| Plan Review Stops For Permit 20120266 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
P |
Date |
2021-01-04 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2021-01-04 |
Time |
15:21 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2021-01-04 |
Time |
15:21 |
Sent To |
|
|
| Notes |
| 2021-01-04 15:22:41 | MAIN PROPERTY ADDRESS TO REMAIN, GARAGE & POOL HOUSE | | | ACCESSORY UNITS NO ADDRESS TO BE GIVEN (UNLESS POOL | | | HOUSE IS TO BE CONVERTED INTO LIVABLE SPACE. IF THIS IS | | | THE CASE PLEASE REACH OUT TO [email protected] |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2021-04-01 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-04-01 |
Time |
12:08 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-04-01 |
Time |
12:04 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2021-01-29 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-01-29 |
Time |
12:12 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-01-29 |
Time |
11:26 |
Sent To |
|
|
| Notes |
| 2021-01-29 12:12:12 | SFR REMODEL | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) PRODUCT APPROVAL FOR THE HORIZONTAL ROLLING WINDOW | | | (17-0411.05) REQUIRES SHUTTERS- PLEASE PROVIDE THE | | | SHUTTER PRODUCT APPROVAL. | | | 2) PLEASE PROVIDE A COPY OF THE DOOR PRODUCT APPROVAL | | | LISTED ON THE DOOR SCHEDULE (20-0427.05) | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2020-12-23 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-12-23 |
Time |
09:47 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-12-23 |
Time |
07:33 |
Sent To |
|
|
| Notes |
| 2020-12-23 09:31:54 | SFR REMODEL AND GUEST HOUSE ADDITION | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) PLEASE SHOW THE CEILING HEIGHT AT THE BEDROOMS WITH | | | THE POURED UP FLOORS. FBC R305 | | | 2) PLEASE SHOW ROOF SLOPE IF ANY AT ADDED FRONT PORCH | | | ROOF. FBC R903.4 | | | 3) DRAWING S4 HAS A STRAPPING SCHEDULE BUT THE ROOF | | | FRAMING PLAN DOES NOT SHOW THE LOCATION OF THE JOIST | | | STRAPPING. | | | 4) DRAWING S4 HAS DETAIL CUTS WITH THE WRONG DRAWING | | | LOCATION SHOWN. | | | 5) PLEASE SHOW THE REQUIRED TERMITE PROTECTION FOR THE | | | ADDITIONS - FBC R318.1 | | | 6) PLEASE PROVIDE COMPLETE MIAMI DADE OR FLORIDA STATE | | | PRODUCT APPROVALS FOR THE ROOFING SYSTEMS, EXTERIOR | | | WINDOWS, EXTERIOR DOORS - (AS LISTED ON THE DRAWINGS). | | | 7) ROOFING SYSTEMS, WINDOW AND DOOR PRODUCT APPROVALS | | | MAY BE DEFERRED SUBMITTALS BY LISTING ITEMS TO BE | | | DEFERRED ON THE CONSTRUCTION DOCUMENTS - 107.3.4.1 | | | DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, | | | DEFERRED SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF | | | THE DESIGN THAT ARE NOT SUBMITTED AT THE TIME OF THE | | | APPLICATION AND THAT ARE TO BE SUBMITTED TO THE | | | BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL | | | OF ANY | | | SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE | | | BUILDING OFFICIAL. THE REGISTERED DESIGN PROFESSIONAL | | | IN RESPONSIBLE CHARGE SHALL LIST THE DEFERRED | | | SUBMITTALS ON THE CONSTRUCTION | | | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. | | | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE | | | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN | | | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD | | | THEM TO THE BUILDING OFFICIAL WITH A NOTATION | | | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE | | | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO | | | THE DESIGN OF THE BUILDING. THE DEFERRED | | | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE | | | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE | | | BUILDING OFFICIAL. | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2021-03-30 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2021-03-30 |
Time |
08:07 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2021-03-30 |
Time |
06:55 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2020-12-18 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2020-12-18 |
Time |
13:04 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2020-12-18 |
Time |
10:07 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E-LOWVOLT |
ELECTRICAL LOW VOLTAGE |
| Rev No |
2 |
Status |
P |
Date |
2021-03-30 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2021-03-30 |
Time |
08:07 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2021-03-30 |
Time |
06:55 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E-LOWVOLT |
ELECTRICAL LOW VOLTAGE |
| Rev No |
1 |
Status |
P |
Date |
2020-12-18 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2020-12-18 |
Time |
13:05 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2020-12-18 |
Time |
13:05 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
3 |
Status |
P |
Date |
2021-03-29 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-03-29 |
Time |
12:38 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-03-29 |
Time |
12:38 |
Sent To |
|
|
| Notes |
| 2021-03-29 12:38:57 | 03/29/21 REVIEWED FOR CODE COMPLIANCE (GAS) | | | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | | PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES | | | FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, | | | STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT | | | THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK | | | OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | | AVOID VOIDING OF THE PERMIT. | | | | | | LUIS A. CRESPO | | | PLUMBING PLAN EXAMINER / INSPECTOR | | | EMAIL: [email protected] OFFICE: 561 805-6720 | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
F |
Date |
2021-01-25 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-01-25 |
Time |
17:32 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-01-25 |
Time |
17:32 |
Sent To |
|
|
| Notes |
| 2021-01-25 17:34:00 | 01/25/21 GAS 2ND REVIEW**DENIED** WITH COMMENTS | | | | | | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS | | | TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE | | | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. | | | | | | 1. A PERMIT IS REQUIRED FOR GAS BY A LICENSED | | | CONTRACTOR PER THE 2017 FBC-PLUMBING SEC.608.1. THIS IS | | | NOTED THAT THIS IS NOT THE RESPONSIBILITY OF THE | | | ENGINEER AS THESE COMMENTS ARE REQUESTING DOCUMENTATION | | | THAT NEED TO BE VERIFIED FOR COMPLIANCE SO CONTRACTOR | | | SHALL SUPPLY THEM. | | | | | | 2. SECOND REQUEST, PLEASE SUBMIT THE MANUFACTURER'S | | | SPECIFICATION SHEETS/INSTALLATION MANUAL FOR ALL THE | | | GAS APPLIANCES (POOL HEATER, DRYER, AND COOKTOP) PER | | | THE WPB AMENDMENTS TO FBC SEC. 107.2.1. THIS IS NOTED | | | THAT THIS IS NOT THE RESPONSIBILITY OF THE ENGINEER AS | | | THESE COMMENTS ARE REQUESTING DOCUMENTATION THAT NEED | | | TO BE VERIFIED FOR COMPLIANCE SO CONTRACTOR SHALL | | | SUPPLY THEM. | | | | | | 3. SECOND REQUEST, PLEASE SUBMIT MANUFACTURER?S | | | SPECIFICATIONS FOR THE PRESSURE REGULATORS. REGULATORS | | | INSTALLED ON THE BUILDING'S EXTERIOR SHALL BE APPROVED | | | FOR OUTDOOR INSTALLATION PER THE 2017 FBC RES. SEC. | | | G2421.1. THIS IS NOTED THAT THIS IS NOT THE | | | RESPONSIBILITY OF THE ENGINEER AS THESE COMMENTS ARE | | | REQUESTING DOCUMENTATION THAT NEED TO BE VERIFIED FOR | | | COMPLIANCE SO CONTRACTOR SHALL SUPPLY THEM. | | | | | | 4. SECOND REQUEST PLEASE SHOW ALL UNIONS IN FRONT OF | | | REGULATOR 1' OF EITHER SIDE PER THE 2017 FBC RES. SEC | | | G2421.2 (7), WHERE CONNECTED TO RIGID PIPING, A UNION | | | SHALL BE INSTALLED WITHIN 1 FOOT (304 MM) OF EITHER | | | SIDE OF THE MP REGULATOR. | | | | | | WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & | | | REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. | | | A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW | | | COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION | | | MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE | | | THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR | | | PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. | | | | | | HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA | | | | | | LUIS A. CRESPO | | | PLUMBING PLAN EXAMINER / INSPECTOR | | | EMAIL: [email protected] OFFICE: 561 805-6720 | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2020-12-18 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2020-12-18 |
Time |
16:48 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2020-12-18 |
Time |
13:47 |
Sent To |
|
|
| Notes |
| 2020-12-18 16:49:49 | 12/18/20 GAS 1ST REVIEW**DENIED** WITH COMMENTS | | | | | | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS | | | TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE | | | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. | | | | | | 1. A PERMIT IS REQUIRED FOR GAS BY A LICENSED | | | CONTRACTOR PER THE 2017 FBC-PLUMBING SEC.608.1. | | | | | | 2. PLEASE SUBMIT THE MANUFACTURER'S SPECIFICATION | | | SHEETS/INSTALLATION MANUAL FOR ALL THE GAS APPLIANCES | | | (POOL HEATER, DRYER, AND COOKTOP) PER THE WPB | | | AMENDMENTS TO FBC SEC. 107.2.1. | | | | | | 3. THE GAS HEATER IS NOT SHOWN ON THE GAS ISOMETRIC, | | | BUT THERE IS A DIFFERENCE OF 180 BTU ON THE GAS | | | CALCULATION. PLEASE ESTABLISH BTU'S SCHEDULE AND | | | INCLUDE ALL GAS APPLIANCES PER THE 2017 FBC RES. SEC. | | | G2413. | | | | | | 4. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2017 | | | FBC FG SEC. 304.1, 614.5 (CLOTHES DRYERS), OR 2017 FBC | | | RES. SEC. G2407.1 AND G2439.4 (CLOTHES DRYERS). | | | | | | 5. INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM | | | ON THE ISOMETRIC PLAN PER THE 2017 FBC RES. SEC. | | | G2413.2. | | | | | | 6. SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE | | | PRESSURE REGULATORS. REGULATORS INSTALLED ON THE | | | BUILDING'S EXTERIOR SHALL BE APPROVED FOR OUTDOOR | | | INSTALLATION PER THE 2017 FBC RES. SEC. G2421.1. | | | | | | 7. PLEASE SHOW ALL UNIONS IN FRONT OF REGULATOR 1' OF | | | EITHER SIDE PER THE 2017 FBC RES. SEC G2421.2. | | | | | | 8. PLEASE LABEL THE SHUTOFF VALVE ON GAS ISOMERIC PER | | | THE 2017 FBC RES. SEC. G2401.1.3. | | | | | | 9. THE GAS DRYER'S VALVE IS BEHIND THE STACKABLE UNITS, | | | AND THEY SHALL BE READILY ACCESSIBLE WITHOUT MOVING THE | | | UNITS PER THE 2017 FBC FG SEC. DEFINITIONS ACCESS. | | | | | | 10. SIGNED AND SEALED DRAWINGS NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW - OR - | | | IF YOUR ENGINEER DOES NOT HAVE AN ELECTRONIC OR DIGITAL | | | SIGNATURE - PLEASE DROP OFF (CITY HALL DROPBOX) THE | | | ORIGINAL SIGNED AND SEALED DOCUMENT ALONG WITH A "PLAN | | | REVIEW REQUEST FORM" EXPLAINING THE REASON FOR | | | SUBMITTING THE DOCUMENT OR DRAWINGS. THE PLAN REVIEW | | | REQUEST FORM CAN BE OBTAINED BY EMAILING [email protected] AND | | | ASKING FOR THE FORM. | | | | | | WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & | | | REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. | | | A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW | | | COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION | | | MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE | | | THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR | | | PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. | | | | | | LUIS A. CRESPO | | | PLUMBING PLAN EXAMINER / INSPECTOR | | | EMAIL: [email protected] OFFICE: 561 805-6720 | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2021-04-01 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-04-01 |
Time |
12:23 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-03-25 |
Time |
08:14 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2021-01-29 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-01-29 |
Time |
12:12 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-01-22 |
Time |
13:57 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2021-01-06 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2021-01-06 |
Time |
15:05 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2020-12-17 |
Time |
13:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
P |
Date |
2021-03-31 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-03-31 |
Time |
06:49 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-03-31 |
Time |
06:41 |
Sent To |
|
|
| Notes |
| 2021-03-31 06:50:26 | APPROVED FOR MAIN HOUSE ONLY. CABANA MUST HAVE A | | | MECHANICAL PERMIT BEFORE WORK BEGINS. CABANA PERMIT | | | MUST REFERENCE THIS PERMIT NUMBER. ME |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2021-01-25 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-01-25 |
Time |
08:54 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-01-25 |
Time |
08:54 |
Sent To |
|
|
| Notes |
| 2021-01-25 09:32:33 | CABANA MUST HAVE ITS OWN PERMITS. THE PERMIT SHOULD | | | INCLUDE THIS PERMIT NUMBER TO REFERENCE BACK TO THESE | | | DRAWINGS. ME |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2021-01-25 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2020-12-18 |
Time |
12:31 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2020-12-18 |
Time |
12:31 |
Sent To |
|
|
| Notes |
| 2020-12-18 12:31:44 | 1ST REVIEW FBC-2017 MECHANICAL | | | PERMIT-20120266 | | | | | | CODES IN EFFECT: | | | | | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | | 2017 | | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION | | | 2017 | | | FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH | | | EDITION 2017 | | | FS- FLORIDA STATUTES | | | FAC- FLORIDA ADMINISTRATIVE CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | | EDITION 2017 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) PLEASE PROVIDE MECHANICAL EQUIPMENT SIZING | | | CALCULATIONS FOR EACH MECHANICAL SYSTEM. FBC RES | | | R403.7.1 | | | | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD | | | SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER | | | SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN | | | THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS | | | PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS | | | PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR | | | UPDATED. | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2021-03-29 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-03-29 |
Time |
12:39 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-03-29 |
Time |
12:39 |
Sent To |
|
|
| Notes |
| 2021-03-29 12:39:38 | 03/29/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING) | | | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | | PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES | | | FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, | | | STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT | | | THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK | | | OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | | AVOID VOIDING OF THE PERMIT. | | | | | | LUIS A. CRESPO | | | PLUMBING PLAN EXAMINER / INSPECTOR | | | EMAIL: [email protected] OFFICE: 561 805-6720 | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2021-01-25 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-01-25 |
Time |
17:34 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-01-25 |
Time |
16:11 |
Sent To |
|
|
| Notes |
| 2021-01-25 17:35:10 | 01/25/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING) | | | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | | PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES | | | FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, | | | STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT | | | THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK | | | OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | | AVOID VOIDING OF THE PERMIT. | | | | | | LUIS A. CRESPO | | | PLUMBING PLAN EXAMINER / INSPECTOR | | | EMAIL: [email protected] OFFICE: 561 805-6720 | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2020-12-18 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2020-12-18 |
Time |
15:07 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2020-12-18 |
Time |
13:23 |
Sent To |
|
|
| Notes |
| 2020-12-18 15:07:48 | 12/18/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS | | | | | | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS | | | TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE | | | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. | | | | | | 1. THESE ARE MULTI-FAMILY DWELLINGS, AND THE WATER | | | USERS WILL BE REQUIRED TO INSTALL A BACKFLOW PREVENTION | | | ASSEMBLY AT THE POINT OF DELIVERY. THE TYPE OF BACKFLOW | | | ASSEMBLY REQUIRED WILL BE DEPENDENT UPON THE DEGREE OF | | | HAZARD POSED BY THE WATER USER. A REDUCED PRESSURE ZONE | | | BACKFLOW DEVICE WILL BE REQUIRED AT THE WATER METER PER | | | THE CITY OF WEST PALM CROSS UTILITIES DEPARTMENT AND | | | THEIR CONNECTION CONTROL PROGRAM. | | | | | | 2. A LICENSED CONTRACTOR MUST REQUIRE SUB PLUMBING AND | | | GAS PERMITS FOR THE SCOPE OF WORK PER THE WPB | | | AMENDMENTS TO THE FBC SEC. 105.1. | | | | | | 3. ON SHEET P-3, IN THE MASTER BATH, THE ISOMETRIC | | | DRAWING SHOWS AN AIR ADMITANVCE VALVE THAT REQUIRES IT | | | TO BE ACCESSIBLE. IT HAS TO BE IN A BOX WITH A COVER IF | | | IT IS LOCATED BEHIND THE FREESTANDING TUB. YOU MAY NOT | | | NEED IT AS THE DISTANCE OF 8' FROM THE LAVS LOOKS | | | RELATIVELY CLOSE. PLEASE CHANGE, OR IF IT IS BEHIND THE | | | TUB, PLEASE NOTE THE PLANS FOR AN ACCESSIBLE LOCATION | | | PER THE 2017 FBC SEC. R 3114.5. | | | | | | 4. ON SHEET P-2, THE WASHING MACHINE SHUT OFF VALVES | | | SHALL BE ACCESSIBLE WITHOUT MOVING THE UNITS AND WITHIN | | | REACH; PLEASE SHOW TO THE SIDE PER THE 2017 FBC SEC. R | | | 2903.9.3. | | | | | | 5. SUBMIT A SLAB REPAIR DETAIL FOR REVIEW. SHOW THE | | | REPAIR'S WIDTH, THE CONCRETE'S MINIMUM THICKNESS TO BE | | | REPLACED, AND THE CONCRETE'S PSI. SHOW THE DOWELS' SIZE | | | AND LENGTH, THE MINIMUM EMBEDMENT DEPTH INTO THE | | | EXISTING SLAB, AND THE DOWELS' SPACING IN THE CENTER. | | | THE REPAIR SHALL ALSO INCLUDE TERMITE TREATMENT OF THE | | | SOIL AND THE REQUIRED VAPOR BARRIER OVER THE SOIL. A | | | COPY OF THE TERMITE CERTIFICATE SHALL BE ONSITE FOR A | | | FINAL INSPECTION. | | | | | | 6. ON SHEET P-4, THE WATER HEATER PAN DRAIN TO THE | | | OUTSIDE NEEDS TO BE RODENT-PROOF WITH SOME MESH AT THE | | | EXTERIOR. PLEASE ADD A NOTE TO THE DETAIL TO PROTECT | | | FROM RODENT INFILTRATION PER THE 2017 FBC SEC. R | | | 2606.1. | | | | | | 7. THERE IS A DETAIL FOR A THERMOSTATIC VALVE ON THAT | | | SAME PAGE. IT IS NOT REQUIRED ONLY IN THE FREESTANDING | | | TUB; ONLY THE VALVE DOES NOT COMPLY WITH ASSE 1016/ASME | | | A112.1016/CSA B125.16 PER THE 2017 FBC SEC. R 2713.3. | | | | | | 8. SIGNED AND SEALED DRAWINGS NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW - OR - | | | IF YOUR ENGINEER DOES NOT HAVE AN ELECTRONIC OR DIGITAL | | | SIGNATURE - PLEASE DROP OFF (CITY HALL DROPBOX) THE | | | ORIGINAL SIGNED AND SEALED DOCUMENT ALONG WITH A "PLAN | | | REVIEW REQUEST FORM" EXPLAINING THE REASON FOR | | | SUBMITTING THE DOCUMENT OR DRAWINGS. THE PLAN REVIEW | | | REQUEST FORM CAN BE OBTAINED BY EMAILING [email protected] AND | | | ASKING FOR THE FORM. | | | | | | WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & | | | REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. | | | A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW | | | COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION | | | MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE | | | THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR | | | PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. | | | | | | HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA | | | | | | LUIS A. CRESPO | | | PLUMBING PLAN EXAMINER / INSPECTOR | | | EMAIL: [email protected] OFFICE: 561 805-6720 | | | |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2021-01-29 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-01-29 |
Time |
11:21 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-01-29 |
Time |
11:21 |
Sent To |
|
|
| Notes |
| 2021-01-29 11:22:28 | DEFERRED SUBMITTAL PER PLANS |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2021-04-01 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-04-01 |
Time |
12:23 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-04-01 |
Time |
12:23 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2021-01-29 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-01-29 |
Time |
11:25 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-01-29 |
Time |
11:25 |
Sent To |
|
|
| Notes |
| 2021-01-29 11:26:10 | RE: M/E/P SHEETS REQUIRE DIGITAL SIGNATURE. ARCH. | | | SHEETS AND STRUCTURAL SHEETS OK. | | | | | | | | | 1. DOCUMENTS PREPARED BY AN ARCHITECT OR ENGINEER AND | | | SUBMITTED FOR PUBLIC RECORD ARE TO BE SIGNED, SEALED, | | | DATED ORIGINALS. A SCAN OF A WET SEAL AND SIGNATURE OR | | | DIGITAL SIGNATURE IS NOT CONSIDERED A DIGITAL | | | SIGNATURE. | | | | | | 2. EITHER UPLOAD A VALID DIGITALLY SIGNED DOCUMENT OR | | | DROP OFF (OR MAIL) ONE PAPER ORIGINAL WITH AN ORIGINAL | | | WET SEAL AND SIGNATURE TO: | | | | | | BUILDING DIVISION, FIRST FLOOR | | | CITY OF WEST PALM BEACH | | | 401 CLEMATIS ST | | | WEST PALM BEACH, FL 33401 | | | | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2020-12-18 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2020-12-18 |
Time |
10:18 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2020-12-18 |
Time |
10:07 |
Sent To |
|
|
| Notes |
| 2020-12-18 10:27:23 | PLAN REVIEW / SIGNATURES | | | | | | CHRISTOPHER S. THROOP, C.B.O. | | | PLANS EXAMINER BUILDING - PX3169 | | | PLANS EXAMINER 1&2 FAMILY - SFP306 | | | CONSTRUCTION SERVICES DIVISION | | | TEL: 561-805-6726 | | | FAX: 561-805-6676 | | | E-MAIL: [email protected] | | | | | | CODES IN EFFECT: | | | 2017 FLORIDA BUILDING CODE, 6TH EDITION W/2017 WEST | | | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, | | | CHAPTER 1 ADMINISTRATION | | | | | | 1ST REVIEW | | | | | | RESULTS: DENIED | | | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT | | | | | | RE: M/E/P SHEETS REQUIRE DIGITAL SIGNATURE. ARCH. | | | SHEETS AND STRUCTURAL SHEETS OK. | | | | | | | | | 1. DOCUMENTS PREPARED BY AN ARCHITECT OR ENGINEER AND | | | SUBMITTED FOR PUBLIC RECORD ARE TO BE SIGNED, SEALED, | | | DATED ORIGINALS. A SCAN OF A WET SEAL AND SIGNATURE OR | | | DIGITAL SIGNATURE IS NOT CONSIDERED A DIGITAL | | | SIGNATURE. | | | | | | 2. EITHER UPLOAD A VALID DIGITALLY SIGNED DOCUMENT OR | | | DROP OFF (OR MAIL) ONE PAPER ORIGINAL WITH AN ORIGINAL | | | WET SEAL AND SIGNATURE TO: | | | | | | BUILDING DIVISION, FIRST FLOOR | | | CITY OF WEST PALM BEACH | | | 401 CLEMATIS ST | | | WEST PALM BEACH, FL 33401 | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2021-01-05 |
|
|
Cont ID |
|
| Sent By |
rthermid |
Date |
2021-01-05 |
Time |
|
Rev Time |
|
| Received By |
rthermid |
Date |
2021-01-05 |
Time |
|
Sent To |
I |
|
| Notes |
|
|