLICATION | | | WITH PRODUCT APPROVALS REVIEWED BY DESIGNER OF RECORD | | | AND ENGINEERING (IF APPLICABLE). | | | | | | 4) WILL COMPLY. DEFERRED SUBMITTALS REQUESTED BY | | | ARCHITECT. DOCUMENTS SHOWING COMPLIANCE ARE TO BE | | | REVIEWED BY DESIGNER OF RECORD PRIOR TO SUBMITTAL | | | (ARCHITECT OR ENGINEER FOR PRODUCT APPROVALS AND OTHER | | | SPECIFICATION DOCUMENTS, STRUCTURAL ENGINEER OF RECORD | | | APPROVAL AND REVIEW IS REQUIRED FOR DELEGATED | | | ENGINEERING). SUBMITTAL, REVIEW AND APPROVAL ARE | | | REQUIRED PRIOR TO INSTALLATION. | | | | | | 5) WILL COMPLY. COMPONENT & CLADDING PRODUCT APPROVALS | | | REVIEWED BY DESIGNER OF RECORD ARE TO BE SUBMITTED TO | | | THE BUILDING DIVISION, REVIEWED AND ISSUED PRIOR TO | | | INSTALLATION. CONFIRM COMPLIANCE WITH PRESSURES SHOWN | | | ON SHEET S6.0 - S6.3 PRIOR TO SUBMITTAL. IF PRODUCT | | | APPROVAL OFFERS OPTIONS, INDICATE OPTION PROPOSED, | | | ESPECIALLY IF NOT ALL OPTIONS COMPLY WITH MINIMUM | | | DESIGN PRESSURES. | | | | | | 6) WILL COMPLY. SEPARATE PERMITS (APPLICATIONS, PLANS, | | | AND FEES) ARE REQUIRED FOR: | | | LIGHT POLES/SITE LIGHTING | | | FIRE ALARM | | | FIRE SPRINKLER | | | LOW VOLTAGE | | | ACCESS | | | LANDSCAPING | | | IRRIGATION | | | PARKING LOT | | | SWIMMING POOLS AND SPAS | | | GENERATORS | | | ALL OTHER ITEMS OTHER THAN BMEP | | | | | | 7) WILL COMPLY. CONSTRUCTION HOURS - 7AM TO 7PM | | | MON-FRI, 8AM TO 8PM SAT-SUN | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2022-09-30 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-09-30 |
Time |
14:41 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-09-30 |
Time |
09:53 |
Sent To |
|
|
| Notes |
| 2022-09-30 13:13:03 | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | | | | DENIED - * NOTE: THE BEACH CLUB WAS PREVIOUSLY REVIEWED | | | UNDER PERMIT #18100526. SOME OF THE CONSTRUCTION | | | DOCUMENTS ARE WITH PERMIT #18100526. | | | | | | 1) PROPERTY TO BE REPLATTED PRIOR TO ISSUANCE OF THE | | | FIRST C.O. PER SECTION 6(2)(E)(II) OF RESOLUTION NO. | | | 185-18 (THE "DEVELOPMENT ORDER"). | | | | | | 2) YOU HAVE INDICATED THAT YOU WISH TO DRY FLOOD PROOF | | | THE BEACH CLUB, PLEASE SUBMIT THE FOLLOWING ITEMS. FBC | | | 1612 | | | A) A NEW PRE-CONSTRUCTION ELEVATION CERTIFICATE FOR THE | | | DRY FLOOD PROOFING. | | | B) PROVIDE A DRY FLOOD PROOFING PLAN THAT INCLUDES | | | WHERE THE PANELS ARE TO BE STORED AND WHO WILL BE | | | RESPONSIBLE FOR INSTALLING THEM WHEN A FLOOD EVENT IS | | | EXPECTED. | | | C) SHOW HOW THE WALLS WILL BE WATER PROOFED UP TO THE | | | DESIGN FLOOD ELEVATION OF 9.0' NAVD 88. | | | D) THE PLANS SHOW KITCHEN EQUIPMENT AND A MEDIA CABINET | | | IN THE OUTSIDE BAR AREA. SPECIFY HOW THAT AREA WILL BE | | | PROTECTED FROM FLOOD WATERS. | | | E) PROVIDE ENGINEERING TO SHOW THAT THE WALLS OF THE | | | BEACH CLUB WILL BE ABLE TO WITHSTAND THE STATIC AND | | | DYNAMIC PRESSURES FROM FLOOD WATERS UP TO THE DESIGN | | | FLOOD ELEVATION OF 9.0' NAVD 88. | | | I WILL SEND YOU THE REQUIRED FLOOD PROOFING CERTIFICATE | | | FORM AND THE NFPI TECHNICAL BULLETIN ON THE | | | REQUIREMENTS FOR DESIGN AND CERTIFICATION OF DRY FLOOD | | | PROOFING... JUST LET ME KNOW WHERE TO SEND IT. | | | | | | (PREVIOUS COMMENT) SHEET A1.420 SPECIFIES THE FINISH | | | FLOOR ELEVATION FOR THE BEACH CLUB AS 7.64' NAVD 88. | | | SUBMIT THE PRE-CONSTRUCTION ELEVATION CERTIFICATE THAT | | | WAS SUBMITTED FOR THE BEACH CLUB UNDER PERMIT #18100526 | | | HAS THE FFE AS 9.0' NAVD 88. PLEASE CLARIFY. | | | THE PROPERTY IS LOCATED IN AN AE FLOOD ZONE WITH A BASE | | | FLOOD ELEVATION OF 7' NAVD88. THE CITY'S FLOOD | | | ORDINANCE REQUIRES A 2' FREEBOARD WHICH MAKES THE | | | DESIGN FLOOD ELEVATION FOR THIS PROJECT 9.0'. ALL | | | EQUIPMENT SERVICING THE BUILDING IS REQUIRED TO BE AT | | | OR ABOVE 9' NAVD. ELEVATION CERTIFICATES WILL BE | | | REQUIRED TO SHOW COMPLIANCE WITH THE CITY'S FLOOD | | | POLICY. THE CITY REQUIRES THREE ELEVATION CERTIFICATES. | | | THE PRECONSTRUCTION ELEV. CERT. BASED ON THE | | | CONSTRUCTION DRAWING HAS BEEN SUBMITTED. THE SECOND, A | | | CONSTRUCTION ELEV. CERT. BASED ON THE LOWEST FLOOR | | | FORMS AND THE THIRD A FINAL ELEV. CERT. BASED ON THE | | | FINISHED BUILDING ARE TO BE SUBMITTED IN A TIMELY | | | MANNER. THE CITY'S FLOOD ORDINANCE ARTICLE XVII - FLOOD | | | PREVENTION AND CONTROL SEC. 94-546 - PROVISIONS FOR | | | FLOOD HAZARD REDUCTION. | | | | | | 3) A SEPARATE ROOF PERMIT IS REQUIRED. PRIOR TO | | | INSTALLATION, SUBMIT ROOF PERMIT APPLICATION WITH | | | PRODUCT APPROVALS REVIEWED BY DESIGNER OF RECORD AND | | | ENGINEERING (IF APPLICABLE). | | | | | | 4) DEFERRED SUBMITTALS REQUESTED BY ARCHITECT. | | | DOCUMENTS SHOWING COMPLIANCE ARE TO BE REVIEWED BY | | | DESIGNER OF RECORD PRIOR TO SUBMITTAL (ARCHITECT OR | | | ENGINEER FOR PRODUCT APPROVALS AND OTHER SPECIFICATION | | | DOCUMENTS, STRUCTURAL ENGINEER OF RECORD APPROVAL AND | | | REVIEW IS REQUIRED FOR DELEGATED ENGINEERING). | | | SUBMITTAL, REVIEW AND APPROVAL ARE REQUIRED PRIOR TO | | | INSTALLATION. | | | | | | 5) COMPONENT & CLADDING PRODUCT APPROVALS REVIEWED BY | | | DESIGNER OF RECORD ARE TO BE SUBMITTED TO THE BUILDING | | | DIVISION, REVIEWED AND ISSUED PRIOR TO INSTALLATION. | | | CONFIRM COMPLIANCE WITH PRESSURES SHOWN ON SHEET S6.0 - | | | S6.3 PRIOR TO SUBMITTAL. IF PRODUCT APPROVAL OFFERS | | | OPTIONS, INDICATE OPTION PROPOSED, ESPECIALLY IF NOT | | | ALL OPTIONS COMPLY WITH MINIMUM DESIGN PRESSURES. | | | | | | 6) SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES) ARE | | | REQUIRED FOR: | | | LIGHT POLES/SITE LIGHTING | | | FIRE ALARM | | | FIRE SPRINKLER | | | LOW VOLTAGE | | | ACCESS | | | LANDSCAPING | | | IRRIGATION | | | PARKING LOT | | | SWIMMING POOLS AND SPAS | | | GENERATORS | | | ALL OTHER ITEMS OTHER THAN BMEP | | | | | | 7) CONSTRUCTION HOURS - 7AM TO 7PM MON-FRI, 8AM TO 8PM | | | SAT-SUN | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2022-07-13 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-07-13 |
Time |
14:24 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-07-13 |
Time |
10:38 |
Sent To |
|
|
| Notes |
| 2022-07-13 14:24:53 | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | | | | DENIED - * NOTE: THE BEACH CLUB WAS PREVIOUSLY REVIEWED | | | UNDER PERMIT #18100526. SOME OF THE CONSTRUCTION | | | DOCUMENTS ARE WITH PERMIT #18100526. | | | | | | 1) PROPERTY TO BE REPLATTED PRIOR TO ISSUANCE OF THE | | | FIRST C.O. PER SECTION 6(2)(E)(II) OF RESOLUTION NO. | | | 185-18 (THE "DEVELOPMENT ORDER"). | | | | | | 2) SHEET A1.420 SPECIFIES THE FINISH FLOOR ELEVATION | | | FOR THE BEACH CLUB AS 7.64' NAVD 88. THE | | | PRE-CONSTRUCTION ELEVATION CERTIFICATE THAT WAS | | | SUBMITTED FOR THE BEACH CLUB UNDER PERMIT #18100526 HAS | | | THE FFE AS 9.0' NAVD 88. PLEASE CLARIFY. | | | THE PROPERTY IS LOCATED IN AN AE FLOOD ZONE WITH A BASE | | | FLOOD ELEVATION OF 7' NAVD88. THE CITY'S FLOOD | | | ORDINANCE REQUIRES A 2' FREEBOARD WHICH MAKES THE | | | DESIGN FLOOD ELEVATION FOR THIS PROJECT 9.0'. ALL | | | EQUIPMENT SERVICING THE BUILDING IS REQUIRED TO BE AT | | | OR ABOVE 9' NAVD. ELEVATION CERTIFICATES WILL BE | | | REQUIRED TO SHOW COMPLIANCE WITH THE CITY'S FLOOD | | | POLICY. THE CITY REQUIRES THREE ELEVATION CERTIFICATES. | | | THE PRECONSTRUCTION ELEV. CERT. BASED ON THE | | | CONSTRUCTION DRAWING HAS BEEN SUBMITTED. THE SECOND, A | | | CONSTRUCTION ELEV. CERT. BASED ON THE LOWEST FLOOR | | | FORMS AND THE THIRD A FINAL ELEV. CERT. BASED ON THE | | | FINISHED BUILDING ARE TO BE SUBMITTED IN A TIMELY | | | MANNER. THE CITY'S FLOOD ORDINANCE ARTICLE XVII - FLOOD | | | PREVENTION AND CONTROL SEC. 94-546 - PROVISIONS FOR | | | FLOOD HAZARD REDUCTION. | | | | | | 3) A SEPARATE ROOF PERMIT IS REQUIRED. PRIOR TO | | | INSTALLATION, SUBMIT ROOF PERMIT APPLICATION WITH | | | PRODUCT APPROVALS REVIEWED BY DESIGNER OF RECORD AND | | | ENGINEERING (IF APPLICABLE). | | | | | | 4) DEFERRED SUBMITTALS REQUESTED BY ARCHITECT. | | | DOCUMENTS SHOWING COMPLIANCE ARE TO BE REVIEWED BY | | | DESIGNER OF RECORD PRIOR TO SUBMITTAL (ARCHITECT OR | | | ENGINEER FOR PRODUCT APPROVALS AND OTHER SPECIFICATION | | | DOCUMENTS, STRUCTURAL ENGINEER OF RECORD APPROVAL AND | | | REVIEW IS REQUIRED FOR DELEGATED ENGINEERING). | | | SUBMITTAL, REVIEW AND APPROVAL ARE REQUIRED PRIOR TO | | | INSTALLATION. | | | | | | 5) COMPONENT & CLADDING PRODUCT APPROVALS REVIEWED BY | | | DESIGNER OF RECORD ARE TO BE SUBMITTED TO THE BUILDING | | | DIVISION, REVIEWED AND ISSUED PRIOR TO INSTALLATION. | | | CONFIRM COMPLIANCE WITH PRESSURES SHOWN ON SHEET S6.0 - | | | S6.3 PRIOR TO SUBMITTAL. IF PRODUCT APPROVAL OFFERS | | | OPTIONS, INDICATE OPTION PROPOSED, ESPECIALLY IF NOT | | | ALL OPTIONS COMPLY WITH MINIMUM DESIGN PRESSURES. | | | | | | 6) SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES) ARE | | | REQUIRED FOR: | | | LIGHT POLES/SITE LIGHTING | | | FIRE ALARM | | | FIRE SPRINKLER | | | LOW VOLTAGE | | | ACCESS | | | LANDSCAPING | | | IRRIGATION | | | PARKING LOT | | | SWIMMING POOLS AND SPAS | | | GENERATORS | | | ALL OTHER ITEMS OTHER THAN BMEP | | | | | | 7) CONSTRUCTION HOURS - 7AM TO 7PM MON-FRI, 8AM TO 8PM | | | SAT-SUN | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2021-04-21 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2021-04-21 |
Time |
16:00 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-04-21 |
Time |
16:00 |
Sent To |
|
|
| Notes |
| 2020-12-14 12:48:58 | SEE 18100526 | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2021-12-13 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2021-12-13 |
Time |
11:08 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2021-12-13 |
Time |
11:05 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2021-04-22 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2021-04-22 |
Time |
07:54 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2021-04-22 |
Time |
07:54 |
Sent To |
|
|
| Notes |
| 2021-04-22 08:00:31 | CONTACTED FRED GRAY FOR LOCATION OF PLANS FOR KITCHEN | | | LAYOUT. 4/23/21 JL | | | | | | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | | | FLORIDA BUILDING CODE 2017 6TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | | NFPA 70 2014 EDITION | | | | | | JAKE LEAHY BN, BU, PX | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | 1) AREA OUTSIDE OF THE BATHROOM, LOOKS LIKE A KITCHEN | | | HAS NO ELECTRICAL PLAN I CAN FIND, PLEASE DIRECT TO OR | | | SUBMIT PLAN. IT HAS A RISER WITH TWO PANELS SHOWING | | | ICEMAKER AND OTHER EQUIPMENT NOT SHOWN ON PLANS. | | | | | | 2) IS THERE ANY LIGHTING OUTSIDE AT KITCHEN/BAR? |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
P |
Date |
2021-04-22 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2021-04-22 |
Time |
|
Rev Time |
|
| Received By |
rrossano |
Date |
2021-04-22 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-04-22 07:09:05 | REVIEWED UNDER ENGINEERING SUBMITTAL E17090009. |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2021-04-21 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2021-04-21 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2021-04-21 |
Time |
16:16 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
P |
Date |
2022-05-28 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2022-05-28 |
Time |
10:04 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2022-05-28 |
Time |
10:04 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
P |
Date |
2021-11-19 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-11-19 |
Time |
12:56 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-11-19 |
Time |
12:56 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
10 |
Status |
N |
Date |
2023-05-03 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-05-03 |
Time |
16:18 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-05-03 |
Time |
09:23 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
9 |
Status |
N |
Date |
2023-04-24 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-04-24 |
Time |
08:54 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-04-18 |
Time |
10:00 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
8 |
Status |
N |
Date |
2023-04-13 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2023-04-13 |
Time |
08:46 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2023-04-03 |
Time |
16:45 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
7 |
Status |
N |
Date |
2023-03-30 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-03-30 |
Time |
11:52 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-03-17 |
Time |
12:50 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
6 |
Status |
N |
Date |
2023-02-22 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-02-22 |
Time |
15:34 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-02-14 |
Time |
16:55 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2022-12-22 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-12-22 |
Time |
16:42 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-12-12 |
Time |
09:23 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2022-10-04 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2022-10-04 |
Time |
15:57 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2022-08-17 |
Time |
06:26 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2022-07-14 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2022-07-14 |
Time |
07:58 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2022-05-24 |
Time |
11:57 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-04-10 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2022-04-10 |
Time |
07:00 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2021-10-21 |
Time |
12:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2021-08-26 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2021-08-26 |
Time |
15:28 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2021-04-21 |
Time |
15:04 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
1 |
Status |
P |
Date |
2022-07-15 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2022-07-15 |
Time |
10:04 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2021-04-21 |
Time |
15:08 |
Sent To |
|
|
| Notes |
| 2022-07-13 16:52:09 | 7/13/22 IMPACT FEES PAID UNDER 18100526. EMAIL FROM | | | PBCGOV UPLOADED AO | | 2022-07-13 11:54:47 | 7/13/22 EMAILED IMPACT AGAIN FOR REVIEW-AO | | 2021-04-21 15:09:53 | 04/21/21 IMPACT FEES QUESTIONNAIRE UPLOADED IN | | | PROJECTDOX. EMAILED PBC IMPACT FEES OFFICE.CC |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2021-11-04 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-11-04 |
Time |
09:47 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-11-04 |
Time |
09:47 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2021-04-21 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-04-21 |
Time |
15:53 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-01-27 |
Time |
14:49 |
Sent To |
|
|
| Notes |
| 2021-04-21 15:53:43 | 1) PER PRIVISO ON THE MASTER PERMIT PLEASE PROVIDE THE | | | KITCHEN EQUIPMENT. | | | 2) PLEASE PROVIDE THE SHEET NUMBER FOR THE BEACH CLUB | | | ON THE MASTER PLANS. | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | | | 2021-01-27 14:50:24 | PLEASE SEE PERMIT #18100526 |
|
|
| Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
| Rev No |
8 |
Status |
P |
Date |
2023-05-03 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-05-03 |
Time |
15:45 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-05-03 |
Time |
15:44 |
Sent To |
|
|
| Notes |
| 2023-05-03 16:21:17 | 1) SUBMIT A BUILDING UNDER CONSTRUCTION ELEVATION | | | CERTIFICATE WHEN THE FOUNDATION IS FORMED AND A | | | FINISHED CONSTRUCTION ELEVATION CERTIFICATE BEFORE THE | | | FINAL INSPECTION. | | | | | | 2) FLOOD PROOFING CERTIFICATE AND FINAL SURVEY TO BE | | | SUBMITTED BEFORE FINAL INSPECTION. |
|
|
| Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
| Rev No |
7 |
Status |
F |
Date |
2023-04-24 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-04-24 |
Time |
08:54 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-04-21 |
Time |
16:25 |
Sent To |
|
|
| Notes |
| 2023-04-24 08:54:06 | THE PRE-CONSTRUCTION ELEVATION CERTIFICATE THAT WAS | | | SUBMITTED HAS THE FOLLOWING ERRORS: | | | -1 SECTION C1 IS MARKED FOR FINISH CONSTRUCTION. THIS | | | IS THE PRE-CONSTRUCTION E.C. WHICH IS BASED ON THE | | | CONSTRUCTION DRAWINGS AND IS SUPPOSED TO BE SUBMITTED | | | AND APPROVED BEFORE THE PERMIT IS ISSUED. | | | -2 SECTION C2. E) IS FOR THE LOWEST EQUIPMENT THAT IS | | | SERVICING THE BUILDING WHICH IS REQUIRED TO BE AT 9'-0" | | | NAVD AND 7.3' IS SPECIFIED. THE COMMENT SECTION STATES | | | THAT THIS IS FOR THE POOL EQUIPMENT PAD. THE POOL | | | EQUIPMENT DOES NOT SERVICE THE BEACH CLUB BUILDING. | | | THIS SHOULD BE EQUIPMENT FOR THE BUILDING ITSELF LIKE | | | A/C. ) | | | -3 THIS IS A PRE-CONSTRUCTION E.C. SO REMOVE THE PHOTOS | | | OF THE BUILDING FROM THIS ONE, PHOTOS SHOULD ONLY BE | | | ATTACHED TO THE UNDER CONSTRUCTION AND FINISHED | | | CONSTRUCTION ELEVATION CERTIFICATES. | | | |
|
|
| Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
| Rev No |
6 |
Status |
F |
Date |
2023-04-11 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-04-11 |
Time |
16:51 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-04-11 |
Time |
16:51 |
Sent To |
|
|
| Notes |
| 2023-04-11 16:52:31 | IN ORDER TO BE APPROVED FOR PERMIT, THE | | | PRE-CONSTRUCTION WILL NEED TO BE CORRECTED. THE FLOOD | | | PROOFING CERTIFICATE CAN BE DEFERRED UNTIL THE FINAL | | | INSPECTION. | | | | | | CORRECTIONS REQUIRED FOR PRE-CONSTRUCTION ELEVATION | | | CERTIFICATE: | | | A) SECTION A1. THE BUILDING OWNER IS RD IMV OWNER, LLC | | | B) SECTION A2. THE BUILDING STREET ADDRESS IS 4328 N. | | | FLAGLER DR. | | | C) SECTION C2 A) MAKE A NOTE IN THE COMMENTS SECTION | | | THAT THE BUILDING IS TO BE DRY FLOOD PROOFED UP TO THE | | | DFE OF 9'-0" NAVD | | | | | | CORRECTIONS REQUIRED FOR THE FLOODPROOFING CERTIFICATE: | | | A) THE DRAWING NUMBER 1 OF 2 IN THE PACKAGE WILL NEED | | | TO BE REPLACE BY THE CORRECTED DRAWING 1'-6" WATER | | | HEIGHT TO THE DFE OF 9.00" NAVD. THE CORRECTED DRAWING | | | IS REQUIRED TO BE DIGITALLY SIGNED AND SEALED BY THE | | | ENGINEER PREPARING THE FLOODPROOFING CERTIFICATE. | | | | | | WHEN THE BUILDING IS COMPLETED IN ORDER TO RECIEVE THE | | | C.O. SUBMIT A COMPLETED ELEVATION CERTIFICATE FOR THE | | | FINISHED CONSTRUCTION ALONG WITH A FINAL BOUNDARY | | | SURVEY WITH ELEVATIONS THAT MATCHES THE E.C. AND THE | | | FLOODPROOFING CERTIFICATE. |
|
|
| Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
| Rev No |
5 |
Status |
F |
Date |
2023-03-30 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-03-30 |
Time |
11:14 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-03-30 |
Time |
10:57 |
Sent To |
|
|
| Notes |
| 2023-03-30 11:13:55 | ELEVATION CERTIFICATE REVIEW | | | DENIED | | | | | | THESE REQUESTED CORRECTIONS HAVE NOT BEEN MADE. PLEASE | | | MAKE THE FOLLOWING CORRECTIONS. | | | | | | SECTION A1. THE OWNERS NAME IS SHOULD BE RD IMV OWNER | | | LLC | | | | | | SECTION A2. THE ADDRESS SHOULD BE 4328 N. FLAGLER DR. | | | | | | SECTION A4. THIS SHOULD STATE NON-RESIDENTIAL. | | | | | | SECTION C2 F). SPECIFY THE LOWEST ADJACENT GRADE NEXT | | | TO THE BUILDING. (LAG) | | | | | | SECTION C2 G) SPECIFY THE HIGHEST ADJACENT GRADE NEXT | | | TO THE BUILDING. (HAG) | | | | | | THE COMMENTS SECTION SHOULD SPECIFY THAT THE STRUCTURE | | | IS BEING DRY FLOOD PROOFED UP TO THE DFE OF 9.0' NAVD | | | 88, SEE FLOOD PROOFING CERTIFICATE. | | | | | | THE FLOOD PROOFING CERTIFICATE AND OTHER DOCUMENTS ARE | | | REQUIRED TO BE AT 9.0' NAVD 88 IN ORDER TO MEET THE | | | CITY OF WEST PALM BEACHES MORE STRINGENT REQUIREMENT OF | | | A 2' FREEBOARD ABOVE BFE. | | | | | | | | | | | | | | | |
|
|
| Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
| Rev No |
4 |
Status |
F |
Date |
2023-02-22 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-02-22 |
Time |
15:34 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-02-21 |
Time |
14:55 |
Sent To |
|
|
| Notes |
| 2023-02-21 14:57:42 | NOT RESULTED PENDING PEER REVIEW. | | | | | | ELEVATION CERTIFICATE REVIEW | | | DENIED | | | | | | PLEASE MAKE THE FOLLOWING CORRECTIONS. | | | | | | SECTION A1. THE OWNERS NAME IS SHOULD BE RD IMV OWNER | | | LLC | | | | | | SECTION A2. THE ADDRESS SHOULD BE 4328 N. FLAGLER DR. | | | | | | SECTION A4. THIS SHOULD STATE NON-RESIDENTIAL. | | | | | | SECTION C2 E). SPECIFY THE LOWEST ELEVATION OF THE | | | MACHINERY OR EQUIPMENT SERVICING THE BUILDING. | | | | | | SECTION C2 F). SPECIFY THE LOWEST ADJACENT GRADE NEXT | | | TO THE BUILDING. (LAG) | | | | | | SECTION C2 G) SPECIFY THE HIGHEST ADJACENT GRADE NEXT | | | TO THE BUILDING. (HAG) | | | | | | THE COMMENTS SECTION SHOULD SPECIFY THAT THE STRUCTURE | | | IS BEING DRY FLOOD PROOFED UP TO THE DFE OF 9.0' NAVD | | | 88. | | | THE COMMENT (INCLUDING TYPE OF EQUIPMENT AND LOCATION, | | | PER C2(E), IF APPLICABLE ) NEEDS TO BE CLEARIFIED. DO | | | YOU MEAN THAT THE EQUIPMENT WILL BE LOCATED AT DFE OF | | | 9.0' NAVD 88? | | | | | | DID NOT SEE THIS ON THE DRAWINGS FBC 1612.5 FLOOD | | | HAZARD DOCUMENTATION. | | | THE FOLLOWING DOCUMENTATION SHALL BE PREPARED AND | | | SEALED BY A REGISTERED DESIGN PROFESSIONAL AND | | | SUBMITTED TO THE BUILDING OFFICIAL: | | | 1.FOR CONSTRUCTION IN FLOOD HAZARD AREAS OTHER THAN | | | COASTAL HIGH HAZARD AREAS OR COASTAL A ZONES: | | | 1.3.FOR DRY FLOODPROOFED NONRESIDENTIAL BUILDINGS, | | | CONSTRUCTION DOCUMENTS SHALL INCLUDE A STATEMENT THAT | | | THE DRY FLOODPROOFING IS DESIGNED IN ACCORDANCE WITH | | | ASCE 24. | | | | | | THE FLOOD PROOFING CERTIFICATE AND OTHER DOCUMENTS ARE | | | REQUIRED TO BE AT 9.0' NAVD 88 IN ORDER TO MEET THE | | | CITY OF WEST PALM BEACHES MORE STRINGENT REQUIREMENT OF | | | A 2' FREEBOARD ABOVE BFE. | | | | | | | | | | | | | | | |
|
|
| Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
| Rev No |
3 |
Status |
F |
Date |
2022-12-22 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-12-22 |
Time |
16:42 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-12-22 |
Time |
11:17 |
Sent To |
|
|
| Notes |
| 2022-12-22 12:46:12 | ELEVATION CERTIFICATE REVIEW | | | DENIED | | | | | | PLEASE MAKE THE FOLLOWING CORRECTIONS. | | | | | | SECTION A1. THE OWNERS NAME IS SHOULD BE RD IMV OWNER | | | LLC | | | | | | SECTION A2. THE ADDRESS SHOULD BE 4328 N. FLAGLER DR. | | | | | | SECTION A4. SHOULD BE NON-RESIDENTIAL. | | | | | | SECTION C2(E). SHOULD SPECIFY THE LOWEST ELEVATION OF | | | EQUIPMENT SERVICING THE BUILDING. | | | | | | THE DIGITAL SIGNATURE OF THE SURVEYOR COULD NOT BE | | | VERIFIED. | | | | | | DID NOT SEE THIS ON THE DRAWINGS ??? FBC 1612.5 FLOOD | | | HAZARD DOCUMENTATION. | | | THE FOLLOWING DOCUMENTATION SHALL BE PREPARED AND | | | SEALED BY A REGISTERED DESIGN PROFESSIONAL AND | | | SUBMITTED TO THE BUILDING OFFICIAL: | | | 1.FOR CONSTRUCTION IN FLOOD HAZARD AREAS OTHER THAN | | | COASTAL HIGH HAZARD AREAS OR COASTAL A ZONES: | | | 1.3.FOR DRY FLOODPROOFED NONRESIDENTIAL BUILDINGS, | | | CONSTRUCTION DOCUMENTS SHALL INCLUDE A STATEMENT THAT | | | THE DRY FLOODPROOFING IS DESIGNED IN ACCORDANCE WITH | | | ASCE 24. | | | | | | SUBMIT THE FLOOD PROOFING CERTIFICATE FORM. | | | | | | | | | |
|
|
| Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
| Rev No |
2 |
Status |
F |
Date |
2022-09-30 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-09-30 |
Time |
10:59 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-09-30 |
Time |
09:53 |
Sent To |
|
|
| Notes |
| 2022-09-30 11:01:12 | SHEET A1.420 SPECIFIES THE FINISH FLOOR ELEVATION FOR | | | THE BEACH CLUB AS 7.64' NAVD 88. SUBMIT A | | | PRE-CONSTRUCTION ELEVATION FOR DRY FLOOD PROOFING. THE | | | PROPERTY IS LOCATED IN AN AE FLOOD ZONE WITH A BASE | | | FLOOD ELEVATION OF 7' NAVD88. THE CITY'S FLOOD | | | ORDINANCE REQUIRES A 2' FREEBOARD WHICH MAKES THE | | | DESIGN FLOOD ELEVATION FOR THIS PROJECT 9.0'. ALL | | | EQUIPMENT SERVICING THE BUILDING IS REQUIRED TO BE AT | | | OR ABOVE 9' NAVD. ELEVATION CERTIFICATES WILL BE | | | REQUIRED TO SHOW COMPLIANCE WITH THE CITY'S FLOOD | | | POLICY. THE CITY REQUIRES THREE ELEVATION CERTIFICATES. | | | THE PRECONSTRUCTION ELEV. CERT. BASED ON THE | | | CONSTRUCTION DRAWING HAS BEEN SUBMITTED. THE SECOND, A | | | CONSTRUCTION ELEV. CERT. BASED ON THE LOWEST FLOOR | | | FORMS AND THE THIRD A FINAL ELEV. CERT. BASED ON THE | | | FINISHED BUILDING ARE TO BE SUBMITTED IN A TIMELY | | | MANNER. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED | | | FOR THE PROJECT UNTIL THE FINAL ELEVATION CERTIFICATE | | | HAS BEEN REVIEWED AND APPROVED BY THIS OFFICE. THE | | | CITY'S FLOOD ORDINANCE ARTICLE XVII - FLOOD PREVENTION | | | AND CONTROL SEC. 94-546 - PROVISIONS FOR FLOOD HAZARD | | | REDUCTION. |
|
|
| Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
| Rev No |
1 |
Status |
F |
Date |
2022-07-13 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-07-13 |
Time |
14:25 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-07-13 |
Time |
14:25 |
Sent To |
|
|
| Notes |
| 2022-07-13 14:29:57 | SHEET A1.420 SPECIFIES THE FINISH FLOOR ELEVATION FOR | | | THE BEACH CLUB AS 7.64' NAVD 88. THE PRE-CONSTRUCTION | | | ELEVATION CERTIFICATE THAT WAS SUBMITTED FOR THE BEACH | | | CLUB UNDER PERMIT #18100526 HAS THE FFE AS 9.0' NAVD | | | 88. PLEASE CLARIFY. | | | THE PROPERTY IS LOCATED IN AN AE FLOOD ZONE WITH A BASE | | | FLOOD ELEVATION OF 7' NAVD88. THE CITY'S FLOOD | | | ORDINANCE REQUIRES A 2' FREEBOARD WHICH MAKES THE | | | DESIGN FLOOD ELEVATION FOR THIS PROJECT 9.0'. ALL | | | EQUIPMENT SERVICING THE BUILDING IS REQUIRED TO BE AT | | | OR ABOVE 9' NAVD. ELEVATION CERTIFICATES WILL BE | | | REQUIRED TO SHOW COMPLIANCE WITH THE CITY'S FLOOD | | | POLICY. THE CITY REQUIRES THREE ELEVATION CERTIFICATES. | | | THE PRECONSTRUCTION ELEV. CERT. BASED ON THE | | | CONSTRUCTION DRAWING HAS BEEN SUBMITTED. THE SECOND, A | | | CONSTRUCTION ELEV. CERT. BASED ON THE LOWEST FLOOR | | | FORMS AND THE THIRD A FINAL ELEV. CERT. BASED ON THE | | | FINISHED BUILDING ARE TO BE SUBMITTED IN A TIMELY | | | MANNER. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED | | | FOR THE PROJECT UNTIL THE FINAL ELEVATION CERTIFICATE | | | HAS BEEN REVIEWED AND APPROVED BY THIS OFFICE. THE | | | CITY'S FLOOD ORDINANCE ARTICLE XVII - FLOOD PREVENTION | | | AND CONTROL SEC. 94-546 - PROVISIONS FOR FLOOD HAZARD | | | REDUCTION. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
6 |
Status |
P |
Date |
2023-02-15 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2023-02-15 |
Time |
15:24 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2023-02-15 |
Time |
15:24 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
5 |
Status |
P |
Date |
2022-09-07 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2022-09-07 |
Time |
10:37 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2022-09-07 |
Time |
10:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
4 |
Status |
F |
Date |
2022-08-22 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2022-08-22 |
Time |
07:41 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2022-08-22 |
Time |
07:41 |
Sent To |
|
|
| Notes |
| 2022-08-22 07:48:03 | 4TH PLUMBING REVIEW | | | | | | V7 FPC - 2020 FLORIDA PLUMBING CODE | | | V7 FGC - 2020 FLORIDA FUEL GAS | | | V7 FRC - 2020 FLORIDA RESIDENTIAL BUILDING CODE | | | V7 FAC - 2020 FLORIDA ACCESSIBILITY CODE | | | V7 FEX - 2020 FLORIDA EXISTING BUILDING CODE | | | V7 FEC - 2020 FLORIDA ENERGY CONSERVATION | | | 2021 F.S. - 2021 FLORIDA STATUTES | | | 2021 F.A.C. - 2021 FLORIDA ADMINISTRATIVE CODE | | | 2017 WPB AMEND - 2017 WEST PALM BEACH AMENDMENTS TO THE | | | FBC CHAPTER 1 | | | | | | THIS PLAN WAS REVIEWED FOR CODE COMPLIANCE AND FAILED | | | BY RYAN BROWN WITH THE FOLLOWING COMMENTS. | | | | | | 1. DONE | | | | | | 2. DONE | | | | | | 3. THERE NEEDS TO BE ONE AT EACH HOT WATER SOURCE | | | INCLUDING THE WATER HEATER. THIS REQUIREMENT IS FOR ALL | | | HOT WATER, NOT JUST TEMPERED WATER AT PUBLIC HAND | | | WASHING STATIONS. 2020 FPC - 607.1.1 TEMPERATURE | | | LIMITING MEANS - THE THERMOSTAT CONTROL ON THE WATER | | | HEATER CANNOT BE THE LIMITING DEVICE FOR HOT WATER | | | DELIVERY. PLEASE PROVIDE A DETAIL FOR A LIMITING DEVICE | | | FOR THE PURPOSE OF HOT WATER DELIVERY. THIS WOULD BE IN | | | ADDITION TO THE REQUIREMENTS FOR TEMPERED WATER FOR | | | PUBLIC HANDWASHING 607.1.2/419.5. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM. | | | | | | | | | RYAN W. BROWN | | | CHIEF PLUMBING INSPECTOR | | | OFFICE: 561-805-6692 | | | CELL: 561-517-4293 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
F |
Date |
2022-05-28 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2022-05-28 |
Time |
10:04 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2022-05-28 10:04:25 | 3RD PLUMBING REVIEW | | | | | | V7 FPC - 2020 FLORIDA PLUMBING CODE | | | V7 FGC - 2020 FLORIDA FUEL GAS | | | V7 FRC - 2020 FLORIDA RESIDENTIAL BUILDING CODE | | | V7 FAC - 2020 FLORIDA ACCESSIBILITY CODE | | | V7 FEX - 2020 FLORIDA EXISTING BUILDING CODE | | | V7 FEC - 2020 FLORIDA ENERGY CONSERVATION | | | 2021 F.S. - 2021 FLORIDA STATUTES | | | 2021 F.A.C. - 2021 FLORIDA ADMINISTRATIVE CODE | | | 2017 WPB AMEND - 2017 WEST PALM BEACH AMENDMENTS TO THE | | | FBC CHAPTER 1 | | | | | | THIS PLAN WAS REVIEWED FOR CODE COMPLIANCE AND FAILED | | | BY RYAN BROWN WITH THE FOLLOWING COMMENTS. | | | | | | 1. 2020 FPC 1003.3.1 - THE GREASE INTERCEPTOR SHALL | | | ONLY RECEIVE DISCHARGE FROM FIXTURES AND EQUIPMENT THAT | | | ALLOW FATS, OILS OR GREASE TO BE DISCHARGED. THE | | | HANDSINKS AND ICEMAKER CANNOT DISCHARGE INTO THE GREASE | | | WASTE. | | | | | | 2. CITY ORDINANCE SEC. 90 - 126 - THE POOL BACKWASH | | | DISCHARGE CANNOT GO DIRECTLY INTO THE SANITARY UNLESS | | | SPECIFICALLY AUTHORIZED BY THE CITY IN WRITING OR | | | OTHERWISE TREATED 1ST. | | | | | | 3. 2020 FPC - 607.1.1 TEMPERATURE LIMITING MEANS - THE | | | THERMOSTAT CONTROL ON THE WATER HEATER CANNOT BE THE | | | LIMITING DEVICE FOR HOT WATER DELIVERY. PLEASE PROVIDE | | | A DETAIL FOR A LIMITING DEVICE FOR THE PURPOSE OF HOT | | | WATER DELIVERY. THIS WOULD BE IN ADDITION TO THE | | | REQUIREMENTS FOR TEMPERED WATER FOR PUBLIC HANDWASHING | | | 607.1.2/419.5. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM. | | | | | | | | | RYAN W. BROWN | | | CHIEF PLUMBING INSPECTOR | | | OFFICE: 561-805-6692 | | | CELL: 561-517-4293 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2021-11-19 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-11-19 |
Time |
11:52 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-11-19 |
Time |
11:30 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2021-04-22 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-04-22 |
Time |
14:51 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-04-22 |
Time |
11:59 |
Sent To |
|
|
| Notes |
| 2021-04-22 14:52:34 | 04/22/21 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS | | | | | | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS | | | TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE | | | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. | | | | | | 1. PLEASE PROVIDE A SET OF PLANS FOR THE KITCHEN/BAR | | | AREA THAT INCUR SANITARY, WATER, AND GAS PER THE WPB | | | AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON | | | CONSTRUCTION DOCUMENTS. | | | | | | WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & | | | REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. | | | A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW | | | COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION | | | MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE | | | THE CHANGES CAN BE FOUND WILL HELP EXPEDITE YOUR | | | PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. | | | | | | HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA | | | | | | LUIS A. CRESPO | | | PLUMBING PLAN EXAMINER / INSPECTOR | | | EMAIL: [email protected] OFFICE: 561 805-6720 | | | |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
1 |
Status |
P |
Date |
2020-12-14 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-12-14 |
Time |
12:49 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-12-14 |
Time |
12:49 |
Sent To |
|
|
| Notes |
| 2020-12-14 12:49:34 | SEE 18100526 | | | |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2020-12-14 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-12-14 |
Time |
12:49 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-12-14 |
Time |
12:49 |
Sent To |
|
|
| Notes |
| 2020-12-14 12:50:24 | PLANS WITH 18100526 | | | **PROVISO** PRODUCT APPROVALS DEFERRED; SUBMIT WITH | | | ROOF SUB PERMIT APPLICATION | | | | | | | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
6 |
Status |
P |
Date |
2023-03-30 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-03-30 |
Time |
11:32 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-03-30 |
Time |
11:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
5 |
Status |
P |
Date |
2023-02-15 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2023-02-15 |
Time |
15:26 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
F |
Date |
2022-12-22 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-12-22 |
Time |
12:55 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-12-22 |
Time |
12:55 |
Sent To |
|
|
| Notes |
| 2022-12-22 13:25:07 | I COULD NOT VERIFY THE ENGINEER'S DIGITAL SIGNATURE ON | | | THE BOILER DRAWINGS SHEET P6.04. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2022-08-22 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2022-08-22 |
Time |
07:54 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2022-08-22 |
Time |
07:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2022-07-13 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-07-13 |
Time |
14:58 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-07-13 |
Time |
14:58 |
Sent To |
|
|
| Notes |
| 2022-07-13 15:01:18 | SEE 18100526 | | | PLANS WITH 18100526 | | | DIGITAL SIGNATURES ON PLANS SUBMITTED WITH 20120587 ARE | | | OKAY. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
N |
Date |
2020-12-14 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-12-14 |
Time |
12:50 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-12-14 |
Time |
12:50 |
Sent To |
|
|
| Notes |
| 2020-12-14 12:50:49 | SEE 18100526 | | | PLANS WITH 18100526 | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
P |
Date |
2022-10-04 |
|
|
Cont ID |
|
| Sent By |
jroach |
Date |
2022-10-04 |
Time |
14:43 |
Rev Time |
0.00 |
| Received By |
jroach |
Date |
2022-10-04 |
Time |
14:43 |
Sent To |
|
|
| Notes |
| 2022-10-04 14:46:13 | ZONING PLAN REVIEW | | | ________________________________________ | | | | | | DATE OF REVIEW: 10.04.2022 | | | PERMIT NO.: 20120587 | | | ________________________________________ | | | | | | REVIEW STATUS: PASSED WITH PROVISOS | | | ________________________________________ | | | | | | THIS REVIEW HAS BEEN PASSED SUBJECT TO THE FOLLOWING | | | PROVISOS: | | | | | | 1. THIS PERMIT REVIEW IS LIMITED TO THE BEACH CLUB | | | ONLY. | | | | | | 2. ALL DEVELOPMENT WITHIN THE MARINA COMMERCIAL MARINE | | | PLANNED DEVELOPMENT (CMPD) SHALL BE SUBJECT TO ALL | | | DEVELOPMENT ORDER CONDITIONS, DESIGN GUIDELINES, ETC., | | | AS OUTLINED IN RESOLUTION NO. 66-22, AND AS MAY BE | | | AMENDED. ALL CONDITIONS OF APPROVAL IMPOSED BY THE | | | DEVELOPMENT ORDER SHALL BE ADDRESSED WITHIN THE | | | APPROPRIATE SPECIFIED TIMEFRAMES. | | | ________________________________________ | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | ________________________________________ | | | | | | QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING: | | | | | | JOHN P. ROACH, AICP, PRINCIPAL PLANNER | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES DEPARTMENT ??? PLANNING DIVISION | | | 401 CLEMATIS STREET - P.O. BOX 3147 | | | WEST PALM BEACH, FLORIDA 33402 | | | | | | P: 561.822.1448 | | | TTY: 800.955.8771 | | | E: [email protected] | | | | | | W: WPB.ORG | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
F |
Date |
2022-06-13 |
|
|
Cont ID |
|
| Sent By |
jroach |
Date |
2022-06-13 |
Time |
11:05 |
Rev Time |
0.00 |
| Received By |
jroach |
Date |
2022-06-13 |
Time |
10:57 |
Sent To |
|
|
| Notes |
| 2022-06-13 11:05:59 | ZONING PLAN REVIEW | | | ________________________________________ | | | | | | DATE OF REVIEW: 06.13.2023 | | | PERMIT NO.: 20120587 | | | ________________________________________ | | | | | | REVIEW STATUS: FAILED | | | ________________________________________ | | | | | | PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN | | | REVIEW COMMENTS: | | | | | | 1. THE SITE PLAN SUBMITTED DOES NOT MATCH THE LATEST | | | SITE PLAN SUBMITTED AS PART OF THE COMMERCIAL MARINE | | | PLANNED DEVELOPMENT (CMPD). ALL PLANS SHALL MATCH THAT | | | WHICH WAS SUBMITTED/APPROVED AS PART OF THE CMPD. | | | ________________________________________ | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | ________________________________________ | | | | | | QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING: | | | | | | JOHN P. ROACH, AICP, PRINCIPAL PLANNER | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION | | | 401 CLEMATIS STREET - P.O. BOX 3147 | | | WEST PALM BEACH, FLORIDA 33402 | | | | | | P: 561.822.1448 | | | TTY: 800.955.8771 | | | E: [email protected] | | | | | | W: WPB.ORG | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2022-04-08 |
|
|
Cont ID |
|
| Sent By |
jroach |
Date |
2022-04-08 |
Time |
12:39 |
Rev Time |
0.00 |
| Received By |
jroach |
Date |
2022-04-08 |
Time |
12:39 |
Sent To |
|
|
| Notes |
| 2022-04-08 12:40:33 | CHANGES ARE BEING SUBMITTED, ZONING REVIEW WILL BE | | | COMPLETED WITH THE RESUBMITTAL. | | | | | | QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING: | | | | | | JOHN P. ROACH, AICP, PRINCIPAL PLANNER | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION | | | 401 CLEMATIS STREET - P.O. BOX 3147 | | | WEST PALM BEACH, FLORIDA 33402 | | | | | | P: 561.822.1448 | | | TTY: 800.955.8771 | | | E: [email protected] | | | | | | W: WPB.ORG | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2021-08-26 |
|
|
Cont ID |
|
| Sent By |
jroach |
Date |
2021-08-26 |
Time |
14:45 |
Rev Time |
0.00 |
| Received By |
jroach |
Date |
2021-08-26 |
Time |
14:45 |
Sent To |
|
|
| Notes |
| 2021-08-26 14:45:47 | ZONING PLAN REVIEW | | | ________________________________________ | | | | | | DATE OF REVIEW: 08.23.2021 | | | PERMIT NO.: 20120587 | | | ________________________________________ | | | | | | REVIEW STATUS: FAILED | | | ________________________________________ | | | | | | PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN | | | REVIEW COMMENTS: | | | | | | 1. THE SITE PLAN SUBMITTED DOES NOT MATCH THE LATEST | | | SITE PLAN SUBMITTED AS PART OF THE COMMERCIAL MARINE | | | PLANNED DEVELOPMENT (CMPD). ALL PLANS SHALL MATCH THAT | | | WHICH WAS SUBMITTED/APPROVED AS PART OF THE CMPD. | | | | | | 2. ACCORDING TO THE LATEST SITE PLAN SUBMITTED AS PART | | | OF THE CMPD, THE SIZE OF THE BEACH CLUB (OVERHANG) HAS | | | INCREASED. PURSUANT TO THE DESIGN GUIDELINES, THE BEACH | | | CLUB IS TO BE A MINIMUM OF 20 FEET FROM THE SEAWALL. AS | | | THE OVERHANG HAS SUPPORT POSTS, THE MINIMUM 20 FOOT | | | SETBACK (AS DEFINED BY THE ZLDRS) IS TO BE FROM THE | | | SUPPORT COLUMN TO THE SEAWALL. EITHER THE PLAN SHALL BE | | | REVISED TO MEET THE MINIMUM SETBACK REQUIREMENT, OR A | | | MAJOR AMENDMENT TO THE CMPD SHALL BE APPROVED TO MODIFY | | | THE SETBACK REQUIREMENTS. | | | ________________________________________ | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | ________________________________________ | | | | | | QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING: | | | | | | JOHN P. ROACH, AICP, PRINCIPAL PLANNER | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION | | | 401 CLEMATIS STREET - P.O. BOX 3147 | | | WEST PALM BEACH, FLORIDA 33402 | | | | | | P: 561.822.1448 | | | TTY: 800.955.8771 | | | E: [email protected] | | | | | | W: WPB.ORG | | | |
|
|