| Plan Review Stops For Permit 20110521 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
P |
Date |
2020-11-16 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2020-11-16 |
Time |
12:49 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2020-11-16 |
Time |
12:48 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
9 |
Status |
P |
Date |
2021-05-27 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-05-27 |
Time |
09:02 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-05-27 |
Time |
09:02 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
8 |
Status |
P |
Date |
2021-04-28 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-04-28 |
Time |
09:46 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-04-28 |
Time |
09:46 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
7 |
Status |
F |
Date |
2021-04-16 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-04-16 |
Time |
14:37 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-04-16 |
Time |
14:37 |
Sent To |
|
|
| Notes |
| 2021-04-16 14:45:47 | NEW SFR | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected]. | | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) ROOFING SYSTEM TO BE USED ON THE PROVIDED PRODUCT | | | APPROVAL PAGE 21 REQUIRES ADDITIONAL SIGNED AND SEALED | | | ATTACHMENT DETAILS FROM AN ARCHITECT OR ENGINEER OR | | | REGISTERED ROOF CONSULTANT FOR ROOF WIND ZONES P2 AND | | | P3 WHICH REQUIRE A HIGHER PRESSURE THAN THE MAXIMUM | | | SHOWN ON THE PRODUCT APPROVAL (-52.5) - SEE GENERAL | | | LIMITATION NOTE NUMBER 7 ON THE PRODUCT APPROVAL. A | | | ROOFING ATTACHMENT OPTION HAS NOT BEEN CIRCLED ON PAGE | | | 21 OF THE LATEST ROOFING PRODUCT APPROVAL PROVIDED. | | | 2) DEMO PERMIT IS (20110526) | | | 3) ROOF PERMIT CAN BE DEFERRED SUBMITTALS IF THEY ARE | | | LISTED TO BE DEFERRED SUBMITTALS ON THE CONSTRUCTION | | | DOCUMENTS SEE- FBC 107.3.4.1 DEFERRED SUBMITTALS. FOR | | | THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS ARE | | | DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT | | | SUBMITTED AT THE TIME OF THE APPLICATION | | | AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL | | | WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY | | | SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE | | | BUILDING OFFICIAL. THE REGISTERED DESIGN | | | PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE | | | DEFERRED SUBMITTALS ON THE CONSTRUCTION | | | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. | | | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE | | | SUBMITTED TO THE REGISTERED DESIGN | | | PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW | | | THEM AND FORWARD THEM TO THE BUILDING | | | OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED | | | SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED | | | AND FOUND TO BE IN GENERAL CONFORMANCE TO THE DESIGN OF | | | THE BUILDING. THE DEFERRED | | | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE | | | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN | | | APPROVED BY THE BUILDING OFFICIAL. | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
6 |
Status |
F |
Date |
2021-03-04 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-03-04 |
Time |
14:33 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-03-04 |
Time |
14:33 |
Sent To |
|
|
| Notes |
| 2021-03-04 14:37:02 | NEW SFR | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected]. | | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) DRAWING S4 HAS BEEN REVISED SHOWING ROOF CLADDING | | | PRESSURE FOR WIND ZONE 3 AT (-96.87) | | | 2) ROOFING SYSTEM TO BE USED ON THE PROVIDED PRODUCT | | | APPROVAL PAGE 21 REQUIRES ADDITIONAL SIGNED AND SEALED | | | ATTACHMENT DETAILS FROM AN ARCHITECT OR ENGINEER OR | | | REGISTERED ROOF CONSULTANT FOR ROOF WIND ZONES P2 AND | | | P3 WHICH REQUIRE A HIGHER PRESSURE THAN THE MAXIMUM | | | SHOWN ON THE PRODUCT APPROVAL (-52.5) - SEE GENERAL | | | LIMITATION NOTE NUMBER 7 ON THE PRODUCT APPROVAL. | | | 3) DEMO PERMIT IS (20110526) | | | 4) ROOF PERMIT CAN BE DEFERRED SUBMITTALS IF THEY ARE | | | LISTED TO BE DEFERRED SUBMITTALS ON THE CONSTRUCTION | | | DOCUMENTS SEE- FBC 107.3.4.1 DEFERRED SUBMITTALS. FOR | | | THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS ARE | | | DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT | | | SUBMITTED AT THE TIME OF THE APPLICATION | | | AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL | | | WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY | | | SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE | | | BUILDING OFFICIAL. THE REGISTERED DESIGN | | | PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE | | | DEFERRED SUBMITTALS ON THE CONSTRUCTION | | | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. | | | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE | | | SUBMITTED TO THE REGISTERED DESIGN | | | PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW | | | THEM AND FORWARD THEM TO THE BUILDING | | | OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED | | | SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED | | | AND FOUND TO BE IN GENERAL CONFORMANCE TO THE DESIGN OF | | | THE BUILDING. THE DEFERRED | | | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE | | | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN | | | APPROVED BY THE BUILDING OFFICIAL. | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
5 |
Status |
F |
Date |
2021-02-12 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-02-12 |
Time |
13:57 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-02-11 |
Time |
14:34 |
Sent To |
|
|
| Notes |
| 2021-02-12 13:57:25 | NEW SFR | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected]. | | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) DRAWING S4 HAS BEEN REVISED - ROOF PRESSURES FOR | | | ROOF CLADDING (ROOFING SYSTEM) ARE INCORRECT - PLEASE | | | SEE FBC R TABLE R301.2(2) (ZONE 3 SHOULD BE (-96.87)) | | | 2) ROOFING SYSTEM TO BE USED ON THE PROVIDED PRODUCT | | | APPROVAL REQUIRES ADDITIONAL SIGNED AND SEALED | | | ATTACHMENT DETAILS FROM AN ARCHITECT OR ENGINEER OR | | | REGISTERED ROOF CONSULTANT FOR ROOF WIND ZONES P2 AND | | | P3 WHICH REQUIRE A HIGHER PRESSURE THAN THE MAXIMUM | | | SHOWN ON THE PRODUCT APPROVAL (-52.5) - SEE GENERAL | | | LIMITATION NOTE NUMBER 7 ON THE PRODUCT APPROVAL. | | | 3) DEMO PERMIT IS (20110526) | | | 4) ROOF PERMIT CAN BE DEFERRED SUBMITTALS IF THEY ARE | | | LISTED TO BE DEFERRED SUBMITTALS ON THE CONSTRUCTION | | | DOCUMENTS SEE- FBC 107.3.4.1 DEFERRED SUBMITTALS. FOR | | | THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS ARE | | | DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT | | | SUBMITTED AT THE TIME OF THE APPLICATION | | | AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL | | | WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY | | | SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE | | | BUILDING OFFICIAL. THE REGISTERED DESIGN | | | PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE | | | DEFERRED SUBMITTALS ON THE CONSTRUCTION | | | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. | | | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE | | | SUBMITTED TO THE REGISTERED DESIGN | | | PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW | | | THEM AND FORWARD THEM TO THE BUILDING | | | OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED | | | SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED | | | AND FOUND TO BE IN GENERAL CONFORMANCE TO THE DESIGN OF | | | THE BUILDING. THE DEFERRED | | | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE | | | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN | | | APPROVED BY THE BUILDING OFFICIAL. | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
F |
Date |
2021-02-01 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-02-01 |
Time |
09:21 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-02-01 |
Time |
09:05 |
Sent To |
|
|
| Notes |
| 2021-02-01 09:20:56 | NEW SFR | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected]. | | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) ROOFING SYSTEM TO BE USED ON THE PROVIDED PRODUCT | | | APPROVAL REQUIRES ADDITIONAL SIGNED AND SEALED | | | ATTACHMENT DETAILS FROM AN ARCHITECT OR ENGINEER OR | | | REGISTERED ROOF CONSULTANT FOR ROOF WIND ZONES P2 AND | | | P3 WHICH REQUIRE A HIGHER PRESSURE THAN THE MAXIMUM | | | SHOWN ON THE PRODUCT APPROVAL (-52.5) - SEE GENERAL | | | LIMITATION NOTE NUMBER 7 ON THE PRODUCT APPROVAL. | | | 2) DEMO PERMIT IS (20110526) | | | 3) ROOF PERMIT CAN BE DEFERRED SUBMITTALS IF THEY ARE | | | LISTED TO BE DEFERRED SUBMITTALS ON THE CONSTRUCTION | | | DOCUMENTS SEE- FBC 107.3.4.1 DEFERRED SUBMITTALS. FOR | | | THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS ARE | | | DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT | | | SUBMITTED AT THE TIME OF THE APPLICATION | | | AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL | | | WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY | | | SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE | | | BUILDING OFFICIAL. THE REGISTERED DESIGN | | | PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE | | | DEFERRED SUBMITTALS ON THE CONSTRUCTION | | | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. | | | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE | | | SUBMITTED TO THE REGISTERED DESIGN | | | PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW | | | THEM AND FORWARD THEM TO THE BUILDING | | | OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED | | | SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED | | | AND FOUND TO BE IN GENERAL CONFORMANCE TO THE DESIGN OF | | | THE BUILDING. THE DEFERRED | | | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE | | | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN | | | APPROVED BY THE BUILDING OFFICIAL. | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2021-01-28 |
|
|
Cont ID |
|
| Sent By |
mcphers |
Date |
2021-01-28 |
Time |
10:30 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-01-28 |
Time |
10:26 |
Sent To |
|
|
| Notes |
| 2021-01-28 10:30:47 | NEW SFR | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected]. | | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) ROOFING SYSTEM TO BE USED ON THE PROVIDED PRODUCT | | | APPROVAL REQUIRES ADDITIONAL SIGNED AND SEALED | | | ATTACHMENT DETAILS FROM AN ARCHITECT OR ENGINEER FOR | | | ROOF WIND ZONES P1 P2 AND P3 WHICH REQUIRE A HIGHER | | | PRESSURE THAN THE MAXIMUM SHOWN ON THE PRODUCT APPROVAL | | | (-52.5) - SEE GENERAL LIMITATION NOTE NUMBER 7 ON THE | | | PRODUCT APPROVAL. DRAWINGS DO NOT SHOW THE REQUIRED | | | ROOF COMPONENT PRESSURES - REQUIRED PRESSURES FROM FBC | | | TABLE R301.2(2) P1=(-64.11) P2=(-84.62) P3=(-115.33) | | | 2) GUARD RAIL "VIEW RAIL" DRAWINGS CANNOT BE ACCEPTED | | | AS SIGNED AND SEALED UNLESS SIGNED AND SEALED FROM A | | | FLORIDA LICENSED ARCHITECT OR ENGINEER.FBC WPB 107.1 | | | (ALSO, ALL SHOP DRAWINGS NEED TO BE REVIEWED AND MARKED | | | APPROVED BY THE BUILDING DESIGNER OF RECORD) | | | 3) GUARD RAILS ARE SUBJECT TO LIVE LOADS - PLEASE | | | PROVIDE AN APPROVED PRODUCT APPROVAL - OR - PROVIDE | | | GUARD RAIL ATTACHMENT DETAILS ALONG WITH THE STRUCTURAL | | | CALCULATIONS THAT SHOW COMPLIANCE WITH THE REQUIRED | | | LIVE LOADS PER FBC TABLE R301.5 (WHICH MUST BE SIGNED | | | BY THE PERSON RESPONSIBLE FOR THE DESIGN) - OR- SIGNED | | | AND SEALED GUARDRAIL ATTACHMENT DETAILS FROM A FLORIDA | | | LICENSED ARCHITECT OR ENGINEER. | | | 4) DEMO PERMIT IS (20110526) | | | 5) ROOF PERMIT, GUARD RAIL SHOP DRAWINGS AND ALL | | | PRODUCT APPROVALS (WINDOWS, DOORS, ROOFING ETC.) CAN BE | | | DEFERRED SUBMITTALS IF THEY ARE LISTED TO BE DEFERRED | | | SUBMITTALS ON THE CONSTRUCTION DOCUMENTS SEE- FBC | | | 107.3.4.1 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS | | | SECTION, DEFERRED SUBMITTALS ARE | | | DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT | | | SUBMITTED AT THE TIME OF THE APPLICATION | | | AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL | | | WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY | | | SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE | | | BUILDING OFFICIAL. THE REGISTERED DESIGN | | | PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE | | | DEFERRED SUBMITTALS ON THE CONSTRUCTION | | | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. | | | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE | | | SUBMITTED TO THE REGISTERED DESIGN | | | PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW | | | THEM AND FORWARD THEM TO THE BUILDING | | | OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED | | | SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED | | | AND FOUND TO BE IN GENERAL CONFORMANCE TO THE DESIGN OF | | | THE BUILDING. THE DEFERRED | | | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE | | | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN | | | APPROVED BY THE BUILDING OFFICIAL. | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2020-12-21 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-12-21 |
Time |
14:30 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-12-17 |
Time |
12:40 |
Sent To |
|
|
| Notes |
| 2020-12-17 13:21:34 | NEW SFR | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected]. | | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) ROOFING SYSTEM TO BE USED ON THE PROVIDED PRODUCT | | | APPROVAL REQUIRES ADDITIONAL SIGNED AND SEALED | | | ATTACHMENT DETAILS FROM AN ARCHITECT OR ENGINEER FOR | | | ROOF WIND ZONES P1 P2 AND P3 WHICH REQUIRE A HIGHER | | | PRESSURE THAN THE MAXIMUM SHOWN ON THE PRODUCT APPROVAL | | | (-52.5) - SEE GENERAL LIMITATION NOTE NUMBER 7 ON THE | | | PRODUCT APPROVAL. DRAWINGS DO NOT SHOW THE REQUIRED | | | ROOF COMPONENT PRESSURES - REQUIRED PRESSURES FROM FBC | | | TABLE R301.2(2) P1=(-64.11) P2=(-84.62) P3=(-115.33) | | | 2) PRODUCT APPROVAL PROVIDED FOR THE FIXED GLASS NOA | | | 17-0614.05 REQUIRES SHUTTERS - PLEASE PROVIDE THE | | | PRODUCT APPROVAL FOR THE REQUIRED SHUTTERS. | | | 3) ALL PRODUCT APPROVALS NEED TO BE REVIEWED AND MARKED | | | APPROVED BY THE BUILDING DESIGNER OF RECORD. | | | 4) GUARD RAIL "VIEW RAIL" DRAWINGS CANNOT BE ACCEPTED | | | AS SIGNED AND SEALED UNLESS SIGNED AND SEALED FROM A | | | FLORIDA LICENSED ARCHITECT OR ENGINEER.FBC WPB 107.1 | | | (ALSO, ALL SHOP DRAWINGS NEED TO BE REVIEWED AND MARKED | | | APPROVED BY THE BUILDING DESIGNER OF RECORD) | | | 5) GUARD RAILS ARE SUBJECT TO LIVE LOADS - PLEASE | | | PROVIDE AN APPROVED PRODUCT APPROVAL - OR - PROVIDE | | | GUARD RAIL ATTACHMENT DETAILS ALONG WITH THE STRUCTURAL | | | CALCULATIONS THAT SHOW COMPLIANCE WITH THE REQUIRED | | | LIVE LOADS PER FBC TABLE R301.5 (WHICH MUST BE SIGNED | | | BY THE PERSON RESPONSIBLE FOR THE DESIGN) - OR- SIGNED | | | AND SEALED GUARDRAIL ATTACHMENT DETAILS FROM A FLORIDA | | | LICENSED ARCHITECT OR ENGINEER. | | | 6) DEMO PERMIT (20110526) | | | 7) ROOF PERMIT, GUARD RAIL SHOP DRAWINGS AND ALL | | | PRODUCT APPROVALS (WINDOWS, DOORS, ROOFING ETC.) CAN BE | | | DEFERRED SUBMITTALS IF THEY ARE LISTED TO BE DEFERRED | | | SUBMITTALS ON THE CONSTRUCTION DOCUMENTS SEE- FBC | | | 107.3.4.1 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS | | | SECTION, DEFERRED SUBMITTALS ARE | | | DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT | | | SUBMITTED AT THE TIME OF THE APPLICATION | | | AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL | | | WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY | | | SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE | | | BUILDING OFFICIAL. THE REGISTERED DESIGN | | | PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE | | | DEFERRED SUBMITTALS ON THE CONSTRUCTION | | | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. | | | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE | | | SUBMITTED TO THE REGISTERED DESIGN | | | PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW | | | THEM AND FORWARD THEM TO THE BUILDING | | | OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED | | | SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED | | | AND FOUND TO BE IN GENERAL CONFORMANCE TO THE DESIGN OF | | | THE BUILDING. THE DEFERRED | | | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE | | | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN | | | APPROVED BY THE BUILDING OFFICIAL. | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2020-11-24 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-11-24 |
Time |
14:44 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-11-24 |
Time |
11:25 |
Sent To |
|
|
| Notes |
| 2020-11-24 14:34:59 | NEW SFR | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected]. | | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) PLEASE SHOW THE SILL HEIGHT FOR WINDOW MARK "J" TO | | | COMPLY WITH EMERGENCY EGRESS REQUIREMENTS PER FBC | | | R310.2.2 | | | 2) DRAWING "S-3" IS THE WRONG DRAWING FOR THIS PROJECT. | | | 3) PLEASE SHOW THE SETBACK DISTANCE FROM THE PROPERTY | | | LINES FOR THE POOL PAVERS AND THE AC EQUIPMENT PADS. | | | 4) PLEASE PROVIDE COMPLETE MIAMI DADE OR FLORIDA STATE | | | PRODUCT APPROVALS FOR THE EXTERIOR WINDOWS AND DOORS. | | | ALL PRODUCT APPROVALS NEED TO BE REVIEWED AND MARKED | | | APPROVED BY THE BUILDING DESIGNER OF RECORD. | | | 5) PLEASE PROVIDE COMPLETE MIAMI DADE OR FLORIDA STATE | | | ROOFING SYSTEM PRODUCT APPROVALS. IN THE PRODUCT | | | APPROVAL PROVIDED FOR THE FLAT DECK - PLEASE CIRCLE THE | | | ROOFING SYSTEM TO BE USED IN THE ROOFING PRODUCT | | | APPROVAL - ROOFING SYSTEM TO BE USED ON THE PROVIDED | | | PRODUCT APPROVAL MAY REQUIRE ADDITIONAL SIGNED AND | | | SEALED ATTACHMENT DETAILS FROM AN ARCHITECT OR ENGINEER | | | FOR ROOF WIND ZONES 2 AND 3 WHICH REQUIRE A HIGHER | | | PRESSURE THAN THE MAXIMUM SHOWN ON THE PRODUCT APPROVAL | | | - SEE GENERAL LIMITATION NOTES ON THE PRODUCT APPROVAL. | | | 6) PLEASE PROVIDE A SIGNED AND SEALED SURVEY SHOWING | | | THE FOLLOWING INFORMATION 107.2.5 SITE PLAN. THE | | | CONSTRUCTION DOCUMENTS SUBMITTED WITH THE APPLICATION | | | FOR PERMIT SHALL BE ACCOMPANIED BY A SITE PLAN SHOWING | | | TO SCALE THE SIZE AND LOCATION OF NEW CONSTRUCTION AND | | | EXISTING STRUCTURES ON THE SITE, DISTANCES FROM LOT | | | LINES, THE ESTABLISHED STREET GRADES AND THE PROPOSED | | | FINISHED GRADES, DEPICTING THE PROPOSED LOT DRAINAGE | | | AND, AS APPLICABLE, FLOOD HAZARD AREAS, FLOODWAYS, AND | | | DESIGN FLOOD ELEVATIONS; AND IT SHALL BE DRAWN IN | | | ACCORDANCE WITH AN ACCURATE AND INCLUDED ON A BOUNDARY | | | LINE SURVEY. (PLEASE PROVIDE CUT SECTIONS FOR ANY | | | PROPOSED WATER RETAINING SWALES) | | | 7) A SEPARATE DEMO PLAN IS REQUIRED - PLEASE SHOW | | | PERMIT NUMBER FOR THE DEMO PERMIT. | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
4 |
Status |
P |
Date |
2021-05-12 |
|
|
Cont ID |
|
| Sent By |
equinone |
Date |
2021-05-12 |
Time |
12:37 |
Rev Time |
0.00 |
| Received By |
equinone |
Date |
2021-05-12 |
Time |
12:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2021-01-13 |
|
|
Cont ID |
|
| Sent By |
equinone |
Date |
2021-01-13 |
Time |
14:38 |
Rev Time |
0.00 |
| Received By |
equinone |
Date |
2021-01-13 |
Time |
14:27 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2020-12-16 |
|
|
Cont ID |
|
| Sent By |
equinone |
Date |
2020-12-16 |
Time |
08:58 |
Rev Time |
0.00 |
| Received By |
equinone |
Date |
2020-12-16 |
Time |
08:40 |
Sent To |
|
|
| Notes |
| 2020-12-16 09:02:13 | CODES IN EFFECT | | | CODES IN EFFECT: | | | FBC = FLORIDA BUILDING CODE 2017 6TH EDITION | | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 | | | 6TH ED, CHAPTER 1. | | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 | | | 6TH EDITION | | | FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017 | | | 6TH EDITION | | | FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION | | | NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE | | | FS = FLORIDA STATUTES | | | FAC = FLORIDA ADMINISTRATIVE CODE | | | | | | ELECTRICAL REVIEW STATUS: FAILED. | | | | | | SEE PREVIOUS COMMENTS BELOW AND IF CORRECTIONS WERE | | | PROVIDED. | | | | | | 1) PLEASE SHOW LOCATION OF NEW OUTSIDE PANEL AND | | | IDENTIFY NEW ELECTRICAL PANEL A FBC 107 | | | CORRECTED | | | 2) GFCI, WP RECEPTACLE REQUIRED AT THE FRONT AND BACK | | | OF THE DWELLING NEC 210.52(E) | | | CORRECTED | | | 3) NOTE 1 MENTIONS GROUNDING CONDUCTORS REQUIRED AT | | | SWITCH LOCATIONS PER NEC 404.2. ARTICLE 404.2 OF NEC | | | DOES NOT TALK ABOUT OR REFER TO GROUNDING CONDUCTORS | | | REQUIRED AT SWITCH LOCATIONS. | | | NOT CORRECTED. NOTE 1 IS STILL WRONGLY REFERRING TO | | | GROUNDING CONDUCTORS REQUIRED AT SWITCH LOCATIONS. | | | 4) SPECIFY AVAILABLE FAULT CURRENT AT PANELS FBC 107 | | | NOT CORRECTED. PLEASE PROVIDE THIS INFORMATION AND | | | INTERRUPTING RATING OF PANELBOARDS. | | | 5) EQUIPOTENTIAL POOL BONDING REQUIRED - NEC 680.26 | | | CORRECTED | | | 6) POOL RECEPTACLE REQUIRED - NEC 680-22 | | | CORRECTED | | | | | | END OF COMMENTS. | | | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES | | | INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE | | | PREVIOUSLY REVIEWED SHEETS. | | | CODES IN EFFECT: | | | | | | SINCERELY, | | | | | | ENRIQUE QUINONEZ | | | ELECTRICAL PLANS EXAMINER | | | 561-805-6746 | | | [email protected] | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2020-12-01 |
|
|
Cont ID |
|
| Sent By |
equinone |
Date |
2020-12-01 |
Time |
14:33 |
Rev Time |
0.00 |
| Received By |
equinone |
Date |
2020-12-01 |
Time |
14:32 |
Sent To |
|
|
| Notes |
| 2020-12-01 14:33:18 | CODES IN EFFECT | | | CODES IN EFFECT: | | | FBC = FLORIDA BUILDING CODE 2017 6TH EDITION | | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 | | | 6TH ED, CHAPTER 1. | | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 | | | 6TH EDITION | | | FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017 | | | 6TH EDITION | | | FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION | | | NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE | | | FS = FLORIDA STATUTES | | | FAC = FLORIDA ADMINISTRATIVE CODE | | | | | | ELECTRICAL REVIEW STATUS: FAILED. | | | | | | 1) PLEASE SHOW LOCATION OF NEW OUTSIDE PANEL AND | | | IDENTIFY NEW ELECTRICAL PANEL A FBC 107 | | | 2) GFCI, WP RECEPTACLE REQUIRED AT THE FRONT AND BACK | | | OF THE DWELLING NEC 210.52(E) | | | 3) NOTE 1 MENTIONS ?GROUNDING CONDUCTORS REQUIRED AT | | | SWITCH LOCATIONS PER NEC 404.2?. ARTICLE 404.2 OF NEC | | | DOES NOT TALK ABOUT OR REFER TO GROUNDING CONDUCTORS | | | REQUIRED AT SWITCH LOCATIONS. | | | 4) SPECIFY AVAILABLE FAULT CURRENT AT PANELS FBC 107 | | | 5) EQUIPOTENTIAL POOL BONDING REQUIRED - NEC 680.26 | | | 6) POOL RECEPTACLE REQUIRED - NEC 680-22 | | | | | | PLEASE CLARIFY AND CORRECT. | | | | | | END OF COMMENTS. | | | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES | | | INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE | | | PREVIOUSLY REVIEWED SHEETS. | | | CODES IN EFFECT: | | | | | | SINCERELY, | | | | | | ENRIQUE QUINONEZ | | | ELECTRICAL PLANS EXAMINER | | | 561-805-6746 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
11 |
Status |
N |
Date |
2021-05-27 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-05-27 |
Time |
09:03 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-05-26 |
Time |
12:02 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
10 |
Status |
N |
Date |
2021-05-12 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-05-12 |
Time |
18:36 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-05-07 |
Time |
16:55 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
9 |
Status |
N |
Date |
2021-05-05 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-05-05 |
Time |
12:00 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-05-03 |
Time |
07:04 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
8 |
Status |
N |
Date |
2021-04-28 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-04-28 |
Time |
10:00 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-04-22 |
Time |
09:18 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
7 |
Status |
N |
Date |
2021-04-16 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-04-16 |
Time |
14:50 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-04-07 |
Time |
13:39 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
6 |
Status |
N |
Date |
2021-03-04 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-03-04 |
Time |
14:37 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-02-26 |
Time |
06:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2021-02-12 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-02-12 |
Time |
14:45 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-02-08 |
Time |
13:00 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2021-02-02 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-02-01 |
Time |
06:41 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-01-29 |
Time |
17:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2021-01-28 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-01-28 |
Time |
10:43 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-01-11 |
Time |
13:28 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2020-12-21 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-12-21 |
Time |
14:30 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-12-15 |
Time |
14:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-12-01 |
|
|
Cont ID |
|
| Sent By |
equinone |
Date |
2020-12-01 |
Time |
14:42 |
Rev Time |
0.00 |
| Received By |
equinone |
Date |
2020-11-14 |
Time |
20:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
2 |
Status |
P |
Date |
2021-06-07 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2021-06-07 |
Time |
10:59 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2021-05-27 |
Time |
08:14 |
Sent To |
|
|
| Notes |
| 2021-06-07 10:59:54 | RECEIPT MU-2021-27458 - $2430.79 - PAID | | 2021-05-27 08:14:14 | 5/27/21 EMAILED IMPACT OFFICE FOR REVIEW. LEM |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
1 |
Status |
F |
Date |
2020-11-24 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-11-24 |
Time |
14:44 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-11-24 |
Time |
14:44 |
Sent To |
|
|
| Notes |
| 2020-11-24 14:47:32 | PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE | | | DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS | | | OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST | | | FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE | | | OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL | | | IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME | | | THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM | | | CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS | | | TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF | | | | | | UPON APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE | | | RECEIPT TO YOUR PROJECT OR EMAIL IT TO | | | [email protected] . | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
P |
Date |
2021-05-27 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-05-27 |
Time |
08:32 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-05-27 |
Time |
08:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2020-12-16 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2020-12-16 |
Time |
07:40 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2020-12-16 |
Time |
07:40 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2020-11-19 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2020-11-19 |
Time |
10:43 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2020-11-19 |
Time |
08:31 |
Sent To |
|
|
| Notes |
| 2020-11-19 10:43:28 | 1ST REVIEW FBC-2017 MECHANICAL | | | PERMIT-20110521 | | | | | | CODES IN EFFECT: | | | | | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | | 2017 | | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION | | | 2017 | | | FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH | | | EDITION 2017 | | | FS- FLORIDA STATUTES | | | FAC- FLORIDA ADMINISTRATIVE CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | | EDITION 2017 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) HVAC LOADS CALCULATIONS INDICATES THAT BEDROOM #3 IS | | | BEING SUPPLIED WITH 101 CFM OF CONDITIONED AIR. THE | | | DRAWINGS INDICATE THIS SAME BEDROOM BEING SUPPLIED WITH | | | 10 CFM OF CONDITIONED AIR. PLEASE CORRECT DRAWINGS. FBC | | | 107.2 | | | | | | 2) SHEET M.2; EQUIPMENT SCHEDULE- THERE ARE 2 | | | MECHANICAL SYSTEMS FOR THIS PROJECT. SYSTEM # COLUMN | | | INDICATE BOTH UNITS ARE 1,PLEASE IDENTIFY EACH AS AHU-1 | | | AND AHU-2 AS SHOWING ON THE DRAWINGS. FBC 107.2 | | | | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD | | | SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER | | | SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN | | | THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS | | | PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS | | | PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR | | | UPDATED. | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2020-12-17 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2020-12-17 |
Time |
13:48 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2020-12-17 |
Time |
13:47 |
Sent To |
|
|
| Notes |
| 2020-12-17 13:49:08 | 12/17/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING) | | | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | | PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES | | | FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, | | | STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT | | | THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK | | | OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | | AVOID VOIDING OF THE PERMIT. | | | | | | LUIS A. CRESPO | | | PLUMBING PLAN EXAMINER / INSPECTOR | | | EMAIL: [email protected] OFFICE: 561 805-6720 | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2020-11-30 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2020-11-30 |
Time |
12:41 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2020-11-30 |
Time |
12:41 |
Sent To |
|
|
| Notes |
| 2020-11-30 12:41:30 | 11/30/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS | | | | | | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS | | | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE | | | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. | | | | | | 1. THE CABANA BATH HAS THE WINE BAR SINK IN A WET | | | CANNOT DISCHARGE INTO THE WET VET OF A BATHROOM GROUP | | | IT MUST BE DOWNSTREAM PER THE 2017 FBC SECTION R3108.1 | | | HORIZONTAL WET VENT PERMITTED. | | | | | | 2. IN MASTER PLEASE PROVIDE A VENT BETWEEN BOTH WATER | | | CLOSETS PER THE 2017 FBC SEC. R 3101.2 TRAP SEAL | | | PROTECTION. | | | | | | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & | | | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS | | | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL | | | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE | | | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION | | | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO | | | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED | | | COOPERATION. | | | | | | HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA | | | | | | LUIS A. CRESPO | | | PLUMBING PLAN EXAMINER / INSPECTOR | | | EMAIL: [email protected] OFFICE: 561 805-6720 | | | |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
11 |
Status |
P |
Date |
2021-05-27 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-05-27 |
Time |
09:02 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-05-27 |
Time |
09:02 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
10 |
Status |
F |
Date |
2021-05-12 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-05-12 |
Time |
18:06 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-05-12 |
Time |
18:06 |
Sent To |
|
|
| Notes |
| 2021-05-12 18:07:48 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. FS553.791, THE AFFIDAVIT FOR SHEET P2 IS FOR VERSION | | | 2. THE PLAN UPLOADED IS FOR REVISION 1 DATED 12/9/20. | | | | | | NOTE THAT THE AFFIDAVIT REFERS TO V1, V2, ETC. YOU | | | CANNOT USE PROJECTDOX VERSIONING FOR AFFIDAVITS, THERE | | | IS NO WAY TO SAVE VERSIONING. SO, I THINK BY V1 YOU | | | MEAN REVISION 1, V2 IS REVISION 2. IN THE FUTURE DO NOT | | | USE V1, V2, ETC. UNLESS THE PLAN REVISIONS ARE NAMED | | | V1, V2, ETC. | | | | | | 2. THE AFFIDAVIT FOR THE SUPPORTING DOCS REFERS TO | | | "NOA'S". REVISE THE AFFIDAVIT TO LIST THE NOAS THAT | | | WERE REVIEWED, OR PROVIDE NOAS THAT ARE STAMPED BY THE | | | PRIVATE PROVIDER AS REVIEWED. | | | | | | 3. ROOF ENHANCED FASTENING ENGINEERING IS NOT INCLUDED | | | IN THE AFFIDAVIT. | | | | | | | | | |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
9 |
Status |
P |
Date |
2021-05-05 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-05-05 |
Time |
12:00 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-05-05 |
Time |
12:00 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
8 |
Status |
F |
Date |
2021-04-28 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-04-28 |
Time |
09:45 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-04-28 |
Time |
09:45 |
Sent To |
|
|
| Notes |
| 2021-04-28 09:46:25 | NO CHANGES SINCE THE LAST REVIEW - | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. A NEW AFFIDAVIT WAS SUBMITTED, BUT DOES NOT REFER TO | | | THE VERSION NUMBER FOR EACH PAGE AND DOES NOT REFER TO | | | SHOP DRAWINGS, PRODUCT APPROVALS, ETC. (SEE PREVIOUS | | | PRIVATE PROVIDER REVIEW). THE AFFIDAVIT ONLY LISTS PLAN | | | PAGES AND SURVEY. AFFIDAVIT REFERS TO 16 PAGES, BU | | | TTHERE ARE 17 PAGES IN THE PROJECTDOX UPLOAD AS WELL AS | | | MANY SUPPORTING DOCUMENTS. SOME PLANS WERE SUBMITTED | | | THREE TIMES; NOT CLEAR WHICH OF THE VERSIONS WERE | | | REVIEWED BY THE PRIVATE PROVIDER AS WE DID NOT GET A | | | NEW AFFIDAVIT WITH VERSION NUMBERS FOR EACH REVIEW. | | | | | | FOR EXAMPLE: | | | COVER SHEET A1 (WHICH INCLUDES WIND DESIGN CRITERIA, | | | GENERAL NOTES, ETC.) IS DIGITALLY SIGNED 12/14/20. THIS | | | WAS 2ND VERSION, NO SHOP DRAWING REVIEW BY UNIVERSAL | | | ENGINEERING. | | | SHEET A3 INCLUDES A SHOP DRAWING REVIEW, DIGITALLY | | | SIGNED 11/8. | | | SHEET E1 IS NOT DIGITALLY SIGNED, IS VERSION 3 DATED | | | 1/9/21, NO SHOP DRAWING REVIEW BY UNIVERSAL. | | | | | | IF AN AFFIDAVIT WAS PROVIDED EVERY CYCLE, OR SHOP | | | DRAWING REVIEW WAS DONE EVERY CYCLE, THE VERSION | | | REVIEWED WOULD BE CLEARER (BUT WOULD BE 100% CLEAR WITH | | | EITHER A SHOP DRAWING REVIEW OR AN AFFIDAVIT REFERRING | | | TO VERSION DATE). AS SUBMITED, I CANNOT DETERMINE WHICH | | | SUBMITTALS WERE REVIEWED BY THE PRIVATE PROVIDER. | | | REVIEW OF SUPPORTING DOCUMENTS DOES NOT APPEAR TO HAVE | | | BEEN DONE. | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
7 |
Status |
F |
Date |
2021-04-16 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-04-16 |
Time |
14:32 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-04-16 |
Time |
14:32 |
Sent To |
|
|
| Notes |
| 2021-04-16 14:34:00 | NO CHANGES SINCE THE LAST REVIEW - | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. A NEW AFFIDAVIT WAS SUBMITTED, BUT DOES NOT REFER TO | | | THE VERSION NUMBER FOR EACH PAGE AND DOES NOT REFER TO | | | SHOP DRAWINGS, PRODUCT APPROVALS, ETC. (SEE PREVIOUS | | | PRIVATE PROVIDER REVIEW). THE AFFIDAVIT ONLY LISTS PLAN | | | PAGES AND SURVEY. AFFIDAVIT REFERS TO 16 PAGES, BU | | | TTHERE ARE 17 PAGES IN THE PROJECTDOX UPLOAD AS WELL AS | | | MANY SUPPORTING DOCUMENTS. SOME PLANS WERE SUBMITTED | | | THREE TIMES; NOT CLEAR WHICH OF THE VERSIONS WERE | | | REVIEWED BY THE PRIVATE PROVIDER AS WE DID NOT GET A | | | NEW AFFIDAVIT WITH VERSION NUMBERS FOR EACH REVIEW. | | | | | | FOR EXAMPLE: | | | COVER SHEET A1 (WHICH INCLUDES WIND DESIGN CRITERIA, | | | GENERAL NOTES, ETC.) IS DIGITALLY SIGNED 12/14/20. THIS | | | WAS 2ND VERSION, NO SHOP DRAWING REVIEW BY UNIVERSAL | | | ENGINEERING. | | | SHEET A3 INCLUDES A SHOP DRAWING REVIEW, DIGITALLY | | | SIGNED 11/8. | | | SHEET E1 IS NOT DIGITALLY SIGNED, IS VERSION 3 DATED | | | 1/9/21, NO SHOP DRAWING REVIEW BY UNIVERSAL. | | | | | | IF AN AFFIDAVIT WAS PROVIDED EVERY CYCLE, OR SHOP | | | DRAWING REVIEW WAS DONE EVERY CYCLE, THE VERSION | | | REVIEWED WOULD BE CLEARER (BUT WOULD BE 100% CLEAR WITH | | | EITHER A SHOP DRAWING REVIEW OR AN AFFIDAVIT REFERRING | | | TO VERSION DATE). AS SUBMITED, I CANNOT DETERMINE WHICH | | | SUBMITTALS WERE REVIEWED BY THE PRIVATE PROVIDER. | | | REVIEW OF SUPPORTING DOCUMENTS DOES NOT APPEAR TO HAVE | | | BEEN DONE. | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
6 |
Status |
F |
Date |
2021-03-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-03-01 |
Time |
11:13 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-03-01 |
Time |
11:13 |
Sent To |
|
|
| Notes |
| 2021-03-01 11:14:51 | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. A NEW AFFIDAVIT WAS SUBMITTED, BUT DOES NOT REFER TO | | | THE VERSION NUMBER FOR EACH PAGE AND DOES NOT REFER TO | | | SHOP DRAWINGS, PRODUCT APPROVALS, ETC. (SEE PREVIOUS | | | PRIVATE PROVIDER REVIEW). THE AFFIDAVIT ONLY LISTS PLAN | | | PAGES AND SURVEY. AFFIDAVIT REFERS TO 16 PAGES, BU | | | TTHERE ARE 17 PAGES IN THE PROJECTDOX UPLOAD AS WELL AS | | | MANY SUPPORTING DOCUMENTS. SOME PLANS WERE SUBMITTED | | | THREE TIMES; NOT CLEAR WHICH OF THE VERSIONS WERE | | | REVIEWED BY THE PRIVATE PROVIDER AS WE DID NOT GET A | | | NEW AFFIDAVIT WITH VERSION NUMBERS FOR EACH REVIEW. | | | | | | FOR EXAMPLE: | | | COVER SHEET A1 (WHICH INCLUDES WIND DESIGN CRITERIA, | | | GENERAL NOTES, ETC.) IS DIGITALLY SIGNED 12/14/20. THIS | | | WAS 2ND VERSION, NO SHOP DRAWING REVIEW BY UNIVERSAL | | | ENGINEERING. | | | SHEET A3 INCLUDES A SHOP DRAWING REVIEW, DIGITALLY | | | SIGNED 11/8. | | | SHEET E1 IS NOT DIGITALLY SIGNED, IS VERSION 3 DATED | | | 1/9/21, NO SHOP DRAWING REVIEW BY UNIVERSAL. | | | | | | IF AN AFFIDAVIT WAS PROVIDED EVERY CYCLE, OR SHOP | | | DRAWING REVIEW WAS DONE EVERY CYCLE, THE VERSION | | | REVIEWED WOULD BE CLEARER (BUT WOULD BE 100% CLEAR WITH | | | EITHER A SHOP DRAWING REVIEW OR AN AFFIDAVIT REFERRING | | | TO VERSION DATE). AS SUBMITED, I CANNOT DETERMINE WHICH | | | SUBMITTALS WERE REVIEWED BY THE PRIVATE PROVIDER. | | | REVIEW OF SUPPORTING DOCUMENTS DOES NOT APPEAR TO HAVE | | | BEEN DONE. | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
5 |
Status |
F |
Date |
2021-02-12 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-02-12 |
Time |
14:45 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-02-12 |
Time |
14:03 |
Sent To |
|
|
| Notes |
| 2021-02-12 14:14:25 | PRIVATE PROVIDER DOCUMENTS | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | | | | 1) THE "PRIVATE PROVIDER PLAN COMPLIANCE AFFIDAVIT" WAS | | | SIGNED ON 11/09/2020 - THERE HAVE BEEN DRAWING | | | REVISIONS SINCE THAT DATE - PLEASE PROVIDE AN UPDATED | | | "PRIVATE PROVIDER PLAN COMPLIANCE AFFIDAVIT" FORM. | | | 2) THE REVIEWED DRAWINGS LISTED ON THE "PRIVATE | | | PROVIDER PLAN COMPLIANCE AFFIDAVIT" NEEDS TO INCLUDE | | | ALL PRODUCT APPROVALS, ALL SHOP DRAWINGS (GUARD RAILS) | | | ETC. | | | |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
4 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2021-02-01 |
Time |
|
Rev Time |
0.00 |
| Received By |
rgathrig |
Date |
2021-02-01 |
Time |
12:20 |
Sent To |
|
|
| Notes |
| 2021-02-01 12:23:05 | REVIEW FAILED | | | | | | | | | NO NEW DOCUMENTS HAVE BEEN SUBMITTED SINCE THE LAST | | | REVIEW | | | | | | RICHARD GATHRIGHT | | | ASSSISTANT BUILDING OFFICIAL | | | 561 805 6679 |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
3 |
Status |
F |
Date |
2021-01-13 |
|
|
Cont ID |
|
| Sent By |
rgathrig |
Date |
2021-01-13 |
Time |
17:34 |
Rev Time |
0.00 |
| Received By |
rgathrig |
Date |
2021-01-13 |
Time |
17:19 |
Sent To |
|
|
| Notes |
| 2021-01-13 17:34:21 | PRIVATE PROVIDER REVIEW FOR INSPECTIONS IS FAILED | | | 20110521 | | | | | | NOTICE TO BUILDING OFFICIAL SUBMITTED 11/13/20 SIGNED | | | 11/11/20 NAMES GFA INTERNATIONAL AS THE FIRM AND GEORGE | | | DIXON AS THE PRIVATE PROVIDER FOR BOTH PLAN REVIEW AND | | | INSPECTIONS. | | | | | | THE PLAN COMPLIANCE AFFIDAVIT WAS RESUBMITTED ON | | | 1/11/2021 NAMES GARY VIGRASS AND GEORGE DIXON AS THE | | | PLAN REVIEWERS AND SIGNED BY MR. DIXON ON 11/09/20. | | | PLAN SHEETS LISTED ARE, A1, A2, A3, | | | A4, A5, E1, L1, P1, P2, S1, S2, S3, S4, EN. CALCS., | | | MAN. J, M1, M2. THIS IS THE SAME AFFIDAVIT THAT WAS | | | ORIGINALLY SUBMITTED | | | | | | DEFICIENCIES OBSERVED IN THE AFFIDAVIT: | | | 1. AFFIDAVIT DOES NOT IDENTIFY THE PROJECT BEING | | | REVIEWED AS THE BORNIA RESIDENCE. BORNIA RESIDENCE IS | | | MENTIONED AT TOP OF AFFIDAVIT | | | 2. PLAN SHEETS LISTED AS REVIEWED IN THE AFFIDAVIT DOES | | | NOT LIST THE PROFESSIONAL DESIGNER(S), DATE OF DRAWINGS | | | OR LATEST REVISION. | | | 3. AFFIDAVIT DOES NOT MENTION REVIEW OF PRODUCT | | | APPROVALS | | | 4. THE CERTIFICATE OF INSURANCE SUBMITTED 1/11/21, | | | DATED 08/24/2020 DOES NOT STATE THAT PROFESSIONAL | | | LIABILITY INSURANCE COVERAGE IS IN PLACE FOR THE | | | PRIVATE PROVIDER?S FIRM, THE PRIVATE PROVIDER, AND ANY | | | DULY AUTHORIZED REPRESENTATIVE IN THE AMOUNTS REQUIRED. | | | 553.791 (4) | | | 5. NEW AFFIDAVITS NEED TO BE SUBMITTED TO COVER THE 8 | | | NEW PAGES SUBMITTED AFTER THE DATE OF 11/09/2020 OF THE | | | ORIGINAL AFFIDAVIT THAT DID NOT LIST THE DESIGINERS OR | | | DATES OF PAGES | | | | | | | | | RICHARD GATHRIGHT | | | ASSISTANT BUILDING OFFICIAL | | | 561-805-6679 | | | |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
2 |
Status |
F |
Date |
2020-12-19 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-12-19 |
Time |
06:28 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-12-19 |
Time |
06:28 |
Sent To |
|
|
| Notes |
| 2020-12-19 06:33:22 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | | | | PLEASE SEE COMMENTS FROM FIRST REVIEW CYCLE; FOR YOUR | | | CONVENIENCE THE COMMENTS ARE BELOW. | | | | | | PLANS WERE REVISED, NEW DOCUMENTS SUBMITTED (PRODUCT | | | APPROVALS, ETC.) BUT A NEW COMPLIANCE AFFIDAVIT WAS NOT | | | SUBMITTED. IT IS NOT CLEAR WHAT THE PRIVATE PROVIDER | | | HAS AND HAS NOT REVIEWED. | | | | | | | | | PRIVATE PROVIDER REVIEW FOR INSPECTIONS IS FAILED | | | 20110521 | | | | | | NOTICE TO BUILDING OFFICIAL SUBMITTED 11/13/20 SIGNED | | | 11/11/20 NAMES GFA INTERNATIONAL AS THE FIRM AND GEORGE | | | DIXON AS THE PRIVATE PROVIDER FOR BOTH PLAN REVIEW AND | | | INSPECTIONS. | | | THE PLAN COMPLIANCE AFFIDAVIT NAMES GARY VIGRASS AND | | | GEORGE DIXON AS THE PLAN REVIEWERS AND SIGNED BY MR. | | | DIXON ON 11/09/20. PLAN SHEETS LISTED ARE, A1, A2, A3, | | | A4, A5, E1, L1, P1, P2, S1, S2, S3, S4, EN. CALCS., | | | MAN. J, M1, M2. | | | | | | DEFICIENCIES OBSERVED IN THE AFFIDAVIT: | | | ? AFFIDAVIT DOES NOT IDENTIFY THE PROJECT BEING | | | REVIEWED | | | ? PLAN SHEETS LISTED AS REVIEWED IN THE AFFIDAVIT DOES | | | NOT LIST THE PROFESSIONAL DESIGNER(S), DATE OF DRAWINGS | | | OR LATEST REVISION | | | | | | THE CERTIFICATE OF INSURANCE SUBMITTED 11/13/20, DATED | | | 08/24/2020 DOES NOT STATE THAT PROFESSIONAL LIABILITY | | | INSURANCE COVERAGE IS IN PLACE FOR THE PRIVATE | | | PROVIDER?S FIRM, THE PRIVATE PROVIDER, AND ANY DULY | | | AUTHORIZED REPRESENTATIVE IN THE AMOUNTS REQUIRED. | | | 553.791 (4) | | | | | | WILL MR. DIXON BE THE ONLY PERSON PERFORMING THE | | | PRIVATE PROVIDER INSPECTION SERVICES AT 425 SUNSET | | | ROAD? ONLY MR. DIXON?S LICENSE NUMBERS WERE PROVIDED, | | | NO RESUMES FOR MR. DIXON OR QUALIFICATION STATEMENTS | | | FOR MR. DIXON OR ANY OTHER INFORMATION CONCERNING OTHER | | | PEOPLE THAT MAY BE PERFORMING PRIVATE PROVIDER | | | INSPECTIONS AT THIS ADDRESS. | | | | | | | | | | | | RICHARD GATHRIGHT | | | ASSISTANT BUILDING OFFICIAL | | | 561-805-6679 | | | |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
1 |
Status |
F |
Date |
2020-11-25 |
|
|
Cont ID |
|
| Sent By |
rgathrig |
Date |
2020-11-25 |
Time |
12:26 |
Rev Time |
0.00 |
| Received By |
rgathrig |
Date |
2020-11-25 |
Time |
12:24 |
Sent To |
|
|
| Notes |
| 2020-11-25 12:26:46 | PRIVATE PROVIDER REVIEW FOR INSPECTIONS IS FAILED | | | 20110521 | | | | | | NOTICE TO BUILDING OFFICIAL SUBMITTED 11/13/20 SIGNED | | | 11/11/20 NAMES GFA INTERNATIONAL AS THE FIRM AND GEORGE | | | DIXON AS THE PRIVATE PROVIDER FOR BOTH PLAN REVIEW AND | | | INSPECTIONS. | | | THE PLAN COMPLIANCE AFFIDAVIT NAMES GARY VIGRASS AND | | | GEORGE DIXON AS THE PLAN REVIEWERS AND SIGNED BY MR. | | | DIXON ON 11/09/20. PLAN SHEETS LISTED ARE, A1, A2, A3, | | | A4, A5, E1, L1, P1, P2, S1, S2, S3, S4, EN. CALCS., | | | MAN. J, M1, M2. | | | | | | DEFICIENCIES OBSERVED IN THE AFFIDAVIT: | | | ? AFFIDAVIT DOES NOT IDENTIFY THE PROJECT BEING | | | REVIEWED | | | ? PLAN SHEETS LISTED AS REVIEWED IN THE AFFIDAVIT DOES | | | NOT LIST THE PROFESSIONAL DESIGNER(S), DATE OF DRAWINGS | | | OR LATEST REVISION | | | | | | THE CERTIFICATE OF INSURANCE SUBMITTED 11/13/20, DATED | | | 08/24/2020 DOES NOT STATE THAT PROFESSIONAL LIABILITY | | | INSURANCE COVERAGE IS IN PLACE FOR THE PRIVATE | | | PROVIDER?S FIRM, THE PRIVATE PROVIDER, AND ANY DULY | | | AUTHORIZED REPRESENTATIVE IN THE AMOUNTS REQUIRED. | | | 553.791 (4) | | | | | | WILL MR. DIXON BE THE ONLY PERSON PERFORMING THE | | | PRIVATE PROVIDER INSPECTION SERVICES AT 425 SUNSET | | | ROAD? ONLY MR. DIXON?S LICENSE NUMBERS WERE PROVIDED, | | | NO RESUMES FOR MR. DIXON OR QUALIFICATION STATEMENTS | | | FOR MR. DIXON OR ANY OTHER INFORMATION CONCERNING OTHER | | | PEOPLE THAT MAY BE PERFORMING PRIVATE PROVIDER | | | INSPECTIONS AT THIS ADDRESS. | | | | | | | | | | | | RICHARD GATHRIGHT | | | ASSISTANT BUILDING OFFICIAL | | | 561-805-6679 | | | |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
9 |
Status |
P |
Date |
2021-05-27 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-05-27 |
Time |
09:02 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-05-27 |
Time |
09:02 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
8 |
Status |
P |
Date |
2021-04-28 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-04-28 |
Time |
09:57 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-04-28 |
Time |
09:57 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
7 |
Status |
F |
Date |
2021-04-16 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-04-16 |
Time |
14:50 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-04-16 |
Time |
14:50 |
Sent To |
|
|
| Notes |
| 2021-04-16 14:50:35 | SEE BUILDING PLAN REVIEW |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
6 |
Status |
F |
Date |
2021-03-04 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-03-04 |
Time |
14:37 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-03-04 |
Time |
14:37 |
Sent To |
|
|
| Notes |
| 2021-03-04 14:37:43 | SEE BUILDING PLAN REVIEW |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
5 |
Status |
F |
Date |
2021-02-12 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-02-12 |
Time |
13:58 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-02-12 |
Time |
13:58 |
Sent To |
|
|
| Notes |
| 2021-02-12 13:58:20 | SEE BUILDING PLAN REVIEW |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
4 |
Status |
F |
Date |
2021-02-01 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-02-01 |
Time |
09:22 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-02-01 |
Time |
09:22 |
Sent To |
|
|
| Notes |
| 2021-02-01 09:22:36 | SEE BUILDING PLAN REVIEW |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
3 |
Status |
F |
Date |
2021-01-28 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-01-28 |
Time |
10:42 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-01-28 |
Time |
10:42 |
Sent To |
|
|
| Notes |
| 2021-01-28 10:43:16 | SEE BUILDING PLAN REVIEW |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
2 |
Status |
F |
Date |
2020-12-17 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-12-17 |
Time |
13:31 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-12-17 |
Time |
13:31 |
Sent To |
|
|
| Notes |
| 2020-12-17 13:32:04 | SEE BUILDING PLAN REVIEW |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2020-11-24 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-11-24 |
Time |
14:47 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-11-24 |
Time |
14:47 |
Sent To |
|
|
| Notes |
| 2020-11-24 14:48:18 | SEE BUILDING PLAN REVIEW |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
10 |
Status |
P |
Date |
2021-05-27 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-05-27 |
Time |
08:34 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-05-27 |
Time |
08:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
9 |
Status |
P |
Date |
2021-05-12 |
|
|
Cont ID |
|
| Sent By |
equinone |
Date |
2021-05-12 |
Time |
12:47 |
Rev Time |
0.00 |
| Received By |
equinone |
Date |
2021-05-12 |
Time |
12:47 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
8 |
Status |
F |
Date |
2021-05-04 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2021-05-04 |
Time |
11:58 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-05-04 |
Time |
11:58 |
Sent To |
|
|
| Notes |
| 2021-05-04 11:58:48 | SHEET E1 VERSION 12/14/20 WAS DIGITALLY SIGNED; NEW | | | VERSION DATED 1/11/21 IS NOT DIGITALLY SIGNED. | | | | | | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. | | | DRAWINGS DO NOT SHOW IN "ADOBE READER" AS | | | DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR | | | ARCHITECT OR ENGINEER DOES NOT HAVE AN ELECTRONIC OR | | | DIGITAL SIGNATURE - YOU CAN MAIL IN OR DROP OFF THE | | | ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS TO THE | | | FRONT DESK IN THE BUILDING DEPT. AT THE CITY HALL | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
7 |
Status |
F |
Date |
2021-04-28 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-04-28 |
Time |
09:57 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-04-28 |
Time |
09:57 |
Sent To |
|
|
| Notes |
| 2021-04-28 09:57:32 | SHEET E1 VERSION 12/14/20 WAS DIGITALLY SIGNED; NEW | | | VERSION DATED 1/11/21 IS NOT DIGITALLY SIGNED. | | | | | | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. | | | DRAWINGS DO NOT SHOW IN "ADOBE READER" AS | | | DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR | | | ARCHITECT OR ENGINEER DOES NOT HAVE AN ELECTRONIC OR | | | DIGITAL SIGNATURE - YOU CAN MAIL IN OR DROP OFF THE | | | ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS TO THE | | | FRONT DESK IN THE BUILDING DEPT. AT THE CITY HALL | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
6 |
Status |
F |
Date |
2021-04-16 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-04-16 |
Time |
14:48 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-04-16 |
Time |
14:48 |
Sent To |
|
|
| Notes |
| 2021-04-16 14:49:44 | SHEET E1 VERSION 12/14/20 WAS DIGITALLY SIGNED; NEW | | | VERSION DATED 1/11/21 IS NOT DIGITALLY SIGNED. | | | | | | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. | | | DRAWINGS DO NOT SHOW IN "ADOBE READER" AS | | | DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR | | | ARCHITECT OR ENGINEER DOES NOT HAVE AN ELECTRONIC OR | | | DIGITAL SIGNATURE - YOU CAN MAIL IN OR DROP OFF THE | | | ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS TO THE | | | FRONT DESK IN THE BUILDING DEPT. AT THE CITY HALL | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
5 |
Status |
F |
Date |
2021-03-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-03-01 |
Time |
11:32 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-03-01 |
Time |
11:28 |
Sent To |
|
|
| Notes |
| 2021-03-01 11:38:17 | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | SHEET E1 VERSION 12/14/20 WAS DIGITALLY SIGNED; NEW | | | VERSION DATED 1/11/21 IS NOT DIGITALLY SIGNED. | | | | | | | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
P |
Date |
2021-02-01 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-02-01 |
Time |
09:22 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-02-01 |
Time |
09:22 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2021-01-28 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-01-28 |
Time |
10:42 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-01-28 |
Time |
10:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2020-12-17 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-12-17 |
Time |
13:30 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-12-17 |
Time |
13:30 |
Sent To |
|
|
| Notes |
| 2020-12-17 13:31:30 | THE MECHANICAL DRAWING AND THE SURVEY NEED TO BE | | | ELECTRONICALLY SIGNED AND SEALED - SIGNED AND SEALED | | | DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. | | | DRAWINGS DO NOT SHOW IN "ADOBE READER" AS | | | DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR | | | ARCHITECT OR ENGINEER DOES NOT HAVE AN ELECTRONIC OR | | | DIGITAL SIGNATURE ? YOU CAN MAIL IN OR DROP OFF THE | | | ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS TO THE | | | FRONT DESK IN THE BUILDING DEPT. AT THE CITY HALL |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2020-11-24 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-11-24 |
Time |
14:48 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-11-24 |
Time |
14:48 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2020-11-23 |
|
|
Cont ID |
|
| Sent By |
rthermid |
Date |
2020-11-23 |
Time |
|
Rev Time |
|
| Received By |
rthermid |
Date |
2020-11-23 |
Time |
|
Sent To |
I |
|
| Notes |
|
|