Plan Review Details - Permit 20110975
Plan Review Stops For Permit 20110975
Review Stop G GAS REVIEW
Rev No 2 Status P Date 2020-12-03 Cont ID  
Sent By lcrespo Date 2020-12-03 Time 08:24 Rev Time 0.00
Received By lcrespo Date 2020-12-03 Time 08:24 Sent To  
Notes
2020-12-03 08:25:0412/03/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2020-11-25 Cont ID  
Sent By medwards Date 2020-11-25 Time 14:04 Rev Time 0.00
Received By medwards Date 2020-11-25 Time 13:55 Sent To  
Notes
2020-11-25 14:04:181ST REVIEW FBC-2017 MECHANICAL
 PERMIT-20110975
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION
 2017
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH
 EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) PLEASE PROVIDE THE PIPE MATERIAL USED. PLEASE SHOW
 THE SYSTEM PRESSURE. PLEASE SHOW IF THIS IS AN OUTDOOR
 OR INDOOR INSTALLATION. FBC 107.3.5.1.5
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD
 SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER
 SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN
 THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS
 PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS
 PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR
 UPDATED.
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-12-03 Cont ID  
Sent By lcrespo Date 2020-12-03 Time 08:24 Rev Time 0.00
Received By lcrespo Date 2020-12-02 Time 14:53 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-11-30 Cont ID  
Sent By lcrespo Date 2020-11-30 Time 07:48 Rev Time 0.00
Received By lcrespo Date 2020-11-20 Time 16:54 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2020-12-03 Cont ID  
Sent By lcrespo Date 2020-12-03 Time 08:24 Rev Time 0.00
Received By lcrespo Date 2020-12-03 Time 08:24 Sent To  
Notes
2020-12-03 08:26:5412/03/20 REVIEWED FOR CODE COMPLIANCE (GAS)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2020-11-30 Cont ID  
Sent By lcrespo Date 2020-11-30 Time 07:47 Rev Time 0.00
Received By lcrespo Date 2020-11-30 Time 07:47 Sent To  
Notes
2020-11-30 07:50:4911/30/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. GAS UNITS REQUIRE CONDENSATE AND THEY NEED TO BE 1'
 AWAY FROM STRUCTURE PER THE 2017 FBC SEC R318.5.
  
 2. PLEASE SUBMIT A HOUSE PLAN SHOWING THE LOCATION OF
 THE TANK-LESS WATER HEATER AND THE LOCATION AND
 DISTANCE OF ANY OPERABLE DOORS OR WINDOWS IN RELATION
 TO THE WATER HEATER. THE LOCATION OF THE WATER HEATER
 SHALL COMPLY WITH THE MANUFACTURER'S INSTALLATION
 INSTRUCTIONS. THE HOUSE PLAN CAN BE HAND-DRAWN PER THE
 WPB AMENDMENTS TO THE FBC SEC. 107.2.1. INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
 3. PIPES NOT IN CONDITION SPACE AND OR OUTSIDE NEED TO
 BE INSULATED WITH A MINIMUM R-3 PER THE 2017 FBC SEC.
 RE 403.5.3.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2020-11-25 Cont ID  
Sent By medwards Date 2020-11-25 Time 14:04 Rev Time 0.00
Received By medwards Date 2020-11-25 Time 14:04 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved