Plan Review Details - Permit 20110404
Plan Review Stops For Permit 20110404
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2020-11-28 Cont ID  
Sent By cthroop Date 2020-11-28 Time 15:28 Rev Time 0.00
Received By cthroop Date 2020-11-28 Time 15:20 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-12-03 Cont ID  
Sent By ppetty Date 2020-12-03 Time 09:58 Rev Time 0.00
Received By ppetty Date 2020-12-03 Time 09:48 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2020-11-30 Cont ID  
Sent By lcrespo Date 2020-11-30 Time 11:40 Rev Time 0.00
Received By lcrespo Date 2020-11-30 Time 11:40 Sent To  
Notes
2020-11-30 11:42:52GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN
 THIS SUBMITTAL PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN
 PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND PLANS
 WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE
 RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT
 REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER
 THE WPB AMENDMENTS TO FBC SEC. 107.2.1.
  
 A SUB GAS PERMIT IS REQUIRED BY A LICENSED CONTRACTOR
 FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS TO THE FBC
 SEC. 105.1.
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-12-15 Cont ID  
Sent By lcrespo Date 2020-12-15 Time 12:16 Rev Time 0.00
Received By lcrespo Date 2020-12-15 Time 12:15 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-12-03 Cont ID  
Sent By ppetty Date 2020-12-03 Time 09:59 Rev Time 0.00
Received By ppetty Date 2020-11-23 Time 09:26 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2020-12-15 Cont ID  
Sent By lcrespo Date 2020-12-15 Time 12:31 Rev Time 0.00
Received By lcrespo Date 2020-12-15 Time 12:30 Sent To  
Notes
2020-12-15 12:31:2612/15/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING/POOL)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2020-11-30 Cont ID  
Sent By lcrespo Date 2020-11-30 Time 11:42 Rev Time 0.00
Received By lcrespo Date 2020-11-30 Time 11:42 Sent To  
Notes
2020-11-30 12:02:1911/30/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE
 MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM
 ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN
 DETERMINING THE MAXIMUM SYSTEM FLOW RATE PER
 ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013
 EDITION ADDRESSES THE FLOW RATE IN GALLONS PER MINUTE
 (GPM). IT REQUIRES THAT THE MAXIMUM SYSTEM FLOW RATE
 DOES NOT EXCEED THE LISTED MAXIMUM FLOW RATE OF THE
 SUCTION OUTLET FITTING ASSEMBLY (DRAIN COVER). THE TDH
 CALCULATIONS MUST INCLUDE ALL THE SYSTEM COMPONENTS
 INCLUDING SUCTION AND RETURN PIPING, FITTINGS, VALVES,
 HEATER, FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS
 EXCEPT THE PUMP.
  
 2. SUBMIT THE POOL PUMP CURVE. IDENTIFY ON THE PUMP
 CURVE WHICH CURVE KEY IS SPECIFIC TO THE PUMP BEING
 INSTALLED ON THIS POOL. THIS IS NEEDED TO CONFIRM THE
 MAXIMUM SYSTEM FLOW FROM THE TDH CALCULATIONS PER THE
 ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1.
  
 3. SOLAR COVER REQUIRED PER 2017 FBC RE 403.10.3.
  
 4. SUBMIT DOCUMENTATION THAT THE GAS POOL HEATER MEETS
 THE MINIMUM REQUIRED EFFICIENCY OF 82% PER THE 2017
 FBC-ENERGY SEC. R403.10.4.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-11-28 Cont ID  
Sent By cthroop Date 2020-11-28 Time 15:28 Rev Time 0.00
Received By cthroop Date 2020-11-28 Time 15:20 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2020-12-03 Cont ID  
Sent By rthermid Date 2020-12-03 Time   Rev Time  
Received By rthermid Date 2020-12-03 Time   Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved