Plan Review Details - Permit 20120238
Plan Review Stops For Permit 20120238
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2021-11-22 Cont ID  
Sent By rmcphers Date 2021-11-22 Time 11:56 Rev Time 0.00
Received By rmcphers Date 2021-11-22 Time 11:56 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2021-06-21 Cont ID  
Sent By rmcphers Date 2021-06-21 Time 10:46 Rev Time 0.00
Received By rmcphers Date 2021-06-21 Time 10:46 Sent To  
Notes
2021-06-21 10:56:37REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 3RD REVIEW
  
 CORRECTIONS NEEDED -
 1) PLEASE SHOW ALL DIMENSIONS IN THE ADDED MASTER BATH
 AND THE DIMENSIONS OF THE MASTER BEDROOM. FBC R304
 2) PLEASE REVISE THE BUILDING PERMIT APPLICATION TO
 SHOW THE CORRECT JOB DESCRIPTION. FBC WPB 105.1

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2021-01-14 Cont ID  
Sent By rmcphers Date 2021-01-14 Time 09:57 Rev Time 0.00
Received By rmcphers Date 2021-01-14 Time 09:57 Sent To  
Notes
2021-01-14 09:58:20REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 2ND REVIEW
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) PLEASE PROVIDE A COMPLETE FLOOR PLAN OF THE HOUSE
 SHOW ALL ROOMS AND THE NEW KITCHEN AND BATHROOM
 LOCATION.
 2) PLEASE PROVIDE A FLOOR PLAN SHOWING THE LOCATION OF
 THE EXISTING KITCHEN AND BATH ROOM LOCATION.
 3) PLEASE DESCRIBE IN WRITING ON THE FLOOR PLAN WHAT
 YOU ARE DOING - IS THIS KITCHEN AND BATH FOR THE MAIN
 HOUSE OR A DETACHED BUILDING? IF A DETACHED BUILDING -
 WHAT WAS THE BUILDING USED FOR?

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-12-11 Cont ID  
Sent By rmcphers Date 2020-12-11 Time 07:54 Rev Time 0.00
Received By rmcphers Date 2020-12-11 Time 07:47 Sent To  
Notes
2020-12-11 07:49:55 
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) PLEASE PROVIDE A COMPLETE FLOOR PLAN OF THE HOUSE
 SHOW ALL ROOMS AND THE NEW KITCHEN AND BATHROOM
 LOCATION.
 2) PLEASE PROVIDE A FLOOR PLAN SHOWING THE LOCATION OF
 THE EXISTING KITCHEN AND BATH ROOM LOCATION.
 3) PLEASE DESCRIBE IN WRITING ON THE FLOOR PLAN WHAT
 YOU ARE DOING - IS THIS KITCHEN AND BATH FOR THE MAIN
 HOUSE OR A DETACHED BUILDING? IF A DETACHED BUILDING -
 WHAT WAS THE BUILDING USED FOR?

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2021-12-16 Cont ID  
Sent By mpeterso Date 2021-12-16 Time 15:49 Rev Time 0.00
Received By mpeterso Date 2021-12-16 Time 15:49 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2021-06-08 Cont ID  
Sent By jleahy Date 2021-06-08 Time 16:33 Rev Time 0.00
Received By jleahy Date 2021-06-08 Time 16:14 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2021-01-14 Cont ID  
Sent By JLEAHY Date 2021-01-14 Time 11:51 Rev Time 0.00
Received By jleahy Date 2021-01-14 Time 11:49 Sent To  
Notes
2021-01-14 11:54:19SEE PERMIT 20120240 FOR LAYOUT JLEAHY
2021-01-13 14:50:45SEE ELECTRICAL PERMIT 20120240. JG.

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2021-12-16 Cont ID  
Sent By mpeterso Date 2021-12-16 Time 15:49 Rev Time 0.00
Received By mpeterso Date 2021-12-16 Time 15:49 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2021-06-21 Cont ID  
Sent By rmcphers Date 2021-06-21 Time 11:07 Rev Time 0.00
Received By rmcphers Date 2021-06-02 Time 08:36 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-01-20 Cont ID  
Sent By cpuell Date 2021-01-20 Time 16:51 Rev Time 0.00
Received By cpuell Date 2021-01-10 Time 08:37 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-12-11 Cont ID  
Sent By rmcphers Date 2020-12-11 Time 07:54 Rev Time 0.00
Received By rmcphers Date 2020-12-04 Time 12:38 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status N Date 2021-12-17 Cont ID  
Sent By dbattles Date 2021-12-17 Time 09:02 Rev Time 0.00
Received By dbattles Date 2021-12-17 Time 09:02 Sent To  
Notes
2021-12-17 09:03:00NO INCREASE IN SQ. FOOTAGE AND NO ADDED LIVING SPACES
 OR BEDROOMS.

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2021-01-14 Cont ID  
Sent By rmcphers Date 2021-01-14 Time 09:59 Rev Time 0.00
Received By rmcphers Date 2021-01-14 Time 09:59 Sent To  
Notes
2021-01-14 09:59:50PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM
 CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS
 TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF
  
 UPON APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE
 RECEIPT TO YOUR PROJECT OR EMAIL IT TO
 [email protected] .
  

Review Stop M MECHANICAL (A/C)
Rev No 4 Status N Date 2021-11-29 Cont ID  
Sent By medwards Date 2021-11-17 Time 10:42 Rev Time 0.00
Received By medwards Date 2021-11-17 Time 10:42 Sent To  
Notes
2021-11-29 13:07:44NO MECHANICAL WORK BEING COMPLETED UNDER THIS PROJECT.
 ME
2021-11-17 10:42:29 
  

Review Stop M MECHANICAL (A/C)
Rev No 3 Status F Date 2021-06-10 Cont ID  
Sent By medwards Date 2021-06-10 Time 17:01 Rev Time 0.00
Received By medwards Date 2021-06-10 Time 17:01 Sent To  
Notes
2021-06-10 17:09:581) PLEASE PROVIDE A MECHANICAL DRAWING SHOWING ANY DUCT
 WORK BEING REWORKED OR ADDED. FBC 107.2.1
 2) PLEASE SHOW HOW THE NEW BATHROOM WILL BE VENTILATED.
 FBC RES TABLE M1507.4
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2021-01-12 Cont ID  
Sent By medwards Date 2021-01-12 Time 08:09 Rev Time 0.00
Received By medwards Date 2021-01-12 Time 08:01 Sent To  
Notes
2021-01-12 08:09:252ND REVIEW FBC-2020 MECHANICAL
 PERMIT-20120238
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2020
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2020
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2020
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2020
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION
 2020
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH
 EDITION 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2020
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) WE HAVE A RECORD ON FILE THAT THIS IS A STORAGE
 SHED. PLEASE APPLY FOR A CHANGE OF USE.
  
 2) PLEASE PROVIDE ENERGY CALCULATIONS. FBC EC
 101.5.1.1.2
  
 3) PLEASE PROVIDE MECHANICAL EQUIPMENT CALCULATIONS.
 FBC EC R403.7.1
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD
 SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER
 SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN
 THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS
 PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS
 PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR
 UPDATED.
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2020-12-09 Cont ID  
Sent By medwards Date 2020-12-09 Time 07:55 Rev Time 0.00
Received By medwards Date 2020-12-09 Time 07:54 Sent To  
Notes
2020-12-09 07:55:50PLEASE SEE PLUMBING REVIEWER NOTES.
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop P PLUMBING
Rev No 4 Status P Date 2021-11-17 Cont ID  
Sent By lcrespo Date 2021-11-17 Time 16:39 Rev Time 0.00
Received By lcrespo Date 2021-11-17 Time 16:39 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status F Date 2021-06-21 Cont ID  
Sent By lcrespo Date 2021-06-21 Time 10:48 Rev Time 0.00
Received By lcrespo Date 2021-06-21 Time 10:48 Sent To  
Notes
2021-06-03 10:39:4706/03/21 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. THIS IS THE SECOND, SO PLEASE PROVIDE A DETAILED
 NARRATIVE OF THE SCOPE OF WORK THAT IS BEING DONE. THE
 PERMIT SAYS WHAT YOU ARE TRYING TO DO, BUT IF YOU ARE
 MOVING OR ADDING, IS IT IN A NEW STRUCTURE OR ANOTHER
 PART OF THE HOUSE PER THE WPB AMENDMENTS TO THE FBC
 SEC. 101.2.
  
 2. PLEASE PROVIDE DETAILED PLANS AND DOCUMENTS FOR THE
 WORK BEING DONE. ALL INFORMATION, DRAWINGS,
 SPECIFICATIONS, AND ACCOMPANYING DATA SHALL BEAR THE
 NAME AND SIGNATURE OF THE PERSON RESPONSIBLE FOR THE
 DESIGN. (SEE ALSO SECTION 107.3.5) PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
 3. THERE IS NO VALUE LISTED ON THE PLUMBING
 SUB-APPLICATION, AND THE OVERALL VALUE IS LOW. WPB
 AMENDMENTS TO THE FBC 109.3 BUILDING PERMITS
 VALUATIONS. IF, IN THE OPINION OF THE BUILDING
 OFFICIAL, THE CLAIMED VALUATION OF THE BUILDING,
 ALTERATION, STRUCTURE, ELECTRICAL, GAS, MECHANICAL, OR
 PLUMBING SYSTEMS APPEARS TO BE UNDERESTIMATED ON THE
 APPLICATION, THE PERMIT SHALL BE DENIED UNLESS THE
 APPLICANT CAN SHOW DETAILED, QUANTITY ESTIMATES, AND/OR
 BONA FIDE SIGNED CONTRACTS (EXCLUDING LAND VALUE) TO
 MEET THE APPROVAL OF THE BUILDING OFFICIAL. FOR
 PERMITTING PURPOSES, THE VALUATION OF BUILDINGS AND
 SYSTEMS SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE
 STRUCTURAL, ELECTRIC, PLUMBING, MECHANICAL, INTERIOR
 FINISH, RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN
 FEES, MARKETING COSTS, OVERHEAD, AND PROFIT, EXCLUDING
 ONLY LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE
 LATEST PUBLISHED DATA OF NATIONAL CONSTRUCTION COST
 ANALYSIS SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS
 PUBLISHED BY INTERNATIONAL CODE CONGRESS. THE FINAL
 BUILDING PERMIT VALUATION SHALL BE SET BY THE BUILDING
 OFFICIAL.
  
 4. PLEASE PROVIDE THE SIGNATURE OF ALL INFORMATION,
 DRAWINGS, SPECIFICATIONS, AND ACCOMPANYING DATA THAT
 SHALL BEAR THE PRINTED NAME AND SIGNATURE OF THE PERSON
 RESPONSIBLE FOR THE DESIGN PER THE WPB AMENDMENTS TO
 THE FBC SEC.107.2.1 INFORMATION ON CONSTRUCTION
 DOCUMENTS.
  
 5. A MAIN BUILDING PERMIT IS REQUIRED BY A LICENSED
 CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS
 TO THE FBC SEC. 105.1.
  
 6. TWO SEPARATE ISOMETRIC DRAWINGS SUBMITTED FOR THE
 SANITARY, PLEASE COMBINE INTO ONE PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
 7. PLEASE PROVIDE WATER SOURCE ON THE SCOPE OF WORK
 PER THE WPB AMENDMENTS TO THE FBC SEC. 107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 8. PLEASE SHOW THE DIMENSION BETWEEN FIXTURES
 INSTALLATION TO CONFORM TO THE 2017 FBC SEC. R 2705.1
 (5) AND R 2708.1 GENERAL.
  
 WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES.
 A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION,
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND, WILL HELP EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  
  

Review Stop P PLUMBING
Rev No 2 Status F Date 2021-01-13 Cont ID  
Sent By lcrespo Date 2021-01-13 Time 11:31 Rev Time 0.00
Received By lcrespo Date 2021-01-13 Time 11:31 Sent To  
Notes
2021-01-13 11:34:3201/13/21 2ND PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. PLEASE PROVIDE A DETAIL NARRATIVE OF THE SCOPE OF
 WORK THAT IS BEING DO, THE PERMIT SAYS WHAT YOU ARE
 TRYING TO DO BUT IF YOU ARE MOVING OR ADDING, IS IT IN
 A NEW STRUCTURE OR IN ANOTHER PART OF THE HOUSE PER THE
 WPB AMENDMENTS TO THE FBC SEC. 101.2.
  
 4. PLEASE PROVIDE DETAIL PLANS AND DOCUMENT FOR THE
 WORK BEING DONE. ALL INFORMATION, DRAWINGS,
 SPECIFICATIONS AND ACCOMPANYING DATA SHALL BEAR THE
 NAME AND SIGNATURE OF THE PERSON RESPONSIBLE FOR THE
 DESIGN. (SEE ALSO SECTION 107.3.5) PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
 5. PLANS THAT ARE DESIGNED BY A PROFESSIONAL ARE
 REQUIRED TO BE SIGNED AND SEALED WPB AMENDMENTS TO THE
 FBC SEC. 110.8.4.4
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2020-12-08 Cont ID  
Sent By lcrespo Date 2020-12-08 Time 12:43 Rev Time 0.00
Received By lcrespo Date 2020-12-08 Time 12:05 Sent To  
Notes
2020-12-08 12:47:5212/08/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. THE KITCHEN SINK CANNOT DISCHARGE INTO THE WET VET
 OF A BATHROOM GROUP IT MUST BE DOWNSTREAM PER THE 2017
 FBC SECTION R3108.1 HORIZONTAL WET VENT PERMITTED.
  
 2. A BUILDING AND MECHANICAL SUB PERMIT IS REQUIRED FOR
 THE SCOPE OF WORK PER THE WPB AMENDMENTS TO THE FBC
 SEC. 105.1.
  
 3. PLEASE PROVIDE A DETAIL NARRATIVE OF THE SCOPE OF
 WORK THAT IS BEING DO, THE PERMIT SAYS WHAT YOU ARE
 TRYING TO DO BUT IF YOU ARE MOVING OR ADDING, IS IT IN
 A NEW STRUCTURE OR IN ANOTHER PART OF THE HOUSE PER THE
 WPB AMENDMENTS TO THE FBC SEC. 101.2.
  
 4. PLEASE PROVIDE DETAIL PLANS AND DOCUMENT FOR THE
 WORK BEING DONE. ALL INFORMATION, DRAWINGS,
 SPECIFICATIONS AND ACCOMPANYING DATA SHALL BEAR THE
 NAME AND SIGNATURE OF THE PERSON RESPONSIBLE FOR THE
 DESIGN. (SEE ALSO SECTION 107.3.5) PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
 5. PLANS THAT ARE DESIGNED BY A PROFESSIONAL ARE
 REQUIRED TO BE SIGNED AND SEALED WPB AMENDMENTS TO THE
 FBC SEC. 110.8.4.4
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status N Date 2021-01-14 Cont ID  
Sent By medwards Date 2021-01-12 Time 08:09 Rev Time 0.00
Received By rmcphers Date 2021-01-14 Time 10:00 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2020-12-09 Cont ID  
Sent By medwards Date 2020-12-09 Time 07:56 Rev Time 0.00
Received By medwards Date 2020-12-09 Time 07:56 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status P Date 2021-12-13 Cont ID  
Sent By ajones Date 2021-12-13 Time 16:35 Rev Time 0.00
Received By ajones Date 2021-12-13 Time 16:35 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status F Date 2021-06-09 Cont ID  
Sent By rthermid Date 2021-06-09 Time   Rev Time 0.00
Received By rthermid Date 2021-06-09 Time   Sent To I
Notes
2021-06-09 11:36:39ZONING PLAN REVIEW
 ________________________________________
  
 DATE OF REVIEW: 6/9/21
 ________________________________________
  
 REVIEW STATUS: FAILED
 ________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN
 REVIEW COMMENTS:
  
 1. PROVIDE A COMPLETE FLOOR PLAN OF THE HOME SHOWING
 ALL THE BEDROOMS AND BATHROOMS.
 2. ADDRESS PREVIOUS ZONING AND STRUCTURAL COMMENTS.
 ________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 IF YOU SUBMITTED A PAPER APPLICATION, AND YOU WOULD
 LIKE TO RESUBMIT ELECTRONICALY, EMAIL
 [email protected] AND REQUEST TO HAVE YOUR
 PROJECT CONVERTED TO PROJECTDOX. YOU WILL RECEIVE LOGIN
 INFORMATION AND A LINK TO UPLOAD YOUR RESUBMITTAL.
 PLEASE BE SURE TO ?COMPLETE THE UPLOAD TASK? WHEN YOU
 ARE FINISHED UPLOADING.
  
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 RAFAELA THERMIDOR, ASSOCIATE PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 TTY: 800.955.8771
 E: [email protected]
 W: WPB.ORG
  

Review Stop Z ZONING
Rev No 1 Status F Date 2021-01-20 Cont ID  
Sent By rthermid Date 2021-01-20 Time   Rev Time 0.00
Received By rthermid Date 2021-01-20 Time   Sent To I
Notes
2021-01-20 09:42:25ZONING PLAN REVIEW
 ________________________________________
  
 DATE OF REVIEW: 1/20/21
 ________________________________________
  
 REVIEW STATUS: FAILED
 ________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN
 REVIEW COMMENTS:
  
 1. PLEASE ADDRESS THE BUILDING/STRUCTURAL COMMENTS
 2. PROVIDE A SURVEY OF THE PROPERTY SHOWING THE
 LOCATION OF THE PROPOSED WORK
 3. PROVIDE A SITE PLAN DETAILING THE LOCATION OF THE
 PROPOSED WORK
 ________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 IF YOU SUBMITTED A PAPER APPLICATION, AND YOU WOULD
 LIKE TO RESUBMIT ELECTRONICALY, EMAIL
 [email protected] AND REQUEST TO HAVE YOUR
 PROJECT CONVERTED TO PROJECTDOX. YOU WILL RECEIVE LOGIN
 INFORMATION AND A LINK TO UPLOAD YOUR RESUBMITTAL.
 PLEASE BE SURE TO ?COMPLETE THE UPLOAD TASK? WHEN YOU
 ARE FINISHED UPLOADING.
  
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 RAFAELA THERMIDOR, ASSOCIATE PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 TTY: 800.955.8771
 E: [email protected]
 W: WPB.ORG
  


Account Summary | Usage Policy | Privacy Policy