| 2020-11-23 12:56:57 | 11/23/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE |
| | MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM |
| | ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN |
| | DETERMINING THE MAXIMUM SYSTEM FLOW RATE PER |
| | ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 |
| | EDITION ADDRESSES THE FLOW RATE IN GALLONS PER MINUTE |
| | (GPM). IT REQUIRES THAT THE MAXIMUM SYSTEM FLOW RATE |
| | DOES NOT EXCEED THE LISTED MAXIMUM FLOW RATE OF THE |
| | SUCTION OUTLET FITTING ASSEMBLY (DRAIN COVER). THE TDH |
| | CALCULATIONS MUST INCLUDE ALL THE SYSTEM COMPONENTS |
| | INCLUDING SUCTION AND RETURN PIPING, FITTINGS, VALVES, |
| | HEATER, FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS |
| | EXCEPT THE PUMP. |
| | |
| | 2. PLEASE IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS |
| | SPECIFIC TO THE PUMP BEING INSTALLED ON THIS POOL. THIS |
| | IS NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE |
| | TDH CALCULATIONS PER THE ANSI/APSP/ICC 7 - 2013 SECS. |
| | 4.4.9, 4.4.9.1. |
| | |
| | 3. PLEASE SUBMIT SPECIFICATIONS FOR THE POOL PUMP AND |
| | CARTRIDGE FILTER PER THE WPB AMEND. TO FBC SEC. |
| | 107.2.1. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA |
| | |
| | LUIS A. CRESPO |
| | PLUMBING PLAN EXAMINER / INSPECTOR |
| | EMAIL: [email protected] OFFICE: 561 805-6720 |
| | |