| Plan Review Stops For Permit 20110773 |
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
2 |
Status |
P |
Date |
2021-01-06 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2021-01-06 |
Time |
10:00 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
1 |
Status |
F |
Date |
2020-12-01 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2020-12-01 |
Time |
09:18 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2020-12-01 |
Time |
08:01 |
Sent To |
|
|
| Notes |
| 2020-12-01 09:17:28 | TO THE BUILDING CONTRACTOR: | | | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | | COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE | | | GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS | | | REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE: | | | | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | | RENOVATION.HTML | | | | | | THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO | | | [email protected]. THE INFORMATION SHOULD BE IN PDF | | | FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE INCLUDE | | | THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT LINE. | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2020-12-01 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2020-12-01 |
Time |
10:00 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2020-12-01 |
Time |
08:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2020-12-16 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-12-16 |
Time |
09:30 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-12-16 |
Time |
09:26 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E-LOWVOLT |
ELECTRICAL LOW VOLTAGE |
| Rev No |
1 |
Status |
P |
Date |
2020-12-16 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-12-16 |
Time |
09:31 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-12-16 |
Time |
09:31 |
Sent To |
|
|
| Notes |
| 2020-12-16 09:31:48 | VOICE/DATA ONLY JLEAHY |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2020-11-20 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2020-11-20 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2020-11-20 |
Time |
14:42 |
Sent To |
|
|
| Notes |
| 2020-11-20 14:43:56 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | | INSPECTION. | | | | | | 1) ANY REMOVAL AND/OR CONSTRUCTION OF THE CEILING AREA | | | MAY REQUIRE AN EVALUATION OR MODIFICATION OF THE FIRE | | | SPRINKLER SYSTEM FOR CODE COVERAGE AND COMPLIANCE BY A | | | CERTIFIED FIRE SPRINKLER CONTRACTOR. | | | | | | 2) ANY AND ALL WORK ON THE FIRE SPRINKLER SYSTEMS SHALL | | | BE DONE UNDER SEPARATE SHOP DRAWINGS AND BY A CERTIFIED | | | FIRE SPRINKLER CONTRACTOR. | | | | | | 3) THE FIRE SPRINKLER SHALL REMAIN ACTIVE THROUGHOUT | | | THE CONSTRUCTION PERIOD. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | WEST PALM BEACH FIRE RESCUE | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2021-01-06 |
Time |
10:00 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2020-12-18 |
Time |
08:16 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2020-12-18 |
Time |
|
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2020-11-19 |
Time |
11:57 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2020-12-15 |
|
|
Cont ID |
|
| Sent By |
hmoser |
Date |
2020-12-15 |
Time |
11:24 |
Rev Time |
0.00 |
| Received By |
hmoser |
Date |
2020-12-15 |
Time |
11:07 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
N |
Date |
2020-12-18 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2020-12-18 |
Time |
08:17 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2020-12-18 |
Time |
08:11 |
Sent To |
|
|
| Notes |
| 2020-12-18 08:18:32 | NO PLUMBING PLANS SUBMITTED- NO PLUMBING SHOWN ON OTHER | | | PLANS. | | | CCOLE | | | 12/18/20 |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2020-12-01 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2020-12-01 |
Time |
10:01 |
Rev Time |
|
| Received By |
jwitmer |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|